21334
REFUSEDSligo - Sligo County Council
Proposed Development
PP - development consisting of a renewable energy development on a 3.9 hectare site. The proposed development will constitute the provision of the following: Construction of a Biomass processing and storage area utilising forestry products. Construction of a Gasification and Methanation Plant including buildings for the production of advanced biofuels. Construction of a Gasification and Combined Heat Power Plant including building for the production of electricity and heating. Construction of Containerised Battery Storage Facility (20MW). Construction of a Thermal Energy recovery and storage facility including buildings for district heating distribution. Construction of two on-site 38kV substations. Creation of a new access from Finisklin Road. All ancillary development , including the provision of site office, car parking, internal access roads, perimeter landscaping, fencing, lighting, and on-site drainage. The Planning application is accompanied by a Natura Impact Statement.
View the full application file on the council's planning portal →Application Timeline
Application received
27 Aug 2021
Decision: REFUSED
20 Oct 2021
Decision due
21 Oct 2021
Appeal submitted
19 Nov 2021
Appeal decided: REFUSED
30 Jan 2023
Application Details
- Location
- Finisklin , Finisklin Road , Co Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 3.9 ha
Timeline
- Registration Date
- 27 August 2021
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 20 October 2021
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-311963-21
- Decision
- REFUSED
- Submitted
- 19 November 2021
- Decided
- 30 January 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Development consisting of the construction of a new Waste holding facility comprising of the construction of 2No 50,000l liquid storage tanks, 390sqm of hard standing and a new internal access route including all other associated site ancillary works and landscaping
Finisklin Business Park , Sligo
development, located to the northeast of the existing facility, will consist of a new ESB substation and switch room to serve the existing facility. The substation measures 45.7m2 in plan area and 3.5m in height. The switchroom and a back up generator will be located on a raised gantry that will measure 121m2 and 7m in height and be situated 3.5m above ground level
Finisklin Business Park , , Co Sligo.
development consisting of the demolition of an existing external waste water compound with an area of 43.35m2, a proposed waste compound with an area of 45.92m2, and a bicycle shelter with an area of 49.68m2, to construct a new 1-storey extension on the North elevation of the main building, consisting of gross ground floor manufacturing area of 208.00m2
Finisklin Business Park , Finisklin , Sligo
The Health Services Executive Capital & Estates Department North West, intend to apply for planning permission for a change of use at Unit 2, Duncan Island, Finisklin, Sligo. The development will consist of, a Change of Use from a Commercial Building to a Day Centre for people requiring support.
Unit 2 Duncan Island Finisklin Sligo , Unit 2 Duncan Island Finisklin Sligo , Unit 2 Duncan Island Finisklin Sligo
The Health Services Executive Capital & Estates Department North West, intend to apply for planning permission for a change of use at Unit 2, Duncan Island, Finisklin, Sligo. The development will consist of, a Change of Use from a Commercial Building to a Day Centre for people requiring support.
Unit 2 Duncan Island Finisklin Sligo , Unit 2 Duncan Island Finisklin Sligo , Unit 2 Duncan Island Finisklin Sligo
Permission for development consisting of the amalgamation of two existing warehouse units into a single warehouse unit, including demolition/removal of existing mezzanine floors, internal stairs and partitions, including office enclosure, toilet facilities and ceiling, construction of a new mezzanine floor including internal stair, minor modifications to the elevation to include a new customer entrance with associated signage behind the existing roller shutter doors, widening the existing roller shutter door opening, external signage and associated lighting, a new fire escape door and all necessary enabling works.
Units 6 and 7 , Finisklin Road , Sligo County Sligo
1. The amalgamation of two existing industrial warehouse units (unit 6 – 308 m2, unit 7 - 347.18 m2) with an existing parking and service area into an enlarged single unit – 772.42 m2, and the associated demolition / removal of the existing party wall, internal stairs, partitions walls, office enclosure, toilet areas, ceiling and mezzanine floor areas (81.82 m2). 2. Change of use for the new enlarged unit from light industrial use to a builders’ merchant / trade counter depot with ancillary warehouse, showroom/display, office and staff facilities. 3. Proposed works to include all necessary site and associated development works, including construction of a new mezzanine floor of 187 m2 and internal stair access, minor modifications to the elevations to include a new customer entrance with associated signage behind the existing roller shutter doors, widening of the existing roller shutter door opening, external signage and associated lighting, and a new fire escape door
Units 6 and 7 , Finisklin Road , Sligo
development consisting of the proposed building extension comprising of an additional 267.08m2 of manufacturing space, the demolition of an existing substation and construction of a new relocated substation with an area of 22.49m2 including all other associated site ancillary works
Finisklin , Business Park , Sligo
development consisting of: 1.The demolition of a portion of the existing industrial units (B & C)(810SQM) to facilitate the construction, in their place, of a new portal frame unit (unit B), similar in height to the main retained unit (A). 2. The re-cladding of the retained industrial unit (A) along with new glazed openings and access doors. The building will be clad with profiled insulated metal cladding. 3. The resurfacing and upgrading of the associated service yard, the access route from Finisklin road and existing car parking to facilitate the new development and the provision of secure and sheltered bicycle parking with additional staff car parking spaces to the rear of the site. 4. All associated site and civil works including rainwater attenuation.
Finisklin Road , Finisklin Business Park , Sligo
development consisting of a proposed two storey office building (gross floor area of 1774.4 m2), adjacent bike shelter (10.5 m2) and a car park comprising 224 parking spaces and all other associated site ancillary and infrastructure works including carpark lighting
Finisklin Business Park , Finisklin , Sligo