21350
CONDITIONALMonaghan - Monaghan County Council
Proposed Development
permission to consist of :- Grounded mounted Photovoltaic Solar Panels with a maximum square meterage of 347 m2 distributed over a grass area on-site with associated ancillary works at Monaghan Waste Water Treatment Plant
View the full application file on the council's planning portal →Application Timeline
Application received
14 Jun 2021
Decision: CONDITIONAL
5 Aug 2021
Decision due
8 Aug 2021
Grant issued
8 Sept 2021
Application Details
- Location
- Tirkeenan , Monaghan H18 RC60
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Monaghan County Council
- Site Area
- 0.27 ha
Timeline
- Registration Date
- 14 June 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 August 2021
- Grant Date
- 8 September 2021
- Permission Expires
- 7 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
permission will consist of construction of a new astro turf playing pitch with 2.40m high metal perimeter fencing and associated netting (combined height 6.40m), 4 no. 12m high columns with 2 floodlights per column, changes to front elevation of existing club house to include the removal of existing front door, to be replaced with a new curtain panel system new storage/maintenance shed with a new car parking area, connection to existing foul rising main and all associated site works
Roosky , Monaghan Town , Co. Monaghan
permission for a development which will consist of: construction of a new astro turf playing pitch with 2.40m high metal perimeter fencing and associated netting (combined height 6.40m), 4 no. 12m high columns with 2 floodlights per column, changes to front elevation of existing club house to include the removal of existing front door, to be replaced with a new curtain panel system new storage/maintenance shed with a new car parking area, connection to existing foul rising main and all associated site works
Gavin Duffy Park , Monaghan , Co. Monaghan
permission for a new daycare centre for the Alzheimer Society of Ireland, detached garage, new vehicular entrance and all associated site civil works, Significant Further Information submitted relates to, Revised Drawings, Stage 1 & 2 Road Safety Audit
Rooskey Vale , Monaghan , Co. Monaghan
development consisting of; 1. Permission for the erection of 6 no. new 18m high columns with 8 floodlights per column to existing training pitch 2. Permission to retain & complete access walking path to training pitch 3. Retention permission for as installed 4 no. 18m high columns with 8 floodlights to the juvenile playing pitch and all associated site development works
Roosky Td. , Monaghan Town , Co. Monaghan
permission for the erection of 1 No. two storey detached domestic dwelling, together with domestic garage, vehicular access, connection to site services and all associated site works
Latlorcan , Monaghan , Co. Monaghan
erect 1No. two storey detached domestic dwelling, together with domestic garage, connection to site services and all associated site works
Latlorcan , Monaghan
Permission to remove existing shared entrance and construct new separate stand alone entrance including gates, railings walls and piers
28 Latlurcan , Old Armagh Road , Monaghan
Permission to remove existing shared entrance & construct new separate standalone entrance including gates, railings, walls & piers
Latlurcan , Old Armagh Road , Monaghan
permission for alterations and extensions of the existing premises to include a single storey extension, ancillary internal refurbishments, basement level storage & all associated site works
5 Tirkeenan , Monaghan , Co. Monaghan
planning permission for the installation of 2 no. modular, portable padel tennis courts, complete with artificial grass surface, 4m high fencing around sections of the padel courts perimeter and 6m high integrated LED lighting and all other ancillary site works
The Hillgrove Hotel , Old Armagh Road , Monaghan
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?