21536
CONDITIONALOffaly - Offaly County Council
Proposed Development
THE INSTALLATION OF A ROOF TOP SOLAR PHOTOVOLTAIC ARRAY (2476 SQ.M) AND ASSOCIATED ELECTRICAL INFRASTRUCTURE ON EXISTING MANUFACTURING FACILITY
View the full application file on the council's planning portal →Application Timeline
Application received
30 Aug 2021
Decision: CONDITIONAL
21 Oct 2021
Decision due
24 Oct 2021
Grant issued
26 Nov 2021
Application Details
- Location
- J GRENAN & SONS TINNACROSS RATH BIRR , CO. OFFALY , R42YA49
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
- Site Area
- 8.117 ha
Timeline
- Registration Date
- 30 August 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 October 2021
- Grant Date
- 26 November 2021
- Permission Expires
- 25 November 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1) EXISTING SITE WORKS COMPRISING OF, A NEW VEHICULAR ENTRANCE OFF THE L003 PUBLIC ROAD, A NEW STAFF CAR-PARKING AREA, A NEW LORRY PARKING AREA AND ASSOCIATED SITE ROADWAYS IN SO FAR AS THEY ARE COMPLETE. PERMISSION IS ALSO SOUGHT TO COMPLETE SAME. 2) PERMISSION IS SOUGHT TO CONSTRUCT A NEW WEIGHBRIDGE. 3) PERMISSION FOR EXTENSIONS TO THE NORTH-WEST AND NORTH-EAST OF EXISTING BUILDINGS TO COMPRISE GRAIN INTAKE BUILDINGS AND TRUCK LOADING AND PALLET STORAGE BUILDING
J GRENNANS & SONS , TINNACROSS RATH , BIRR CO OFFALY
ALTERATIONS TO EXISTING OFFICE/RETAIL BUILDING AT GROUND & FIRST FLOOR LEVEL AND ALTERATIONS TO EXISTING ELEVATIONS, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
TINNACROSS , RATH , BIRR CO. OFFALY
ALTERATIONS TO EXISTING OFFICE/RETAIL BUILDING AT GROUND & FIRST FLOOR LEVEL AND ALTERATIONS TO EXISTING ELEVATIONS, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
J GRENNAN & SONS TINNACROSS , RATH , BIRR CO. OFFALY
CONSTRUCTION OF A TWO STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING, INTERNAL ALTERATIONS TO ROOMS AT GROUND & FIRST FLOOR LEVEL, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
TINNACROSS , RATH , BIRR CO OFFALY
(A) EXISTING EXTENSION TO THE SOUTH OF THE EXISTING SCHOOL BUILDING THAT INCLUDES A STAFF ROOM, NEW OFFICE, RESOURCE ROOM AND ALTERATIONS TO THE EXISTING ADJOINING ROOMS AND (B) PERMISSION FOR CONSTRUCTION OF A NEW SINGLE STOREY CLASSROOM EXTENSION TO THE NORTH OF THE EXISTING SCHOOL BUILDING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING ALTERATIONS AND FUTURE UPGRADING OF EXISTING FOUL DRAINAGE SYSTEM
SCOIL NÁISIÚNTA NAOMH EOIN , THOMASTOWN , RATH BIRR CO. OFFALY
CONSTRUCTION OF A SINGLE STOREY DWELLING, SINGLE STOREY DOMESTIC GARAGE, BORED WELL, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
RAHEENGLASS , RATH , BIRR CO. OFFALY
A 10 YEAR PERMISSION. THE DEVELOPMENT WILL CONSIST OF SOLAR PV DEVELOPMENT ON TWO SEPARATE AND DETACHED PARCELS OF LAND, PARCEL 1 IS LOCATED IN THE TOWNLAND OF CLONBEALE BEG GLEBE, RATHURE NORTH, WHILE PARCEL 2 IS LOCATED IN THE TOWNLAND OF PARKMORE. BOTH SEPARATE PARCELS WILL BE CONNECTED TO AN EXISTING PERMITTED SOLAR DEVELOPMENT UNDER PLANNING APPLICATION REF: PR20/476 BY UNDERGROUND CABLES (WILL BE SUBJECT TO A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT CONSENT APPLICATION). EACH DETACHED PARCEL CONTAINING PV PANELS WILL BE LAID OUT IN ARRAYS OVER A TOTAL DEVELOPMENT AREA OF CA. 69HA, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 24 NO. POWER HUBS (CA. 15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 2 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 2 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 2 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 12 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING AND ALL ANCILLARY WORKS. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
CLONBEALE BEG GLEBE RATHURE NORTH (PARCEL 1) AND , PARKMORE (PARCEL 2) , CO. OFFALY
A 10 YEAR PERMISSION. THE DEVELOPMENT WILL CONSIST OF SOLAR PV DEVELOPMENT ON TWO SEPARATE AND DETACHED PARCELS OF LAND, PARCEL 1 IS LOCATED IN THE TOWNLAND OF CLONBEALE BEG GLEBE, RATHURE NORTH, WHILE PARCEL 2 IS LOCATED IN THE TOWNLAND OF PARKMORE. BOTH SEPARATE PARCELS WILL BE CONNECTED TO AN EXISTING PERMITTED SOLAR DEVELOPMENT UNDER PLANNING APPLICATION REF: PL20/476 BY UNDERGROUND CABLES (WILL BE SUBJECT TO A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT CONSENT APPLICATION). EACH DETACHED PARCEL CONTAINING PV PANELS WILL BE LAID OUT IN ARRAYS OVER A TOTAL DEVELOPMENT AREA OF CA. 69HA, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 24 NO. POWER HUBS (CA. 15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 2 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 2 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 2 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 12 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING AND ALL ANCILLARY WORKS. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
CLONBEALE BEG GLEBE RATHURE NORTH (PARCEL 1) AND PARKMORE (PARCEL 2) , CO. OFFALY
the construction of a new single-storey fitness building and all associated site works to complete the development
Thomastown Demense , Rath , Birr
DEMOLITION OF EXISTING DWELLING HOUSE AND FUEL SHED, AND THE CONSTRUCTION OF A REPLACEMENT DWELLING COMPRISING A PART TWO-STOREY HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, SITE ENTRANCE AND ALL ANCILLARY SITE WORKS THERETO.
MULLANAFAWNIA , FIVEALLEY , BIRR CO. OFFALY
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?