Development consisting of removing the old effluent treatment system and associated pipe work. The installation of a new Tricel Novo P6 effluent treatment system incorporating pumping system, two Tricel Puraflo Modules constructed on a 300mm washed gravel bed, plus ancillary site works.
View the full application file on the council's planning portal →Application Timeline
Application received
12 May 2021
Decision due
6 Jul 2021
Decision: CONDITIONAL
6 Jul 2021
Grant issued
10 Aug 2021
Application Details
- Location
- Silverhill , Ballinfull , Grange
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.161 ha
- Floor Area
- 34 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 12 May 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 6 July 2021
- Grant Date
- 10 August 2021
- Permission Expires
- 9 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The renovation and extension of my existing (semi-derelict) dwellinghouse and for the installation of a domestic effluent treatment system and polishing filter, together with all associated site works and services
Silverhill , Ballinfull , Co. Sligo
for development consisting of the proposed construction of a new dwelling, detached garage, vehicular access to public road, onsite waste water treatment system, landscaping and all associated site works
Cloonelly , Sligo
development consisting of the disconnection from the existing foul treatment system and construction of a new on site treatment system consisting of a proprietary treatment plant and polishing filter and all associated site works
Clooneely , Grange , Co Sligo
Permission for the demolition of the existing flat roof side extension and construction of a new larger side extension in its place, removal of the existing front porch, internal alterations and associated alterations to the rear elevation and and all associated site works to the existing detached dwelling at Cloonelly, Grange, Co. Sligo, F91 F761.
Cloonelly , Grange , Co. Sligo
the demolition of elements of the existing outbuildings, the demolition of elements of the existing dwelling and the construction of a new single storey extension to the rear of the existing dwelling, internal and external alterations and refurbishment works to the existing dwelling including the reproportioning of the windows to the front elevation, the widening and slight repositioning of an existing entrance to the site for use as the main vehicular access to the site and the closure of the existing entrance and new wastewater treatment system and polishing filter together with all associated site development works.
Ellen's Cottage Cloonaghbawn , Ballinfull , Co. Sligo
development consisting of (1) alterations and extensions to our existing dwelling house (2) new effluent treatment system and percolation area (3) retention of the existing site entrance and (4) all associated site works
Cloonaghbawn , Ballinfull , County Sligo
PP & PR - development consisting of (1) alterations and extensions to our existing dwelling house (2) new effluent treatment system and percolation area (3) retention of existing site entrance (4) retention of existing extension to the rear and (5) all associated site works.
Cloonaghbawn , Ballinfull , Co Sligo
development consisting of the following ; to retain and complete the change of design to house extensions as previously granted under PL20/81, changes inculde (1) increased eaves height and provision of dormers to front and rear elevations (2) enlarged window to rear elevation (3) revisions to front entrance porch and all associated site work
Cloonaghbawn , Ballinfull , Co. Sligo
WE, CONOR MULLOY & KATHRYN MAGUIRE intend to apply for retention permission for development at this site MOUNT EDWARD, BALLINFULL, CO.SLIGO F91NP78. The development will consist of THE DEMOLITION OF EXISTING LEAN-TO EXTENSION AND SUNROOM, RENOVATION AND REFURBISHMENT OF THE EXISTING DERELICT DWELLING HOUSE, CONSTRUCTION OF A NEW TWO-STOREY EXTENSION, INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER TOGETHER WITH ALL ASSOCIATED PIPEWORK AND ANCILLARY WORKS, PROVISION OF A SURFACE WATER DRAINAGE SYSTEM INCLUDING SOAKAWAY, UPGRADING OF THE EXISTING VEHICULAR ENTRANCE, CONSTRUCTION OF NEW DRIVEWAY AND ENTRANCE COURTYARD AREA, LANDSCAPING, BOUNDARY TREATMENTS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS.
Mount Edward , Ballinfull , Co.Sligo
THE DEMOLITION OF EXISTING LEAN-TO EXTENSION AND SUNROOM, RENOVATION AND REFURBISHMENT OF THE EXISTING DERELICT DWELLING HOUSE, CONSTRUCTION OF A NEW TWO-STOREY EXTENSION, INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER TOGETHER WITH ALL ASSOCIATED PIPEWORK AND ANCILLARY WORKS, PROVISION OF A SURFACE WATER DRAINAGE SYSTEM INCLUDING SOAKAWAY, UPGRADING OF THE EXISTING VEHICULAR ENTRANCE, CONSTRUCTION OF NEW DRIVEWAY AND ENTRANCE COURTYARD AREA, LANDSCAPING, BOUNDARY TREATMENTS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
Mount Edward , Ballinfull , Co.Sligo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?