The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

21346

N/A

Sligo - Sligo County Council

Proposed Development

Development consisting of construction of a new dwelling house, garage, waste water treatment system and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Glenavoo , Aclare , Co Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.47 ha
Floor Area
258 sq m
Residential Units
1

Timeline

Registration Date
6 September 2021
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
21404N/A7 Oct 2021

development consisting of the construction of a new dwelling house, garage, wastewater treatment system and all associated site works

Glenavoo , Aclare , Co. Sligo

163m
2342CONDITIONAL12 Apr 2023

development consisting of construction of a new dwelling house, waster water treatment system and all associated site works

Glenavoo , Aclare , Co. Sligo

285m
22236CONDITIONAL8 Jul 2022

development consisting of construction of a dwelling house and domestic garage with proprietary effluent treatment system and for all associated site works

Glenavoo , Aclare , Co. Sligo

467m
2660183CONDITIONAL14 May 2026

to decommission the existing Septic tank and percolation area on site and install a new wastewater treatment system on site consisting of an Effluent treatment unit and soil polishing filter, together with all ancillary site works and services

Gortersluin , Aclare , Co. Sligo

929m
2360139CONDITIONAL7 Jun 2023

to refurbish an existing derelict dwelling and construct a 37 sq.m extension to the West of the dwelling along with installation of a new effluent treatment system with soil percolation area and associated site works

Gortersluin , Aclare , Co. Sligo

960m
20109CONDITIONAL6 Apr 2020

development consisting of construction of a four bay enclosed slatted shed and underground slurry storage tank along with all associated site works

Gortersluin , Aclare , Co. Sligo

1.7km
2460280N/A29 Aug 2024

permission for, 1. The demolition of an existing derelict shed. 2. The construction of a car garage with storage area. 3. And all ancillary site works at this site,

Cloonbarry , Aclare , Co Sligo

1.7km
2460284N/A2 Sept 2024

1. The demolition of an existing derelict shed. 2. The construction of a car garage with storage area. 3. And all ancillary site works at this site

Cloonbarry , Aclare , Co Sligo

1.8km
18210CONDITIONAL28 May 2018

Development consisting of permission to Upgrade the existing Water Treatment Plant (WTP). This development will consist of containerised Process Units, Tank Structures, construction of a new entrance/egress onto the R294 (with existing entrance to be closed off), landscaping & site development works (including cut & fill and retaining walls) and associated ancillary works at the existing water treatment plant site at Gortersluin, Lough Talt, Co. Sligo. The development also includes for the installation of an irrigation system at a site adjacent to Lough Talt in the townland of Gortersluin, 2KM North West of the existing Water Treatment Plant. A Natura Impact Statement in respect of the application has been prepared and was submitted to the planning authority with the planning application.

Gortersluin , Lough Talt , Co Sligo

1.8km
2460396CONDITIONAL8 Nov 2024

(1) Demolish existing shed attached to dwelling house, (2) Construct new domestic garage, (3) Alter and extend existing dwelling house, (4) Upgrade wastewater treatment system, and (5) Carry out all ancillary works on site

Castlerock , Aclare , Co. Sligo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?