212010

N/A

Galway - Galway County Council

Proposed Development

to 1) demolish existing semi ruinous structure on site, 2) construct a new dwelling house, 3) installation of new effluent treatment system and polishing filter as well as all associated site works and site services. Gross floor space of proposed works: 212 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Oct 2021

  2. Application withdrawn

    22 Dec 2021

Application Details

Location
Dawros More ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
212 ha
Floor Area
212 sq m
Residential Units
1

Timeline

Registration Date
28 October 2021
Status
WITHDRAWN
Decision
N/A
Withdrawn
22 December 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
201559REFUSED22 Oct 2020

to [1] construct a new side and front elevation extension to the existing house [2] external and internal alterations to existing house [3] installation of new effluent treatment system and polishing filter as well as all associated site works and site services. This planning application is accompanied by a Natura Impact Statement. Gross floor space of proposed works; 142.25 msq ; Gross floor space of work to be retained 39sqm; Gross floor space of any demolition; 3.8 sqm

Dawros More ,

185m
2260401CONDITIONAL27 Apr 2022

to construct a new dwelling house, effluent treatment system and polishing filter as well as all ancillary site works. Gross floor space of proposed works 137.50 sqm

Dawros More ,

645m
191988CONDITIONAL20 Dec 2019

for an extension to the side of existing dwelling, single storey garage and all associated works. Gross floor space of proposed works: 257 sqm, Gross floor space of work to be retained: 288 sqm

Dawros More ,

724m
21793CONDITIONAL13 May 2021

to construct a new dwelling house, effluent treatment system and polishing filter, new vehicular entrance as well as all ancillary site works and site services. Gross floor space of proposed works: 224.69 sqm

Dawros More ,

724m
2142REFUSED21 Jan 2021

to construct a new dwelling house, effluent treatment system and polishing filter, new vehicular entrance as well as all ancillary site works and site services. Gross floor space of proposed works: 224.69 sqm

Dawros More ,

728m
18113REFUSED7 Feb 2018

for the construction of a new store/processing shed and all ancillary siteworks and services. Gross floor space of proposed works 90 sqm.

Dawros Beg ,

766m
201167REFUSED20 Aug 2020

to construct a new dwelling house, effluent treatment system and polishing filter, new vehicular entrance as well as all ancillary site works and site services. Gross floor space of proposed works: 209.00 sqm

Dawros More Letterfrack ,

820m
221042CONDITIONAL12 Sept 2022

for (a) of house to revised house plans, (b) retention of house on revised site boundary, (c) removal of condition 1 of 96/2015 and 98/2903 (perpetual restriction of use), (d) replacement of sub-standard treatment system. Gross floor of space of work to be retained: 192.2 sqm

Dawros More , Letterfrack , H91 AFD6

944m
19683N/A8 May 2019

of existing dwelling house, garages and associated site services. Gross floor space of work to be retained: 107.00 sqm (Dwellings), 19.33 sqm (Garage)

Dawros More ,

944m
20104CONDITIONAL30 Jan 2020

of (1) existing dwelling house and sheds on revised site boundaries (2) permission to replace existing septic tank and percolation area with a new effluent treatment system and polishing filter area. Gross floor space of work to be retained: 107.00 sqm (House) and 19.33 sqm (Garages)

Dawros More ,

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.