2150678
N/ADonegal - Donegal County Council
Proposed Development
ERECTION OF A DWELLING WITH CONNECTION TO SEPTIC TANK AND PERCOLATION AREA ALONG WITH ALL ASSOCIATED WORKS
View the full application file on the council's planning portal →Application Details
- Location
- TURE , MUFF , CO DONEGAL
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.77 ha
- Floor Area
- 184 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 15 April 2021
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ERECTION OF A DWELLING WITH CONNECTION TO SEPTIC TANK AND PERCOLATION AREA ALONG WITH ALL ASSOCIATED WORKS
TURE , MUFF , CO DONEGAL
CONSTRUCTION OF A DWELLING HOUSE AND DETACHED GARAGE AND INSTALLATION OF WASTEWATER TREATMENT PLANT
BALLYBOE , TURE , MUFF LIFFORD PO
ERECTION OF A DWELLING HOUSE AND WASTEWATER TREATMENT PLANT TOGETHER WITH ON SITE PERCOLATION AREA AND CONNECTION TO ALL PUBLIC SERVICES
TURE , MUFF , LIFFORD PO
ERECTION OF A DWELLING HOUSE AND WASTEWATER TREATMENT PLANT TOGETHER WITH ON SITE PERCOLATION AREA AND CONNECTION TO ALL PUBLIC SERVICES
DRUMSKELLAN , TURE , MUFF
CONSTRUCTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT PLANT AND CONNECTION TO ALL PUBLIC SERVICES
DRUMSKELLAN , TURE , MUFF LIFFORD PO
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT PLANT
TURE , MUFF , LIFFORD PO
CONSTRUCTION OF A CONSERVATORY TO THE SIDE OF EXISTING DWELLING INCLUDING LOWER GROUND FLOOR ACCESS UNDERBUILDING AND ASSOCIATED SITE WORKS
TURE , QUIGLEY'S POINT , CO DONEGAL
CONSTRUCTION OF A DWELLING, WASTE WATER TREATMENT SYSTEM, CONNECTION TO PUBLIC WATER SUPPLY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS (OUTLINE PERMISSION REF. NO. 16/51380 REFERS)
GORTIN , TURE , MUFF
CONSTRUCTION OF A DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
GORTIN , TURE , MUFF
CONSTRUCTION OF A DWELLING, GARAGE, WASTE WATER TREATMENT SYSTEM, CONNECTION TO PUBLIC WATER SUPPLY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
GORTIN , TURE , MUFF
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?