21312146
CONDITIONALLimerick - Limerick County Council
Proposed Development
works to facilitate an expansion of the disposal capacity at the existing Bauxite Residue Disposal Area (BRDA). The works will generally consist of the construction of rock fill embankments at the perimeter of the BRDA, offset internally and founded on the previously deposited and farmed bauxite residue, in 2 m high vertical lifts. The proposed development will result in the footprint of the BRDA decreasing as it increases in height. The proposed development will result in a c.12m increase in height (over that previously permitted under Limerick County Council Ref. 05/1836; An Bord Pleanála Ref. PL13.217976) to a maximum height of c.44m OD upon closure. The proposed expansion of the BRDA will provide for the deposition of an additional c. 8.0 million m3 bauxite residue over the lifetime of the development. The proposed development also provides for an expansion of the existing capacity of the Salt Cake Disposal Cell (SCDC), which is located within the BRDA through a vertical extension of the exiting perimeter wall and associated cell lining resulting in a c.2.25m crest height increase of the existing cell to c.31.25m OD and a maximum overall height of c.35.50m OD upon closure. The increase in capacity of the SCDC will provide for the storage of an additional c. 22,500 m3 of salt cake. Additional works include a c.3.9ha expansion of the permitted borrow pit (Limerick City and County Council Ref. 17/714; An Bord Pleanála Ref. ABP-301011- 18) to the east of the BRDA resulting in a total borrow pit area of c.8.4ha with a maximum depth of c. 8.5 m O.D and providing for an additional 380,000m3of rockfill with blasting and crushing of rock to occur between April and September each year. Further works include upgrades to the water management infrastructure to accommodate the BRDA development; the continued use of a stockpile area for rock and top-soil storage to the south east of the BRDA; use of top-soil and rock materials for the landscaped restoration and closure of the BRDA (including SCDC); restoration of the extended borrow pit extraction area; lighting; spillway ramps (drainage channels); revised boundary treatments and ancillary associated works above and below ground. Aughinish Alumina Limited carries out an activity on the site requiring an Industrial Emissions Licence (Licence Reg. No. P0035-07). This application is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement - https://www.pleanala.ie/en-ie/case/312146
View the full application file on the council's planning portal →Application Timeline
Application received
8 Dec 2021
Decision due
10 Feb 2022
Decision: CONDITIONAL
31 Aug 2022
Application Details
- Location
- Aughinish Alumina Limited , Aughinish Island , Askeaton Co. Limerick
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 8 December 2021
- Status
- DECISION MADE
- Decision
- CONDITIONAL
- Decision Date
- 31 August 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the demolition of the existing three span bridge and construction of a new single span bridge consisting of piled abutments and a stell truss superstructure to facilitate the potential future re-introduction of freight traffic on the Limerick to Foynes railway line at Churchfield/Island MacTeige. The existing intermediate piers will remain in place in a non load bearing capacity. The works also includes the temporary relocation of a salt marsh during the construction of the bridge structure. A Natura Impact Statement has been prepared for the development
Churchfield/Island MacTeige , Foynes , Limerick.
a ten year permission for development on this site of c. 7 hectares located adjoining the existing Aughinish Alumina Ltd plant for the provision of a Borrow Pit with an extraction area of c. 4.5 hectares to extract c. 374.000 m³ of rock over a 10 year period. The extraction area is sought up to a maximum depth of c. 8.5 m O.D., with extraction to occur between April and September each year. The proposed development includes the demolition of a contractors shed and all ancillary site development, areas of stockpiling, landscaping and boundary treatment works above and below ground, including restoration of the extraction area. Aughinish Alumina Limited carries out an activity requiring an Industrial Pollution Prevention and Control Licence (now replaced by an Industrial Emissions Licence – Licence Register No. P0035-06). The development and operation of the proposed Borrow Pit is not a licensable activity. An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the application.
Aughinish East Aughinish West Island Mac Teige Glenbane West Morgan North and Fawnamore at or adjacent to Aughinish Island , Askeaton , Co. Limerick
the provision of nature trail and upgrade of existing nature trail, construction of a car park comprising 29 no. car parking spaces, new vehicular access and associated landscaping and boundary treatment works. It is also sought to demolish existing derelict structures and a bird hide and construct a new bird hide in its place. A Natura Impact Statement(NIS) will be submitted to the planning authority with the application
Fawnamore & Aughinish East , Aughinish Island , Askeaton Co. Limerick
construction of extension to existing bulk storage units and all associates site works
Durnish , Shannon Foynes Port , Foynes Co. Limerick
Construction of three covered industrial type warehouse units with associated external storage, parking and circulation areas, Upgrade of existing site services and all ancillary works associated with the site development, The application is for a 10 year permission and will include the submission of an Natura Impact Statement (NIS) to the Planning Authority
Durnish Internal Port Road , Shannon Foynes Port , Co. Limerick
the construction of a single storey industrial packaging shed with conveyors supply mechanism, rectangular roller tray outfeed and all ancillary site works
Durnish Internal Port Road , Shannon Foynes Port , Foynes Co. Limerick.
Construction of three covered industrial type warehouse units with associated external storage, parking and circulation areas, Upgrade of existing site services and all ancillary works associated with the site development, The application is for a 10 year permission and will include the submission of an NIS to the Planning Authority.
Durnish Internal Port Road , Shannon Foynes Port , Co. Limerick
construction of a workshop at our existing facility including all associated site works. Works shall also include the dismantling/demolition of an existing store on the site
Foynes Harbour , Durnish Foynes , Co. Limerick
the construction of a 950m2 solar panel array with an export capacity of approximately 250KWh to be mounted on the roof of existing Bulk Store Warehouse to include ancillary works associated with the development
The Harbour , Foynes Port , Foynes Co. Limerick
a ten year permission for minor amendments to phase 1 of the approved development under reg. ref. 14/603 and later amendments under reg. ref. 15/818. Amendments will comprise of the following; (I) construction of a new 600 sq. m covered storage and packaging plant building to adjoin the existing approved production building, (II) reduction in size of the approved packaging area by 600 sq. m, (III) relocation of the permitted biomass torrefier building by 8m to accommodate the positioning of the new covered storage and packaging plant building, (IV) all associated ancillary site works
Durnish Internal Port Road , Shannon Foynes Port , Foynes Co. Limerick.