The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

21640

CONDITIONAL

Cavan - Cavan County Council

Proposed Development

erect fully serviced part single storey part two storey dwelling with detached domestic garage, entrance, sewerage treatment facilities and all ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Oct 2021

  2. Further information requested

    14 Dec 2021

  3. Further information received

    13 Jan 2022

  4. Decision: CONDITIONAL

    4 Feb 2022

  5. Decision due

    9 Feb 2022

  6. Grant issued

    23 Mar 2022

Application Details

Location
Drumleague , Tullyvin , Cootehill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Floor Area
292 sq m
Residential Units
1

Timeline

Registration Date
20 October 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
4 February 2022
Grant Date
23 March 2022
Permission Expires
22 March 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

64m
17498CONDITIONAL29 Nov 2017

to construct a slatted shed with underground slurry storage tanks and all ancillary site works

Drumleague , Tullyvin , Cootehill

924m
18540REFUSED19 Dec 2018

to demolish existing hay shed building and erect fully serviced 2 storey dwelling with entrance, sewerage treatment facilities and all ancillary works

Drumerkillew , Kill Cootehill , Co. Cavan

1.1km
2560556CONDITIONAL12 Sept 2025

to construct a single storey dwelling house, domestic garage, form new entrance, install proprietary mechanical wastewater treatment system and all associated site works

Corgreagh , Kill , Cootehill Co. Cavan

1.1km
17328CONDITIONAL25 Jul 2017

to construct a single poultry unit together with underground washings tank, vertical meal bin, and all ancillary site works within the existing farmyard complex. The proposed development comprises or is for the purpose of an activity for which an Integrated Pollution Prevention Control Licence is required. The planning application is to be accompanied by an Environmental Impact Statement

Drumsilla , Tullyvin , Cootehill

1.1km
20174CONDITIONAL15 May 2020

to construct a storage shed (69m2) incorporating a biomass boiler and woodchip store and to install roof mounted Solar Photovoltaic Panels (66m2) and all Ancillary Site Works within existing farmyard complex

Drumsillagh Tullyvin , Cootehill , Co. Cavan

1.3km
20522CONDITIONAL25 Nov 2020

to construct new extension and carry out renovation works to existing dwelling, alterations to elevations, new bellmouth entrance and piers, boundary treatments and all ancillary works

Cornabraher , Tullyvin , Co. Cavan

1.3km
2028CONDITIONAL30 Jan 2020

for construction of multi-operator telecommunications infrastructure comprised of: a 20m lattice tower, antennas, dishes and associated ground-level equipment, cabinets, fencing and landscaping

Aghatotan , Tullyvin , Cootehill

1.3km
2070CONDITIONAL4 Mar 2020

EXTENSION OF DURATION of Planning Reg. No. 15/201; to erect fully serviced two-storey dwelling with detached domestic garage, entrance, sewerage treatment facilities and all ancillary works

Cornabraher , Tullyvin , Co. Cavan

1.4km
2360293CONDITIONAL4 Dec 2023

to consist of a single storey dwelling house, domestic garage, wastewater treatment system and soil polishing filter, vehicular entrance, entrance walls and piers, together with all ancillary site development works Significant Further Information has been received.

Corgreagh , Kill. Cootehill , Co. Cavan

1.4km
2460237CONDITIONAL29 May 2024

for 1) Retain change of use from existing dwelling to after school childcare facility, external play area and fencing, 2) Planning permission sought for roof structure above external play area and alterations to site layout to include new path access to existing carpark and all ancillary works

Drumhurt , Kill , Cootehill

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?