2152108
N/ADonegal - Donegal County Council
Proposed Development
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
26 Oct 2021
Application withdrawn
6 Dec 2022
Application Details
- Location
- MEENCRUMLIN , BALLYBOFEY , LIFFORD PO
- Applicant
- N/A
- Application Type
- OUTLINE PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.57 ha
- Floor Area
- 1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 26 October 2021
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 6 December 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(1) REMOVAL AND DECOMMISSIONING OF EXISTING CHEMIFLOC TANKS AND SODA ASH SILOS AND BUNDED AREA (FOOTPRINT OF APPROXIMATELY > 35M2), (2) REPLACEMENT OF THE DECOMMISSIONED CHEMIFLOC TANK INSTALLED IN AN OPEN CONCRETE BUND WITH 2 NO. 25000L COAGULANT TANKS, (3) CONSTRUCTION OF NEW WTP CHEMICAL STORAGE, PREPARATION AND DOSING BUILDING TO CONTAIN: 42 TN SILO; 2000L BATCHING TANK; 10000L PRODUCT TANK; DOSING CABINETS; AND NEW MOTOR CONTROL CENTRE (MCC) AND CONTROL PANELS FOR BOTH DOSING SYSTEMS. THE BUILDING AREA WILL BE OF APPROXIMATELY 185M2, (4) REROUTING / RECONFIGURATION OF FILTER WASH WATER OUTLETS AND HEAVY SLUDGE BLEEDS TO REDIRECT HEAVY SLUDGE BLEEDS DIRECTLY TO THE SLUDGE PLANT PREVENTING THE HIGH VOLUMES OF HEAVY SLUDGE ENTERING THE SLUDGE LAGOONS REDUCING THE NEED FOR SLUDGE PUMPING, (5) UNDERGROUND PIPEWORK AND DUCTING AND (6) ALL ASSOCIATED CIVIL, LANDSCAPING AND ANCILLARY SITE DEVELOPMENT WORKS
LOUGH MOURNE WTP , MEENCRUMLIN , LIFFORD PO
(1) REMOVAL AND DECOMMISSIONING OF EXISTING CHEMIFLOC TANKS AND SODA ASH SILOS AND BUNDED AREA (FOOTPRINT OF APPROXIMATELY > 35M2), (2) REPLACEMENT OF THE DECOMMISSIONED CHEMIFLOC TANK INSTALLED IN AN OPEN CONCRETE BUND WITH 2 NO. 25000L COAGULANT TANKS, (3) CONSTRUCTION OF NEW WTP CHEMICAL STORAGE, PREPARATION AND DOSING BUILDING TO CONTAIN: 42 TN SILO; 2000L BATCHING TANK; 10000L PRODUCT TANK; DOSING CABINETS; AND NEW MOTOR CONTROL CENTRE (MCC) AND CONTROL PANELS FOR BOTH DOSING SYSTEMS. THE BUILDING AREA WILL BE OF APPROXIMATELY 185M2, (4) REROUTING / RECONFIGURATION OF FILTER WASH WATER OUTLETS AND HEAVY SLUDGE BLEEDS TO REDIRECT HEAVY SLUDGE BLEEDS DIRECTLY TO THE SLUDGE PLANT PREVENTING THE HIGH VOLUMES OF HEAVY SLUDGE ENTERING THE SLUDGE LAGOONS REDUCING THE NEED FOR SLUDGE PUMPING, (5) UNDERGROUND PIPEWORK AND DUCTING AND (6) ALL ASSOCIATED CIVIL, LANDSCAPING AND ANCILLARY SITE DEVELOPMENT WORKS
LOUGH MOURNE WATER TREATMENT PLANT , MEENCRUMLIN , LIFFORD PO
EXISTING DWELLING HOUSE ON SITE AND PERMISSION FOR (1) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF A REPLACEMENT SEWAGE TREATMENT SYSTEM AND ASSOCIATED DRAINAGE AND (2) CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING DWELLING HOUSE, ALL ELEVATIONAL AMENDMENTS AND ASSOCIATED SITE DEVELOPMENT WORKS
MEENCRUMLIN , BALLYBOFEY , CO DONEGAL
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
MEENCARGAGH , BALLYBOFEY , LIFFORD PO
ERECTION OF AN AGRICULTURAL SLATTED SHED WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
GLENLEARY , RAMELTON , CO. DONEGAL
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?