The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

21364

CONDITIONAL

Sligo - Sligo County Council

Proposed Development

development consisting of the proposed building extension comprising of an additional 267.08m2 of manufacturing space, the demolition of an existing substation and construction of a new relocated substation with an area of 22.49m2 including all other associated site ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Sept 2021

  2. Further information requested

    2 Nov 2021

  3. Further information received

    12 Nov 2021

  4. Decision: CONDITIONAL

    6 Dec 2021

  5. Decision due

    9 Dec 2021

  6. Grant issued

    20 Jan 2022

Application Details

Location
Finisklin , Business Park , Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
17.21 ha

Timeline

Registration Date
10 September 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 December 2021
Grant Date
20 January 2022
Permission Expires
19 January 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

89m
21471CONDITIONAL2 Dec 2021

Development consisting of replacement of 2 no perimeter wall mounted flood lit signs with 2 no internally illuminated free standing podium signs on lands

Finisklin Business Park , Sligo , F91 VY44

90m
2182CONDITIONAL12 Mar 2021

development consisting of the demolition of an existing external waste water compound with an area of 43.35m2, a proposed waste compound with an area of 45.92m2, and a bicycle shelter with an area of 49.68m2, to construct a new 1-storey extension on the North elevation of the main building, consisting of gross ground floor manufacturing area of 208.00m2

Finisklin Business Park , Finisklin , Sligo

141m
2460293CONDITIONAL10 Sept 2024

development, located to the northeast of the existing facility, will consist of a new ESB substation and switch room to serve the existing facility. The substation measures 45.7m2 in plan area and 3.5m in height. The switchroom and a back up generator will be located on a raised gantry that will measure 121m2 and 7m in height and be situated 3.5m above ground level

Finisklin Business Park , , Co Sligo.

145m
21473CONDITIONAL2 Dec 2021

PP - development consisting of change of use from warehouse to offices and clean room, floor area 1,080 sq.m. in existing factory. The development will include alterations to the north elevation to provide glazing

Finisklin Business Park , Finisklin , Sligo

147m
17271CONDITIONAL17 Jul 2017

development consisting of (a) provision of new ground floor offices, meeting rooms, clean rooms, washroom facilities, laboratory and warehouse accommodation. (b) Making of alterations to existing elevations, including change of external panel design to all elevations, new glazing design to East and North elevations, addition of two additional dock levelers, loading bay doors and pedestrian entrance doors to West elevation (c) Demolition of existing internal office space which includes ground and first floor accommodation to provide new accommodation. (d) Erection of a new site boundary fence to perimeter of site. (e) Provision of additional car parking spaces to existing car parking area, together with all ancillary site works and services

Finisklin Business and Technology Park , Finisklin , Sligo

177m
22151CONDITIONAL4 May 2022

development consisting of a proposed two storey office building (gross floor area of 1774.4 m2), adjacent bike shelter (10.5 m2) and a car park comprising 224 parking spaces and all other associated site ancillary and infrastructure works including carpark lighting

Finisklin Business Park , Finisklin , Sligo

191m
21392CONDITIONAL30 Sept 2021

Development consisting of the construction of a new Waste holding facility comprising of the construction of 2No 50,000l liquid storage tanks, 390sqm of hard standing and a new internal access route including all other associated site ancillary works and landscaping

Finisklin Business Park , Sligo

194m
1932CONDITIONAL1 Feb 2019

development consisting of construction of a single storey link corridor extension to the existing Animal Health Facility.

Finisklin Business Park , Finisklin Road , Sligo

195m
21495CONDITIONAL15 Dec 2021

development consisting of an extension and alterations to existing factory to provide a warehouse and store. Floor area of proposed extensions: 466sqm. Permission is sought for associated site works at Good4U factory premises

Finisklin Business Park , Finisklin , Sligo

254m
2360155CONDITIONAL27 Jun 2023

alterations and extensions to the existing an post Sligo Delivery Service Unit building to include for a new single storey temporary structure (10m x 30m x 5.5m tall) and temporary connecting link corridor (5m x 5m. x 5.5m tall) both located to the rear (northern) elevation of the existing building. The proposed temporary building would be in place for a period of between 7 to 10 years and consists of a hard shell marquee type structure with a double skinned pvc material, fully tensioned roof and all associated site development works

An Post Sligo Delivery Service Unit , Finisklin Business Park Finisklin Sligo , County Sligo