21487

CONDITIONAL

Waterford - Waterford City and County Council

Proposed Development

roofing of existing unroofed cubicles, extension to existing cubicle house and associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 May 2021

  2. Further information requested

    20 Jul 2021

  3. Further information received

    16 Dec 2021

  4. Decision: CONDITIONAL

    20 Jan 2022

  5. Decision due

    21 Jan 2022

  6. Grant issued

    28 Feb 2022

Application Details

Location
Lagnagoushee , Ring , Dungarvan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council

Timeline

Registration Date
27 May 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 January 2022
Grant Date
28 February 2022
Permission Expires
27 February 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20495CONDITIONAL21 Jul 2020

for extension to calf house and raising of roof to existing animal house and associated works at

Lagnagoushee , Ring , Dungarvan

15m
2660282CONDITIONAL30 Apr 2026

to construct (I) Milking parlour building incorporating dairy, plant, Office, storage, Milk silo, Meal Bin, Rain Water tanks, Hardcore area, collecting yard with crush/ drafting yard, underground effluent tank with flow channel (ii) Walled silage pit (iii) Proposed loose shed (iv) Proposed new roof over existing cubicle shed with extension of cubicle shed incorporating slatted tanks and all associated site works. Demolition of roof over cubicle shed also required

Lagnagoushee , Ring , Dungarvan Co. Waterford

57m
18427CONDITIONAL22 Jun 2018

to construct a new agricultural shed, containing cubicles, underground slatted tank, and associated site works

Lagnagoushee , Ring , Dungarvan

180m
19628CONDITIONAL23 Aug 2019

installation of cattle underpasses, a soiled water tank and associated works

Lagnagoushee & Reamanagh , Ring , Dungarvan

700m
2360320N/A25 Jul 2023

iarratas a dhéanamh chuig Comhairle Cathrach & Contae Phort Láirge do chead pleanála chun tigh cónaithe aon stór, garáiste scoite, bealach isteach nua ar bhóthar poiblí, ionad cóireála camrais, ceangal chuig an príomhphíobán uisce poiblí agus cóireáil teorainn a thógáil, maraon le hoibreacha gabhála suíomh ag Log na Giumhaisí, An Rinn, Co. Phort Láirge

Log na Giumhaisí , An Rinn , Co. Phort Láirge

700m
2360341CONDITIONAL4 Aug 2023

chun tigh cónaithe aon stór, garáiste scoite, bealach isteach nua ar bhóthar poiblí, ionad cóireála camrais, ceangal chuig an príomhphíobán uisce poiblí agus cóireáil teorainn a thógáil, maraon le hoibreacha gabhála suíomh

Log na Giumhaisí , An Rinn , Co. Phort Láirge

767m
2560817N/A18 Nov 2025

a renewable energy development with a total capacity of 4.6MW at Moanbrack and Rathnameneenagh Co. Waterford. The development will consist of: • Erection of no. 2 wind turbines with a tip height of 120m. The wind turbines will have a rotor diameter of 82m and a hub height of 79m. • Upgrade of existing access tracks and construction of new permanent access tracks, permanent turbine hardstand areas and turbine foundations. • Installation of a site drainage network including sediment control systems. • Wind Farm internal cabling connecting the wind turbines to the electrical substation. • Construction of a permanent single-storey on-site 20kV substation with grid connection to the existing 20kV Ballycurreen substation, all associated electrical plant and equipment, security fencing, gates, signage, all associated underground cabling, and all ancillary structures and works. • Construction of a permanent single circuit 20kV underground cable grid connection to connect to the existing overhead line serving the existing 20kV Ballycurreen substation. • Construction of a temporary construction compound for use during construction. • Landscaping, fencing and all associated ancillary works. • Ancillary forestry felling to facilitate construction of the proposed development. This application is seeking a ten-year permission and a 35 year operational period from the date of overall commissioning of the entire wind farm. The planning application is accompanied by a Natura Impact Statement (NIS). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application and NIS may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority at Menapia Building, The Mall, Waterford during its public opening hours {9.30 a.m. to 1 p.m. and 2 p.m. to 4 p.m. Monday – Friday (excl. public holidays)}. A submission or observation in relation to the application may be made in writing to the Planning Authority on payment of the prescrib

Moanbrack and Rathnameneenagh , Ring Dungarvan , County Waterford

767m
2660191N/A26 Mar 2026

the development will consist of: • Erection of no. 2 wind turbines with a tip height of 120m. The wind turbines will have a rotor diameter of 82m and a hub height of 79m. • Upgrade of existing access tracks and construction of new permanent access tracks, permanent turbine hardstand areas and turbine foundations. • Installation of a site drainage network including sediment control systems. • Wind Farm internal cabling connecting the wind turbines to the electrical substation. • Construction of a permanent single-storey on-site 20kV substation with grid connection to the existing 20kV Ballycurreen substation, all associated electrical plant and equipment, security fencing, gates, signage, all associated underground cabling, and all ancillary structures and works. • Construction of a permanent single circuit 20kV underground cable grid connection to connect to the existing overhead line serving the existing 20kV Ballycurreen substation. • Construction of a temporary construction compound for use during construction. • Landscaping, fencing and all associated ancillary works. • Ancillary forestry felling to facilitate construction of the proposed development. This application is seeking a ten-year permission and a 35 year operational period from the date of overall commissioning of the entire wind farm. The planning application is accompanied by a Natura Impact Statement (NIS). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Moanbrack and Rathnameneenagh , Ring Dungarvan , County Waterford

767m
2560760N/A25 Oct 2025

a renewable energy project with a total capacity of 4.6MW This development will consist of:A) Erection of no. 2 wind turbines with a tip height of 120m. The wind turbines will have a rotor diameter of 82m and a hub height of 79m B)Upgrade of existing access tracks and construction of new permanent access tracks, permanent turbine hardstand areas and turbine foundations C) Installation of a site drainage network including sediment control systems D)Wind Farm internal cabling connecting the wind turbines to the electrical substation E)Construction of a permanent single-storey on-site 20kV substation with grid connection to the existing 20kV Ballycurreen substation, all associated electrical plant and equipment, security fencing, gates, signage, all associated underground cabling, and all ancillary structures and works.F)Construction of a permanent single circuit 20kV underground cable grid connection to connect to the existing overhead line serving the existing 20kV Ballycurreen substation.G)Construction of a temporary construction compound for use during construction.H)Landscaping, fencing and all associated ancillary works. This application is seeking a ten-year permission and a 35 year operational period from the date of overall commissioning of the entire wind farm. The planning application is accompanied by a Natura Impact Statement (NIS). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Moanbrack and Rathnameneenagh , Ring Dungarvan , County Waterford

814m
20478CONDITIONAL15 Jul 2020

the construction of a house, a waste water treatment system, a garage and an entrance along with all associated site works

Moanbrack , Ring , Dungarvan

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?