The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

21557

N/A

Clare - Clare County Council

Proposed Development

to replace window on ground floor office (rear) with a double door also make change of use and convert 1st and 2nd floor office accommodation to a self contained apartment

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Jun 2021

  2. Further information requested

    20 Jul 2021

  3. Application withdrawn

    2 Mar 2022

Application Details

Location
No 11 Carmody Street Business Park , Carmody Street , Ennis Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
2 June 2021
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
2 March 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

24m
2360103CONDITIONAL9 Apr 2023

for the construction of a first floor extension over an existing single storey extension to the rear of an existing dwelling, modifications to the elevations of the existing extension and dwelling and all ancillary site works

1 Ahern Terrace , Carmody Street , Ennis Co Clare

26m
181009CONDITIONAL7 Dec 2018

to convert office on 1st Floor and make change of use to living accommodation.

4 Carmody Street. Business Park , Carmody Street , Ennis

26m
2489CONDITIONAL20 Mar 2024

for change of use and convert 2nd floor office to a self-contained apartment

No. 4 Carmody Street Business Park , Carmody Street , Ennis Co. Clare

26m
21559N/A2 Jun 2021

to make change of use and convert 2nd floor office to a self contained apartment

No 4 Carmody Street Business Park , Carmody Street , Ennis Co Clare

48m
26184CONDITIONAL1 Jul 2026

of extension to private garage

No 6 Ahernes Terrace , Carmody St , Ennis Co. Clare

71m
18254CONDITIONAL29 Mar 2018

to demolish fire damaged former furniture store building and to secure site with hoarding

Market Place , Ennis , Co. Clare

77m
2460175CONDITIONAL25 Apr 2024

for the development which will consist of: (a) to demolish fire damaged former furniture store and ancillary buildings along with the demolition of an existing 2 storey commercial/retail building adjoining same. (b) The construction of a new 2 and part 3 storey building compromising the following accommodation: Ground floor, commercial (retail, and office) area (252m2), along with accommodation entrance lobby to access floors above. First floor, 3 no., 2 Bed-apartments. Second Floor, 2 no., 2-Bed apartments. Development to total 790m2 in floor area and include all associated signage & shop fronts, site works and ancillary works along with connection to existing public sewer and utilities

Junction of Market Place and Garraunakilla Lane , Ennis , Co. Clare

79m
1995CONDITIONAL12 Feb 2019

to (1) demolish existing rear single storey extension; (2) construct a rear 2 storey extension; (3) make structural changes to front elevation

3 Garraunakilla , Market Place , Ennis

79m
24186REFUSED10 Jun 2024

to Extend the Appropriate Period of Planning Permission for P19/95 to (1) demolish existing rear single storey extension; (2) construct a rear 2 storey extension; (3) make structural changes to front elevation

3 Garraunakilla , Market Place , Ennis Co Clare

85m
22817CONDITIONAL14 Sept 2022

for the following works at the site of the former Ennis Boys NS, Ennis, Co Clare: The development will consist of the provision of a new temporary surface car parking for a period of 5 years containing 156 car parking spaces, 12 accessible bays and 4 Electric Vehicle parking bays; minor alterations to the exiting vehicular entrances to and from the Kilrush road; provision of signage; to provide pedestrian access and internal footpaths; perimeter fencing surrounding the surface car park together with all associated site and ancillary works

Kilrush Road , Ennis , Co Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?