21436
CONDITIONALSligo - Sligo County Council
Proposed Development
Development consisting of demolition of part of existing dwelling house with construction of new 2 storey and single storey extension including alterations to existing dwelling and all associated site works including proprietary sewage treatment system and percolation area. A Natura Impact Statement (NIS) accompanied the Further Information Response.
View the full application file on the council's planning portal →Application Timeline
Application received
3 Nov 2021
Decision due
1 Dec 2022
Decision: CONDITIONAL
1 Dec 2022
Grant issued
13 Jan 2023
Application Details
- Location
- Union Td , Collooney , Co Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.236 ha
- Floor Area
- 147 sq m
- Residential Units
- 2
Timeline
- Registration Date
- 3 November 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 1 December 2022
- Grant Date
- 13 January 2023
- Permission Expires
- 12 January 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Sligo is 0.49 Hectares (Ha). The proposed development within the Sligo County bounds comprises both temporary and permanent works located in the townlands of Carrownacreevy, Tanrego West, Abbeytown, Corhawnagh and Carricknagat. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 1No. location. • Temporary removal of one traffic signal, three road signs, one bollard, one pole, a bridge railing, pedestrian guardrail and wall.at 1 No. location • Temporary removal of a wall, fence, poles and vegetation at 1No. location. • Construction of a permanent slip road linking the N4 and R290 at Carricknagat. • Removal of rock outcrop at Carricknagat including trees and vegetation clearance. Laying of a load bearing surface including associated drainage and reinstatement works. • Installation of temporary construction compound at Carricknagat to include site offices, welfare facilities and car parking. • Reinstatement of all temporary works areas to previous condition. • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications will be made to both Donegal and Mayo County Councils in respect of works required at locations within each county bounds. Minor, temporary works in Donegal are proposed at Killybegs, Glebe, Aghayeevoge, Cashelreagh Glebe, Bruckless, Aighan, Bruckless and Darney. Minor, temporary works in Mayo are proposed at Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. Permanent works are proposed at Crossmolina. An Appropriate Assessment Screening Report (AASR
Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat , Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat , Co. Sligo
planning permission for (1) the alterations to the existing entrance to the existing house number 1 (2) the formation of a new site entrance to the existing house number 2 (3) a new effluent treatment system and percolation area to the existing house number 1 (4) a new effluent treatment system and percolation area to the existing house number 2 (5) and all associated site works all at Carricknagat, Collooney, County Sligo,.
Carricknagat , Collooney , Co Sligo
development consisting of extension & renovation of existing dwelling house. Decommission existing septic tank and install a new on-site wastewater treatment & disposal system.
Carricknagat Td. , (Levny Barony) , Collooney
for development consisting of the extension and reconstruction of existing dwelling house, decommission existing septic tank and install a new on-site wastewater treatment & disposal system
Carricknagat Td. , (Leyny Barony) , Collooney
Development consisting of a dwelling house, septic tank and percolation area, enlarged entrance and all necessary ancillary site works
Rinn , Collooney , Co Sligo
Demolition of existing extension to side of existing dwelling, construction of new extension to side of existing dwelling, alterations to façade of existing dwelling and the installation of a new waste water treatment system including all associated site works & services
Bleachgreen Collooney Co. Sligo F91 F535 ,
Development consisting of construction of a bedroom and a wetroom at ground floor level of dwelling.
6 Boyle Road , Collooney , Co. Sligo
development consisting of the upgrading of the Collooney Wastewater Treatment Plant and will generally comprise the following: change of use of existing single-storey control building to storage building (c.16m2); construction of secondary treatment tanks with associated air blowers and pumps; erection of single-storey administration and control building (c.47.85m2); proposed utility yard area comprising associated equipment including screens, grit removers and odour control; conversion of existing aeration tank to stormwater holding tanks; conversion of existing clarifier to a sludge holding tank and all ancillary site development works including hard and soft landscaping and boundary treatments
Collooney Wastewater Treatment Plant , Union Road , Collooney
The development consists of 1) permission for construction of a vehicular access onto R290, 2) change of use from a Former Girls’ Primary School to an Active Inclusion Day Service centre and 3) conversion of the former play area into (7) parking spaces, along with all associated site works.
Lower Main Street , Collooney , Co. Sligo
Development consisting of 1. Retain boundary wall (2.54m in height) and entrance as constructed 2. Retain hard surface measuring 1140 m2 and 748 m2 for the storage of metal and end of life vehicles respectively 3. Retain existing shed and office 4. Retain and complete partially constructed precious metals shed 5. All ancillary works associated with the above. A Natura Impact Statement (NIS) accompanies this application
Collooney Co. Sligo , , Collooney
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?