21375

N/A

Kerry - Kerry County Council

Proposed Development

(A) DEMOLISH THE EXISTING SHED. (B) CONSTRUCT TWO DWELLING HOUSES WITH A SHARED VEHICULAR ENTRANCE THROUGH THE NEW BUILDING TO SERVE PARKING AREAS TO THE REAR OF THE DWELLINGS, INCLUDING CONNECTIONS TO THE PUBLIC SEWERAGE SYSTEM AND ALL NECESSARY SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Apr 2021

  2. Further information requested

    3 Jun 2021

  3. Further information received

    19 Nov 2021

  4. Application withdrawn

    20 Dec 2021

Application Details

Location
MAIN STREET , ANNASCAUL , CO KERRY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
0.04 ha

Timeline

Registration Date
12 April 2021
Status
WITHDRAWN
Decision
N/A
Withdrawn
20 December 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
2560017CONDITIONAL20 Jan 2025

Construct a dwelling house with parking to the rear, including connection to the existing onsite public sewerage and mains water connections and all necessary site works

Main Street , Annascaul , Co Kerry

6m
221149CONDITIONAL4 Nov 2022

(A) DEMOLISH THE EXISTING SHED, (B) CONSTRUCT A DWELLING HOUSE INCLUDING DRIVEWAY TO ACCESS PARKING AT THE REAR, CONNECTION TO THE PUBLIC SEWERAGE SYSTEM AND ALL NECESSARY SITE WORKS

MAIN STREET , ANNASCAUL , CO KERRY

26m
20198CONDITIONAL2 Mar 2020

AMENDMENTS TO THE EXISTING FRONT ELEVATION OF THEIR PREMISES, INCLUDING A NEW WINDOW LAYOUT, AN INTERNAL PORCH AND ALL ASSOCIATED SITE WORKS

TEAC SEAIN , MAIN STREET , ANNASCAUL

49m
2560641CONDITIONAL25 Jul 2025

Full planning permission to A), demolish existing single storey rear extension & outbuilding. B) construct a new single storey rear extension onto existing dwelling house, C) elevation changes & internal alterations to existing house and all associated site works.

Ardrinane , Annascaul , Co Kerry

100m
23371CONDITIONAL5 Apr 2023

(A) DEMOLISH EXISTING OUTBUILDINGS, (B) CONSTRUCT A NEW REAR TWO-STOREY EXTENSION ONTO EIXSTING DWELLING HOUSE, (C) ELEVATION CHANGES AND INTERNAL ALTERATIONS TO EXISTING HOUSE AND ALL ASSOCIATED SITE WORKS

BRACKLOON , MAIN STREET , ANNASCAUL

108m
21559CONDITIONAL27 May 2021

CONSTRUCT A MOUNUMENT REMEMBERING THE PARTICIPANTS INVOLVED IN THE BALLINACLARE AMBUSH

BALLINACLARE AMBUSH , TRALEE , CO KERRY

131m
2660082N/A6 Feb 2026

Retention Permission to Retain: (A) The decking area at the front southwestern side of the Pub. (B) The Boat Shed at the rear northwestern side of the Pub. (C) The porch on the eastern gable of the Pub. (D) The store on the northeastern rear corner of the Pub. (E) The shed in the backyard. (F) Signage in the front yard and on the western gable of the pub. (G) All associated site works. A protected Structure RPS Ref: RPS-KY-0005. NBHS Reg No: 21304406

South Pole Inn , Lower Main Street , Annascaul Co Kerry

139m
201013CONDITIONAL23 Oct 2020

ERECT AN INFORMATION SIGN INCLUDING ALL NECESSARY SITE WORKS

ARDRINANE , ANNASCAUL , CO KERRY

140m
181028CONDITIONAL24 Oct 2018

(A) RENOVATE, ALTER AND EXTEND THE EXISTING DWELLING AND (B) CONSTRUCT A FIRST FLOOR EXTENSION TO THE REAR OF THE DWELLING HOUSE INCLUDING CARRYING OUT ALL NECESSARY SITE WORKS

MAIN STREET , ANNASCAUL , CO KERRY

142m
23390CONDITIONAL12 Apr 2023

(A) RETAIN THE PROPERTY WITHIN REVISED BOUNDARIES (B) RETAIN THE ALTERATIONS AND EXTENSIONS TO THE EXISTING DWELLING HOUSE AS IT IS CONSTRUCTED INCLUDING DECORATIVE GARDEN WALLS, SECOND VEHICULAR ACCESS AND ASSOCIATED SITE WORKS, (C) RETAIN THE EXISTING SHED AS IT IS CONSTRUCTED AND (D) PERMISSION FOR DEVELOPMENT TO CONSTRUCT A DRY-STONE BOULDER WALL ALONG PART OF THE RIVERBANK INCLUDING ALL ASSOCIATED SITE WORKS

ARDRINANE , ANNASCAUL , CO KERRY

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.