The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

211718

N/A

Tipperary - Tipperary County Council

Proposed Development

dwelling, entrance, garage, sewage treatment system and all ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Nov 2021

  2. Further information requested

    25 Jan 2022

  3. Further information received

    21 Mar 2022

  4. Application withdrawn

    14 Apr 2022

Application Details

Location
Cooneen , Portroe , Nenagh
Applicant
N/A
Application Type
OUTLINE PERMISSION
Planning Authority
Tipperary County Council
Site Area
1.28 ha

Timeline

Registration Date
26 November 2021
Status
WITHDRAWN
Decision
N/A
Withdrawn
14 April 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

593m
2423CONDITIONAL12 Feb 2024

domestic car port and stores as constructed

Laghtea , Portroe , Nenagh

644m
18600420CONDITIONAL6 Apr 2018

milking parlour including ancillary underground slatted tank, dairy, store/office, pump room, unroofed collection yard and holding area together with a calf shed and associated siteworks

Cloneybrien/Ballingeer , Portroe , Nenagh

646m
2260747N/A30 Dec 2022

a single storey dwelling, treatment plant, entrance and all ancillary works

Cooneen , Portroe , Co. Tipperary

646m
2460846CONDITIONAL3 Oct 2024

single storey dwelling, treatment plant, entrance and all ancillary works

Cooneen , Portroe , Co Tipperary

697m
2460199CONDITIONAL22 Mar 2024

a side extension, extension to front porch and alterations to existing dwelling and all ancillary works

Laghtea , Ballina , Co. Tipperary

735m
2360066N/A1 Feb 2023

existing mobile home and all associated ancillary works on a temporary basis and Permission for dwelling, entrance, garage, sewage treatment system and all ancillary works

Ballingeer , Portroe , Co Tipperary

754m
17600834CONDITIONAL26 Jul 2017

dwellinghouse, garage, waste water treatment system, percolation area, entrance and all ancillary site works

Castletown , Portroe , Nenagh

756m
2360731CONDITIONAL14 Sept 2023

a dwelling, entrance, garage, sewage treatment system and all ancillary works

Ballingeer , Portroe , Co. Tipperary

757m
2260735N/A22 Dec 2022

a dwelling, entrance, garage, sewage treatment system and all ancillary works and retention of existing mobile home and all associated ancillary works on a temporary basis

Ballingeer , Portroe , Co. Tipperary

837m
24197CONDITIONAL30 Aug 2024

1. ) existing main house (371 sq.m) reconfiguration of rooms on all three levels including moving kitchen to entrance level, new bathrooms on basement and entrance levels, existing 1990's extension to have a new window, new rooflight and enlarged gable window with new access to a new terrace (10 sq.m), 2.) existing outbuilding (158 sq.m) change of use to two storey, two bedroom dwelling (140 sq.m), partial demolition of ancillary building (12 sq.m), 3) new timber clad storage shed of (80 sq.m) adjacent to existing vehicular entrance, New waste treatment system and associated percolation area - protected structures TRPS 610 and TRPS 611

Castletown Glebe , Castletown , Portroe Nenagh Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?