The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

21384

N/A

Clare - Clare County Council

Proposed Development

for development, the development consists of the construction of a slatted unit and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Apr 2021

  2. Further information requested

    14 Jun 2021

  3. Application withdrawn

    5 Jan 2022

Application Details

Location
Ballyconry , Ballyvaughan , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
191.38 sq m
Residential Units
1

Timeline

Registration Date
21 April 2021
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
5 January 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

311m
2671CONDITIONAL18 Mar 2026

to alter and extend the existing dwelling house & all other associated site and ancillary works

Ballyconry House , Ballyvaughan , Co. Clare H91 WDP4

477m
19339UNCONDITIONAL29 Apr 2019

to Extend the Appropiate Period of Planning Permission P14-178 for an extension to existing building.

Ballyconrey Ballyvaughan Co.Clare ,

797m
2360259CONDITIONAL19 Jul 2023

for development at a site at lands at Lisnanard Townland, Ballyvaughan, Co. Clare (no Eircode available). The site measures circa 1.126 hectares and is principally bounded by the R477 road to the north; residential dwellings, agricultural buildings, and agricultural lands to the east, an un-named lane and a residential dwelling beyond to the west; and agricultural lands to the south. The site also includes a section of the R477 Regional Road that is within the Lisnanard Townland. The development will consist of: (1) The construction of a new Wastewater Treatment Plant (WwTP) comprising of: an inlet pumping station; a below ground storm tank (c.168m3); a storm overflow flow meter; an outfall manhole and emergency pumping station; a hose reel; inlet works; washwater kiosk; a sludge pumping station; a flow splitting chamber; a picket fence thickener (c.3.51m diameter); a return liquors pumping station; 2 no. settlement tanks (c.4.97m diameter); a final effluent flowmeter chamber; sample point and kiosk; a concrete hardstanding area for emergency mobile dewatering unit; a control building; a standby generator; 2 no. solar panels (c.20m [L] x 15m [w] x 3m [h]); 2 no. site parking spaces and associated ESB charge point; task lighting; internal access roads; new direct access from the R477; new signage; a paladin boundary fence (c.2.4m high), with a main access gate to the north, and landscaping maintenance access points to the south and east. (2) The installation of new sewers comprising of: a combined final effluent and storm sewer, storm overflow / return, sludge / return liquors, scum and dirty drain, foul pumping main, surface water drainage and potable watermains within the WwTP site; the installation of c.266m of new gravity sewer that will intercept the flow east of the existing septic tank and transfer these flows to the new WwTP; and c.240m of a new final effluent gravity sewer to convey the treated effluent from the new WwTP to the existing outfall. The emergency overflow pipe from the inlet pump station will connect to this sewer before leaving the WwTP. Installation of this effluent sewer will terminate at the existing manhole junction on the R477. (3) Landscaping works within the site boundary comprising of: earth embankment works; a proposed wildflower and biodiversity enhancement area; screen planting to supplement existing trees and hedgerows; removal of a section of the existing stone wall and trees / hedgerow to the north to facilita

Lands at Lisnanard Townland , Ballyvaughan , Co. Clare

985m
18660CONDITIONAL16 Aug 2018

to RETAIN existing storage shed as constructed in its new location within the site boundary previously granted planning permission in march 2017 ( File No. P16-718 )

Lisnanard , Ballyvaughan , Co. Clare

992m
19964CONDITIONAL10 Dec 2019

to renovate and extend the existing cottage to include the detached shed refurbished for domestic use, reroute connections to mains water and sewerage services and all ancillary site works

Lisnanard , Ballyvaughan , Co Clare

1.1km
18332CONDITIONAL26 Apr 2018

to 1. Refurbish and extend existing residential structure including attic conversion to provide 7 ensuite bedroom accommodation with new traditional window and shopfront treatment to front. 2. Replace existing windows to public bar and restaurant areas. 3. Construct new 2 storey structure to the rear to provide 2 new self contained one bedroom apartments, tourist / hiking facility, staff room, laundry and office accommodation and ancillary provision

Lisnanard , Ballyvaughan , Co. Clare

1.1km
18734CONDITIONAL14 Sept 2018

to construct a new house, proprietary waste treatment system and all associated site works

Drumnoan , Ballyvaughan , Co. Clare

1.2km
2660483N/A28 Jul 2026

for the Following; 1. Retention Permission to Retain works carried out for the change of use of Wellness Centre to 10 Apartments, 2. Retention Permission to retain Hotel and proposed Apartments within revised site boundaries and 3. Permission to complete the works for the 10 Apartments with associated site development works

Burren Atlantic Hotel , Ballyvaughan , Co. Clare

1.2km
2660285N/A1 May 2026

to retain works carried out for the change of use of Hostel area to 10 apartments and Permission to complete these works

Burren Atlantic Hotel , Ballyvaughan , Co. Clare

1.3km
2660240CONDITIONAL10 Apr 2026

to replace thatch roof covering to the existing cottage with a new corrugated metal finish (and slate finish to the roof of the sunroom), along with a new first floor rear bay window (extend existing bathroom), new rooflights to front roof and all other associated site works and services

No. 14 Rent an Irish Cottage , Ballyvaughan , Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?