The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

21483

N/A

Clare - Clare County Council

Proposed Development

to construct dwelling house, bored well, waste water treatment system, percolation area, entrance and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 May 2021

  2. Application withdrawn

    22 Nov 2021

Application Details

Location
Coolreagh Beg , Bodyke , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
75.29 sq m
Residential Units
1

Timeline

Registration Date
18 May 2021
Status
WITHDRAWN
Decision
N/A
Withdrawn
22 November 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1.2km
18798REFUSED12 Oct 2018

to construct phase one of East Clare Golf Club redevelopment scheme being: 14 no. 2 bedroom and 14 number 4 bedroom time share holiday homes together with access road, modified existing site road access, drainage works, connection to and upgrading existing sewage facility, boundary treatments, tree and scrub removal, tree planting, landscaping and ancillary works. The proposed units will be utilised as an extension of the existing East Clare Golf Village

Coolreagh , Bodyke , Co. Clare

1.3km
2460206CONDITIONAL13 May 2024

of bay window and other minor changes to the elevations of house, garage/shed for private domestic use and existing entrance and driveway as constructed and all associated site works

Coolreagh Beg , Bodyke , Co. Clare

1.5km
2460393N/A21 Aug 2024

for development which wil consist of the construction of a new residence, site entrance and access road, bored well, waste treatment system and ancillary site works

Lecarrow Upper , Feakle , Co. Clare

1.5km
2560139CONDITIONAL21 Mar 2025

to construct a dwelling house, entrance, driveway, wastewater treatment system, bored well and all associated site works

Lecarrow Upper , Feakle , Co. Clare

1.6km
19588CONDITIONAL18 Jul 2019

to construct a dwelling house, waste water treatment system with percolation area, demolish house and store, remove hay shed and non-indigenous trees and associated site works

Lecarrow Lower , Feakle , Co. Clare

1.7km
19756CONDITIONAL1 Oct 2019

to construct an extension and carry out alterations to existng dwelling house/ former Cooleen bridge school together with all ancillary site development works and services

Poulagower , Scarriff , Co Clare

1.7km
2419CONDITIONAL29 Jan 2024

to construct a new slatted house and associated site works

Derryaheila , Feakle , Co Clare

1.8km
18446CONDITIONAL31 May 2018

to RETAIN extension comprising utility and car port and associated site works

Lacarroe , Feakle , Co. Clare

1.8km
20150CONDITIONAL4 Mar 2020

to construct a six bay slatted cattle shed with creep area and cattle handling area

Coolreagh Beg , Bodyke , Co Clare

1.8km
21163CONDITIONAL25 Feb 2021

for the construction of a new dwelling house which is single storey & part two storey, with ground floor garage attached to the dwelling, externally accessed green house, proposed wastewater treatment unit with polishing filter and percolation area, new site vehicular entrance and all associated site works

Lacorroe , Feakle , Co Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?