211620

CONDITIONAL

Galway - Galway County Council

Proposed Development

for the construction of new dwelling with garage along with new service connections and all associated site works. Gross floor space of proposed works: 340 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Sept 2021

  2. Further information requested

    29 Oct 2021

  3. Further information received

    30 Mar 2022

  4. Decision due

    26 Apr 2022

  5. Decision: CONDITIONAL

    26 Apr 2022

  6. Grant issued

    6 Jun 2022

Application Details

Location
Headford ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Floor Area
340 sq m
Residential Units
1

Timeline

Registration Date
6 September 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 April 2022
Grant Date
6 June 2022
Permission Expires
5 June 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

35m
2460305N/A21 Mar 2024

for the existing dwelling house with basement, domestic garage, and all associated services, all on revised site boundaries from that previously granted under planning reference no. 18/980

Headford , Co. Galway , Co. Galway

35m
2460786CONDITIONAL27 Jun 2024

of the existing dwelling house with basement, domestic garage and all associated services, all on revised site boundaries from that previously granted under planning reference No. 18/980. Gross floor space of work to be retained: 350 sqm (house) & 60 sqm (garage)

Headford , Co. Galway , H91 AH9F

45m
2661327N/A30 Jul 2026

for the construction of 16 no. dwelling houses comprising of the following; 10 no. 3 Bed Semi-Detached 2 storey houses, 4 no. 3 Bed Terraced 2 storey houses, 1 no. 4 Bed Detached 2 and a half storey house, and 1 no. 2 Bed Bungalow; Provision of vehicular access into the site via the existing housing estate at Eallagh to the west with reservation for possible future vehicular access onto the N84 to the east; Provision of new pedestrian connectivity on to the N84, with provision of a new footpath to connect with the existing footpath further to the north towards the town centre, together with the provision of dropped kerbs at existing vehicular entrances along the N84; Provision of ducting to facilitate public lighting along the proposed footpath at the edge of the N84; Provision of car parking to include EV parking and ducting to all spaces for future EV charging points; Provision of a centrally located communal open space area, private open space areas, landscaping, footpaths, raised crossing point, bicycle stands, public lighting, groundworks and revised boundary treatments; Connection to watermain, relocation of existing sewer and storm water network on site and connection to same, together with all ancillary site works and services

Headford , Eallagh , Co. Galway

54m
2361498CONDITIONAL14 Dec 2023

of dwelling house, domestic garage and all associated services on revised site boundaries to those granted under previous planning reference no. 47509

Headford , Headford , Co. Galway

56m
2261135REFUSED10 Nov 2022

for the A.The construction of 16 no. houses. These houses to consist of: 8 no. 3 bedroom semi-detached two storey units, 6 no. 3-bedroom mid-terrace two storey units, 1 no. 2 bedroom single storey bungalow and 1 no. 4 bedroom detached two storey unit. B. The provision of a vehicular access point off Galway Road (N84), C. Central communal open space area, D. Internal road, raised pedestrian crossing and pedestrian connectivity via the existing Eallagh estate, E. Public realm landscaping & new boundary treatments, F. Connection to watermain, relocation of existing sewer and storm water network on site and connection to same, together with all ancillary site works and services.Gross floor space of proposed works 1894 sqm.

Eallagh , Headford , Co. Galway

103m
19548REFUSED11 Apr 2019

for the construction of a serviced dwelling and associated services. Gross floor space of proposed works: 122 sqm

Headford ,

103m
191697CONDITIONAL31 Oct 2019

for an extension and alterations to an existing dwelling and associated services. Gross floor space of proposed works: 132 sqm

Headford ,

130m
19999CONDITIONAL28 Jun 2019

of second floor and elevation alterations to 2 No houses on site numbers 77 and 82 Eallagh, for development approved under Planning Reference No. 06/2696. Gross floor space of work to be retained: 56.4 sqm

Headford ,

134m
191001CONDITIONAL28 Jun 2019

for 21 No. residential units, comprising of 16 No. 3 Bedroom semi-detached dwellings, 04 No. 4 bedroom semi-detached dwellings, 01 No. 4 bedroom detached dwellings, with connection of all units to existing water supply, public sewer, storm water sewer. The provision of temporary construction site access route with site compound and all ancillary site services. Gross floor space of proposed works: 3044 sqm

Headford ,

134m
25125UNCONDITIONAL27 May 2025

for 21 No. residential units, comprising of 16 No. 3 Bedroom semi-detached dwellings, 04 No. 4 bedroom semi-detached dwellings, 01 No. 4 bedroom detached dwellings, with connection of all units to existing water supply, public sewer, storm water sewer. The provision of temporary construction site access route with site compound and all ancillary site services. Gross floor space of proposed works: 3044 sqm