21335
CONDITIONALKilkenny - Kilkenny County Council
Proposed Development
for construction of a livestock underpass and effluent holding tank and all associated siteworks
View the full application file on the council's planning portal →Application Timeline
Application received
26 Apr 2021
Further information requested
17 Jun 2021
Further information received
7 Dec 2021
Decision: CONDITIONAL
7 Jan 2022
Decision due
12 Jan 2022
Grant issued
9 Feb 2022
Application Details
- Location
- Courtnabooly East , Callan , Co Kilkenny
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kilkenny County Council
- Site Area
- 0.32 ha
Timeline
- Registration Date
- 26 April 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 7 January 2022
- Grant Date
- 9 February 2022
- Permission Expires
- 8 February 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for single storey kitchen extension to side of existing house and associated site works at
Coolaghmore , Callan , Co Kilkenny
to construct a bungalow, garage, entrance, wastewater treatment system with soil polishing filter, borehole, soakpits and all other associated site works
Coolaghmore , Callan , Co. Kilkenny
to construct a silage pit and a slatted cattle walkway and all associated site works at
Courtnabooly West , Callan , Co. Kilkenny
to construct a cattle underpass and all associated site works under the public road
Courtnabooly , West Callan , Co. Kilkenny
for construction of 2 no. livestock underpasses and effluent holding tanks and all associated siteworks
Courtnabooly West & , Courtnabooly East , Callan
for proposed development which will consist of a 20kV grid connection from the consented Ballytobin Solar Farm to the existing 38kV ESB substation south of Callan Co.Kilkenny. The grid connection is 3.6km long. The grid connection line will consist of c.496m of overhead line and c.3.1km of underground cable. The cable ducting will be located in the existing road verge and in the road itself with short section of c.25m on the solar farm to connect to the overhead line. The applicaiton is accompanied by a Natura Impact Statement (NIS). An appropiate period of 10 years (ie.duration of the planning permission to construct the development) is sought, with an operational life of up to 30 years after the date of commissioning
Ballytobin , Bolton , Callan
for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. The Development consists of works within the curtilage of Ballytobin House, a protected structure, reference ‘C315’ as listed on the County Kilkenny Record of Protected Structures. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Ballytobin & Ballyhall , Co. Kilkenny , Ireland
for the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR).
Ballytobin & Ballyhall , Co. Kilkenny
We, ART Generation Limited, intend to apply for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning.
Ballytobin , Co. Kilkenny , Ireland
to construct a new agricultural storage shed for the purpose of storing dry farm produce along with all associated site works
Ballaghtobin , Callan , Co Kilkenny
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?