211751

REFUSED

Limerick - Limerick County Council

Proposed Development

a takeaway coffee container, staff container and totem sign along with associated site works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Dec 2021

  2. Decision: REFUSED

    17 Feb 2022

  3. Decision due

    18 Feb 2022

Application Details

Location
The Dock Road , Limerick
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council

Timeline

Registration Date
16 December 2021
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
17 February 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
22984REFUSED9 Sept 2022

construction of a coffee takeaway structure together with ancillary service structures, site works and services including signage

The Dock Road , Limerick.

54m
191297CONDITIONAL23 Dec 2019

a free-standing sign and associated site works

BOC Gases Ireland Ltd. , Dock Road , Limerick.

68m
211697CONDITIONAL8 Dec 2021

development comprising a change of use to part of an existing commercial/retail warehouse building, alteration to the front elevation and the provision of building signage. The change of use is sought from existing retail warehouse and showroom use (currently restricted by condition to the sale of DIY goods and building products permitted under planning reference number 92/770409) to commercial/retail warehouse use to facilitate packaging, storage and distribution of goods with the associated sale of general bulky products, ancillary products and the sale of coffee for consumption off the premises

Dock Road , Corcanree , Limerick

97m
20723CONDITIONAL27 Jul 2020

development on a brownfield, light industrial zoned site at Dock Road, Limerick. Retention permission is sought for 20 no. containers on site(no.'s 1-20) and the use of such containers for self storage purposes, and the provision of boundary fencing and an electric gate controlling access in to the site. Planning permission is sought for 18 no. containers on site(no.'s 21-39) and the use of such containers for self storage purposes, 8 no. on site car parking spaces, completion of boundary fencing and provision of signage. Access to the site is via a right of way which utilises the existing commercial site access that served the former Heiton Buckley Providers operation on site

Dock Road , Limerick

145m
221280CONDITIONAL2 Dec 2022

a 7-year planning permission for demolition of 3 no. commercial buildings and removal/demolition of a number of sheds/outbuildings, refurbishment of Block B an existing warehouse building (1,140sqm), provision of 3 no. retail warehouse units (total 2,593sqm) in Block D fronting onto Dock Road, provision of 2 no. logistics warehouse units in Block H (2,790sqm) with an optional mezzanine floor which has the potential to increase floorspace by 350sqm, provision of 34 no. commercial/enterprise units delivered in 5 no. blocks (A, B1, E, F & G) with a total floor area of 9547sqm and an optional mezzanine floor area which has the potential to increase the overall floor area by 1,870sqm, if constructed, totem and building signage and all associated site works including provision of an ESB substation, pumping station and emergency storage, PV panels, mechanical ventilation mounting plant and external condenser units. Primary access to the site will be through the Corcanree Business Park via the Greenpark Roundabout. The existing access serving the site from Dock Road will be restricted to a left in left out junction. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies the planning application

Dock Road , Corcanree , Limerick

163m
18701CONDITIONAL9 Jul 2018

1. the demolition of a single storey office space to the front of an existing warehouse, 2. the construction of a two-storey office & canteen space in its place, 3. a canopy and elevational changes to the rear of the existing warehouse, 4. connections internally to adjoining Unit A5 and 5. all ancillary site works

Unit A4 , Corcanree Indsutrial Estate , Dock Road Limerick.

165m
2561240CONDITIONAL27 Nov 2025

the construction of a ground floor retail area linked to the rear existing warehouse and a first-floor office space all at Unit A4, Corcanree Business Park, Dock Road, Limerick V94 HR2P. The proposed ground and first floor levels of Unit A4 are also to be linked to the adjoining floor levels of unit A5. Permission is also applied for a canopy and elevational changes to the rear of the existing Unit A4 warehouse. The proposed development is to include all ancillary works

Unit A4 Corcanree Business Park , Dock Road , Limerick City

173m
191294CONDITIONAL23 Dec 2019

the construction of first floor office space and ground floor service department within existing warehouse linking to the office space granted under planning ref. 18/701 and all ancillary works

Unit A4 , Concanree Industrial Estate , Dock Road Limerick.

185m
21710CONDITIONAL24 May 2021

erection of 2114.67sqm of photovoltaic panels on the roof of existing raw product storage unit and existing bagged product storage unit in our factory with all associated site works

Dock Road , Limerick

190m
18656CONDITIONAL29 Jun 2018

construction of an extension to the existing process mill to the rear of existing building, associated fire fighting water storage tank and associated site works

Corcanree , Dock Road , Limerick.