Proposed Development

to construction a storey and a half split level dwelling with garage, new site entrance and associated boundary realignment. and all site development works including new effluent treatment plant and percolation area

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Dec 2021

  2. Decision: CONDITIONAL

    23 Feb 2022

  3. Decision due

    25 Feb 2022

  4. Grant issued

    29 Mar 2022

Application Details

Location
Newtown , Fethard , Co Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Floor Area
305.35 sq m
Residential Units
1

Timeline

Registration Date
23 December 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 February 2022
Grant Date
29 March 2022
Permission Expires
28 March 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
20883REFUSED7 Aug 2020

a 1.5 storey dwelling, domestic garage, entrance, install septic tank including associated site works

Newtown (Ed Colman) , Fethard , Co. Tipperary

1m
2093REFUSED4 Feb 2020

build a 1.5 storey dwelling, domestic garage, entrance, install septic tank including associated site works

Newtown , (Ed Colman) , Fethard

45m
20122N/A12 Feb 2020

1.5 storey extension to rear of existing dwelling consisting of sitting room and playroom

Market Hill (Newtown) , Fethard , Co. Tipperary

53m
20205N/A6 Mar 2020

1.5 storey extension to rear of existing dwelling consisting of sitting room and playroom

Market Hill (Newtown) , Fethard , Co. Tipperary

62m
19601388N/A12 Dec 2019

1 1/2 story extension to rear existing dwelling for sitting room and playroom

Market Hill , Fethard , Co. Tipperary

66m
20244CONDITIONAL13 Mar 2020

1.5 storey extension to rear of existing dwelling consisting of sitting room and playroom

Market Hill (Newtown) , Fethard , Co. Tipperary

188m
21171CONDITIONAL16 Feb 2021

1. Change site boundaries from that as previously granted under 18601166, 2. Retention Planning Permission for design alterations; on-site position adjustment of as-constructed dwelling from that as previously granted under 18601166

Commons , Fethard , Co. Tipperary

190m
18601166CONDITIONAL25 Sept 2018

construction of a 1 and 1/2 storey/bungalow dwelling, entrance onto laneway, wastewater treatment system with percolation area, connection to mains water, soakpits and all other associated site works

Commons , Fethard , Co. Tipperary

318m
2461113CONDITIONAL19 Dec 2024

carrying out alterations to site entrance to the property including boundary set back to improve sight lines

Newtown , Fethard , Co. Tipperary

364m
20384CONDITIONAL16 Apr 2020

construction of a new entrance to my land, new access roadway and set back boundary fence including all associated site development works

Market Hill , Fethard , Co. Tipperary

Planning a project of your own?