The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

21621

CONDITIONAL

Cavan - Cavan County Council

Proposed Development

to (1) construct detached dwelling (2) construct detached domestic garage (3) incorporate new wastewater treatment system and percolation area

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Oct 2021

  2. Decision: CONDITIONAL

    29 Nov 2021

  3. Decision due

    7 Dec 2021

  4. Grant issued

    20 Jan 2022

Application Details

Location
Bunnoe , Lisboduff , Cootehill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.35 ha
Floor Area
255 sq m
Residential Units
1

Timeline

Registration Date
13 October 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 November 2021
Grant Date
20 January 2022
Permission Expires
19 January 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

417m
2516CONDITIONAL24 Mar 2025

to 1. Construct extension to existing dwelling. 2. Carry out alterations and remodelling of existing dwelling. 3. Carry out associated site works to enable completion of project

Lisboduff , Cootehill , Co Cavan

655m
22159CONDITIONAL21 Apr 2022

to construct a new dormer style dwelling house with detached domestic garage, form new vehicular site entrance onto public roadway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works

Cortrasna or Edergole , Lisboduff Cootehill , Co. Cavan

739m
18120CONDITIONAL20 Mar 2018

to erect roofed canopy over existing outdoor play area at the Community Preschool and carry out associated site works

Lisboduff , Cootehill , Co. Cavan

739m
20449CONDITIONAL12 Oct 2020

to erect roofed canopy over existing outdoor play area at the Community Preschool and carry out associated site works

Lisboduff , Cootehill , Co. Cavan

1.1km
2360308N/A13 Dec 2023

to demolish existing sheds and erect fully serviced storage unit with connection to existing services, relocate existing fuel pumps and tanks, extend existing yard area, alterations to site boundaries and all associated and ancillary development works

Pottle East , Cootehill , Co.Cavan

1.1km
2460021CONDITIONAL24 Jan 2024

to demolish existing sheds and erect fully serviced storage unit with connection to existing services, relocate existing fuel pumps and tanks, extend existing yard area, alterations to site boundaries and all associated and ancillary development works. Significant Further Info has been received - NIS.

Pottle East , Cootehill , Co.Cavan

1.2km
21241CONDITIONAL27 Apr 2021

to construct a new dormer style dwelling house, form new vehicular site entrance onto existing laneway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works

Ballyhally , Lisboduff , Co Cavan

1.2km
19392CONDITIONAL14 Oct 2019

EXTENSION OF TIME 15/297 to a) retain alterations to development previously approved under planning reference 07/985 (to include revisions to the location and dimensions of the previously approved developments) and, b) to construct an extension to 1 no. existing pig house, together with all ancillary structures and all associated site works arising from the above development

Ballyhally , Lisboduff , Cootehill

1.2km
21326CONDITIONAL2 Jun 2021

to erect fully serviced two storey dwelling with detached domestic garage & offices, entrance, sewerage treatment facilities & all ancillary works. Significant further information and revised plans have been submitted.

Lisboduff , Cootehill , Co. Cavan

1.3km
2412CONDITIONAL12 Feb 2024

to construct agricultural building to house animals and carry out associated site works at corraweelis Lisboduff Cootehill Co Cavan

Corraweelis , Lisboduff , Cootehill Co Cavan

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?