The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2119

N/A

Tipperary - Tipperary County Council

Proposed Development

construction of a single storey dwelling, detached domestic garage, new access from existing farm roadway, advanced wastewater treatment system and polishing filter, connection to necessary services together with all associated site and incidental works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Jan 2021

  2. Further information requested

    4 Mar 2021

  3. Application withdrawn

    3 Dec 2021

Application Details

Location
Coosane , Birdhill , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.491 ha
Floor Area
270 sq m
Residential Units
1

Timeline

Registration Date
11 January 2021
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
3 December 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

15m
201574N/A22 Dec 2020

construction of a single storey dwelling, detached domestic garage, new access from existing farm roadway, advanced wastewater treatment system and polishing filter, connection to necessary services together with all associated site and incidental works

Coosane , Birdhill , Co. Tipperary

25m
2360968CONDITIONAL5 Dec 2023

a single storey dwelling, detached domestic garage, new access from existing farm roadway, advanced wastewater treatment system and polishing filter, connection to necessary services together with all associated site and incidental works

Coosane , Birdhill , Tipperary

25m
2260097N/A1 Mar 2022

construction of single storey dwelling, detached domestic garage, new access from existing farm roadway, advanced wastewater treatment system and polishing filter, connection to necessary services together with all associated site and incidental works

Coosane , Birdhill , Tipperary

289m
2360401CONDITIONAL13 Jun 2023

(a)proposed Part 1.5 storey/ part single storey dwelling, (b) proposed single storey garage ancillary to proposed dwelling, (c) proposed new treatment system, percolation area, (d) proposed new entrances from lane accessing onto public road and all associated site works and ancillary services

Clare View Coosane , Birdhill , Co. Tipperary

668m
18600079CONDITIONAL26 Jan 2018

the development consisting of the retention of an existing 65m.sq. steel storage shed (9.6mX6.7mX4.7m) on a concrete base, used in connection with the management of ESB fisheries

Sleepy Hollow , Parteen Weir , Birdhill

752m
2080CONDITIONAL31 Jan 2020

construction of a dairy unit/cubicle shed with a slatted tank holding yard

Curraghdromin , Birdhill , Co. Tipperary

761m
211453CONDITIONAL1 Oct 2021

construction of a two-storey and part single storey extension to the rear of the farm dwelling, while also reusing the original footprint of the existing single storey storage shed/garage

Curraghdrumin , Birdhill , Co Tipperary

765m
211381N/A17 Sept 2021

construction of a two-story extension to rear of dwelling, while also reusing the original footprint of the existing single story storage shed/garage

Curraghdrumin , Birdhill , Co Tipperary

987m
21245CONDITIONAL1 Mar 2021

a new domestic garage

Coosane , Birdhill , Co. Tipperary

1.1km
17600202CONDITIONAL2 Mar 2017

extensions to the front and rear and alterations to the existing dwellinghouse to include replacement & modifications of the roof, together with other ancillary alterations and permission for the replacement of the existing sub-standard septic tank & percolation area with a proprietary wastewater treatment system and polishing filter, replacement of the existing mono-pitch barn roof with a pitched slated roof to reinstate to its original design, construct new stone entrance walls & piers at the existing public road entrance, together with associated site works

The Farmyard , Birdhill , Co Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?