The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

21200

N/A

Tipperary - Tipperary County Council

Proposed Development

hotel accommodation for 24-bedroom suites across the existing and new farm, with new retail and café facilities open to the public. The development comprises of internal and external alterations, refurbishment and change of use to the existing Farmhouse, Cowsheds, and replacement of the existing Barn on the Farm at Moor Lane for self-contained hotel accommodation. The new farm complex is comprised of three single storey and part two storey buildings to the West, utilising the roof spaces in parts to accommodate an additional half storey for upper level bedrooms with dormer windows. The development also entails the construction of one new single storey building with a café restaurant and a retail facility for organic produce to the North. A new single storey building beside the Moor Lane entrance will provide the Hotel Reception. The materiality of the new and refurbished buildings will be a combination of painted render, rubble stone walling and vertical timber cladding to the facades, with either natural slate tiles or metal roofing systems. The proposed scheme includes the provision of 15 no. car parking spaces on the site, with associated landscaping to incorporate kitchen gardens, new pathways, and new entrances for enhanced connectivity through the site. The proposed development consists of associated works to the public realm, access and landscaping

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Feb 2021

  2. Application withdrawn

    14 Apr 2021

Application Details

Location
Moor Lane , The Rock , Cashel
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
19 February 2021
Status
WITHDRAWN
Decision
N/A
Withdrawn
14 April 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

27m
2260575N/A25 Oct 2022

the construction of twenty-eight hotel bedrooms in two blocks, each of one and a half storeys, landscaping, demolition of a hay shed, provision of new opening in boundary wall for emergency access and all ancillary development works

Moor Lane , Cashel , Co. Tipperary

41m
21164N/A15 Feb 2021

hotel accommodation for 24-bedroom suites across the existing and new farm, with new retail and café facilities open to the public. The development comprises of internal and external alterations, refurbishment and change of use to the existing Farmhouse, Cowsheds, and replacement of the existing Barn on the Farm at Moor Lane for self-contained hotel accommodation. The new farm complex is comprised of three single storey and part two storey buildings to the West, utilising the roof spaces in parts to accommodate an additional half storey for upper level bedrooms with dormer windows. The development also entails the construction of one new single storey building with a café restaurant and a retail facility for organic produce to the North. A new single storey building beside the Moor Lane entrance will provide the Hotel Reception. The materiality of the new and refurbished buildings will be a combination of painted render, rubble stone walling and vertical timber cladding to the facades, with either natural slate tiles or metal roofing systems. The proposed scheme includes the provision of 15 no. car parking spaces on the site, with associated landscaping to incorporate kitchen gardens, new pathways, and new entrances for enhanced connectivity through the site. The proposed development consists of associated works to the public realm, access and landscaping

Moor Lane , The Rock , Cashel

114m
17600336CONDITIONAL3 Apr 2017

the development consisting of alterations and extensions to, and refurbishment of, the Cashel Palace Hotel to provide a 61-bedroom hotel, function room, spa/ leisure centre, 2 restaurants and a hotel bar. The development will include alterations and extensions to, the Cashel Palace (including the former Bolton Library),school house, gate lodge, coach house , managers house and the provision of additional bedroom accommodation, a function room and a spa/leisure centre. The development will also include reconfiguration of the existing public car park, provision of additional car parking; vehicular set down area; the provision of a new town park; amendments to pub garden layout permitted under planning ref.16/600517 and associated ancillary development works including access, landscaping , works to the public realm and ancillary services. The works will be carried out within the curtilage of the following 6 structures on the Record of Protected Structures of the Cashel and Environs Development Plan 2009-2015:RPS Ref 7 (Cashel Town Walls);RPS Ref 8(Cashel Palace Hotel); RPS Ref 44 (P and T post box);RPS Ref 80( Palace School House);RPS Ref 81(Cashel Palace Gate Lodge) and RPS Ref 83 (M. Ryan's)and include works to 3 of these protected structures(RPS Refs.8,80 and 81.

Cashel Palace Hotel , Main Street , Cashel

115m
20152CONDITIONAL19 Feb 2020

construction of a single-storey extension to the rear of the existing dwelling, incorporation of a section of garden party wall with gable end of the proposed building and internal modifications to existing dwelling/facades and all associated works

2 Rock Villas , Rock Lane , Cashel

137m
2461038CONDITIONAL4 Dec 2024

construction of a single-storey extension to the rear and side of dwelling, make minor modifications to the existing dwelling and all associated site development works

18 Dominic St. , Cashel , Co. Tipperary

140m
2460515CONDITIONAL26 Jun 2024

the construction of 4 no. dwelling houses with on-street parking and ancillary works

Colliers Lane Moor , Cashel , Co. Tipperary

144m
19600156CONDITIONAL25 Feb 2019

the demolition of an existing 132.25 sq m single storey structure, previously used as a store, and the provision of a new 170.5 sq m two storey building, incorporating an office, staff changing facilities, waste store, substation and associated electrical room. A new 3m wide passageway is also provided to the north of the building and will provide a new service entrance to Cashel Palace Gardens. The new building will connect with Cashel Palace Hotel's Coach House, which is to be rebuilt for use as an office accommodation under planning reference 18/601440. The works are within the curtilage of RPS 7 (Cashel Town Walls)

Chapel Lane/Dominic Street , Cashel , Co. Tipperary

156m
2660036CONDITIONAL20 Jan 2026

change of use of existing commercial unit, no 9, to a residential unit and all associated site works

Dominics Court Bank Place , Cashel , Co.Tipperary

165m
19600898CONDITIONAL15 Aug 2019

modifications to development permitted under planning reference 17/600336, and previously modified under planning reference 18/601440. The development previously permitted is for alterations and extensions to and refurbishment of the Cashel Palace Hotel, including demolition works. This application for permission provides for a total increase of 130m2 in floor area in the ballroom and pre-function areas; an increase in height (of approximately 0.49m) for the rooftop ballroom and plant screening; increased plant area on the roof of the ballroom back of house area; additional concealed rooftop plant to the west stairwell; lead clad plant screening to west link elevation; a new opening in a stone wall to facilitate operational access to the ballroom; a new opening in the basement of the Bolton library to allow access to an external yard; relocation of 2 no. windows from the east bedroom block elevation to the north; modification of a gable roof to a hipped roof on the new bedroom block; change of use of a dressing room to an office in the Bishop’s Palace; change of use of a kitchen building to a plantroom and store and amendments to ancillary works. The application for retention permission provides for amendment to the detailing of storm water drainage works serving the new car park. The works will be carried out within the curtilage of the following 6 structures on the Record of Protected Structures of the Cashel and Environs Development Plan 2009-2015: RPS Ref 7 (Cashel Town Walls); RPS Ref 8 (Cashel Palace Hotel); RPS Ref 44 (P and T Post Box); RPS Ref 80 (Palace School House), RPS Ref 81 (Cashel Palace Gate Lodge) and RPS Ref 83 (M Ryans) and include works to 2 of these protected structures (RPS Refs. 7 and 8)

Cashel Palace Hotel , Main Street and St. Patrick's Rock , Cashel

166m
2360809CONDITIONAL10 Oct 2023

internal alterations and external alterations, to include replacement roof cladding and windows, and the construction of a 18 sq.m. single storey extension to rear (south), removal of existing sheds to rear (south) and increase of boundary wall height to west and partially to north, all at the existing cottage (this property is a protected structure)

Moor Lane , Cashel , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?