The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2151943

N/A

Donegal - Donegal County Council

Proposed Development

AN GAILEARAÍ DIXON A LEAGAINT AGUS GAILEARAÍ ÚR A THÓGÁIL LE ÁIT CÓNAITHE EALANTÓIR AR AN CHÉAD URLÁR

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Sept 2021

  2. Further information requested

    18 Nov 2021

  3. Application withdrawn

    24 Feb 2022

Application Details

Location
OILEAN THORAÍ , NA DOIRÍ BEAGA , LEITIR CEANAINN
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.038 ha

Timeline

Registration Date
29 September 2021
Status
WITHDRAWN
Decision
N/A
Withdrawn
24 February 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

11m
2250446CONDITIONAL15 Mar 2022

GAILEARAÍ DIXON A LEAGAINT AGUS GAILEARAÍ ÚR A THÓGÁIL LE ÁIT CÓNAITHE EALANTÓIR AR AN CHÉAD URLÁR AGUS CORÁS EISILTEACH SEARACHAIS LE SCAGAIRE SNASAIREACHT A THÓGAIL. TÁ RÁITEAS TIONCHAR NATURA ISTIGH LEIS AN T-IARRATAS SEO

OILEAN THORAÍ , NA DOIRÍ BEAGA , LEITIR CEANAINN

83m
2151145CONDITIONAL9 Jun 2021

DHA SHEOMRA RANGA, LETHRISI AGUS FORHALL A THOGAIL MAR MEADU AR CHUN NA SCOILE, TA ATHRAITHE MOLTA AR NMA SEOMRA ATA ANN CHEANNA, FOSTA BEIDH CORAS UR SEARCHAIS LE TOGAIL AR THALAMH NA SCOILE. TA RAITEAS TIONCHARA NATURA LEIS AN T-IARRATAS

OILEAN THORAI , NA DOIRI BEAGA

137m
2051415N/A29 Sept 2020

SCIOBAL NA BHFEAR A BHUNÚ ARE AN SUIOMH SEO I MBAILE FEARAINN

TORAÍ , AN BUN BEAG , CO DHUN NA NGALL

139m
2051479CONDITIONAL8 Oct 2020

SCIOBAL NA BHFEAR A BHUNÚ AR AN SUIOMH SEO I MBAILE FEARAINN

TORAÍ , AN BUN BEAG , CO DHUN NA NGALL

169m
2151572CONDITIONAL6 Aug 2021

SCIOBAL NA BHFEAR A BHUNÚ A AOI UIMHIR TAG 20/51479 A ATHRÚ GO IONAD NUALAÍOCHTA /SCIOBÓL NA BHFRAR AR AN SUIOMH SEO I MBAILE FEARAINN

TORAÍ , AN BUN BEAG , CO DHUN NA NGALL

185m
1751434N/A19 Sept 2017

IONAD ATHCHÚRSÁLA

OILEÁN THORAIGH , CO. DHÚN NA NGALL

186m
1851424CONDITIONAL18 Sept 2018

IONAD ATHCHÚRSÁLA A THÓGÁIL

OILEÁN THORAÍ , CO. DHÚN NA NGALL

189m
2461415CONDITIONAL12 Sept 2024

INSTALLATION OF ELECTRONIC COMMUNICATIONS INFRASTRUCTURE COMPRISING OF A 12M HIGH LATTICE STRUCTURE SUPPORTING 4 NO. DISHES, TOGETHER WITH EQUIPMENT CABINET, PALISADE FENCE AND GATE, FIBRE DUCTING AND CHAMBERS, FOUNDATION AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED

BAILE UR OILEÁN , THORAÍ , DÓIRÍ BEAGA TORAIGH

189m
2461377N/A6 Sept 2024

INSTALLATION OF A 12M HIGH LATTICE STRUCTURE SUPPORTING 4 NO. DISHES, TOGETHER WITH EQUIPMENT CABINET, PALISADE FENCE & GATE, FIBRE DUCTING & CHAMBERS, FOUNDATION AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED

BAILE UR OILEÁN THORAÍ , DOIRÍ BEAGA , TORAIGH

406m
2561083CONDITIONAL26 Jun 2025

(1) REFURBISHMENT AND CONSTRUCTION OF EXTENSION TO EXISTING SEMI-DETACHED HOUSE TO INCLUDE A SINGLE STOREY EXTENSION TO THE FRONT OF THE HOUSE AND A SINGLE STOREY EXTENSION TO THE REAR OF THE HOUSE, (2) ADJUSTMENT OF EXISTING WINDOW OPENINGS, (3) INSTALLATION OF NEW WINDOWS AND NEW ROOF WITH ROOF WINDOWS, (4) EXTERNAL INSULATION WRAP TO EXISTING WALLS, (4) INSTALLATION OF AN AIR-SOURCED HEAT PUMP AND (5) INTERNAL ALTERATIONS

SEA VIEW , WEST END , TORY ISLAND

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?