The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

21412

CONDITIONAL

Laois - Laois County Council

Proposed Development

construct a new dwelling house, septic tank and percolation area, new entrance and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Jun 2021

  2. Further information requested

    26 Jul 2021

  3. Further information received

    6 Sept 2021

  4. Decision: CONDITIONAL

    28 Sept 2021

  5. Decision due

    3 Oct 2021

  6. Grant issued

    2 Nov 2021

Application Details

Location
Keelough Glebe , Pike of Rushall , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
0.23 ha
Floor Area
271 sq m
Residential Units
1

Timeline

Registration Date
4 June 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 September 2021
Grant Date
2 November 2021
Permission Expires
1 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

540m
20457CONDITIONAL7 Sept 2020

construct a new slatted tank at end of existing shed, including all associated works

Keelough Glebe , Pike of Rushall , Portlaoise Co. Laois

752m
17524CONDITIONAL27 Sept 2017

demolish existing dwelling house and construction of a new serviced dwelling house with associated septic tank and percolation area

Corraun , Clough , Ballacolla Co. Laois

900m
2036CONDITIONAL27 Jan 2020

construct a slatted cubicle shed including underground slurry storage and all associated ancillary facilities, works and services

Loran , Pike of Rushall , Portlaoise

989m
2560814N/A5 Dec 2025

Construct a new industrial building and associated silo, Retention of existing industrial buildings 01, 02A, 02B and 03, retaining walls, and hardstanding. Proposed surface water drainage and attenuation system And all associated site works including new and upgraded hard surfacing, boundary improvements and landscaping

Ashbrook Industrial Park , Carrowreagh Borris-in-Ossory , Co Laois

1.0km
21624REFUSED7 Sept 2021

construct a new dwelling house, domestic garage, septic tank, percolation system & all associated site works

Lowran , Pike of Rushall , Portlaoise

1.1km
2560845N/A12 Dec 2025

Construction of a new standalone warehouse Extensions to two existing industrial buildings Retention of existing building Installation of a new wastewater treatment system, pumping station and polishing filter New totem signage to north site entrance off R434 All ancillary site works necessary to complete the development. including hard surfacing, internal road works, parking, Silos, landscaping, boundary treatments and drainage works.

Ashbrook Industrial Park , Carrowreagh Borris-in-Ossory , Co Laois

1.1km
2560813N/A5 Dec 2025

Construct a new standalone warehouse, Extensions to two existing industrial buildings Retention of existing building, Installation of a new wastewater treatment system, pumping station and polishing filter, New totem signage to north site entrance off R434, All ancillary site works necessary to complete the development. including hard surfacing, internal road works, parking, Silos, landscaping, boundary treatments and drainage works.

Ashbrook Industrial Park , Carrowreagh Borris-in-Ossory , Co Laois

1.1km
20106CONDITIONAL2 Mar 2020

retain dry storage agricultural shed, new site entrance and all associated site works

Aghaboe , Ballacolla , Co. Laois

1.1km
19696N/A11 Dec 2019

retain a dry storage agricultural shed, new site entrance and all associated site works

Aghaboe , Ballacolla , Co.Laois

1.2km
2460323CONDITIONAL6 Jun 2024

Retain the conversion of an existing two storey farm outbuilding into two separate two-bedroom, two-storey living units and associated site works. The proposed works are in the curtilage of a protected structure -RPS No. 422

Aghaboe Grange , Aghaboe , Co Laois

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?