21697
CONDITIONALClare - Clare County Council
Proposed Development
To construct a single dwelling house, advanced water treatment system and ancillary site works.
View the full application file on the council's planning portal →Application Timeline
Application received
2 Jul 2021
Further information requested
25 Aug 2021
Further information received
8 Dec 2021
Decision due
13 Jan 2022
Decision: CONDITIONAL
13 Jan 2022
Grant issued
16 Feb 2022
Application Details
- Location
- Culleen , Newmarket-on-fergus , Co. Clare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
- Floor Area
- 197 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 2 July 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 January 2022
- Grant Date
- 16 February 2022
- Permission Expires
- 15 February 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to renovate and extend existing dwelling house, connect to new wastewater treatment system and carry out all ancillary site works
Cullen , Newmarket-on-Fergus , Co Clare
for the construction of an entrance, dwelling house, garage, driveway, advanced waste water treatment system together with all ancillary site development works and services
Culleen , Newmarket on Fergus , Co. Clare
for development - the development consists of the construction of an new entrance onto public road, the construction of a road from that entrance of a road from that entrance using inert soil and stone class (170504) and using concrete class (170101) into farmyard and associated site works
Culleen , Drumline , Co Clare
for development which will consist of 1. Land reclamation for agricultural purposes by levelling ground between two contours using imported inert soil and stone class (170504) concrete class (170101) for roadways, together with the associated site works. 2 RETENTION permission of land reclamation of existing lands for agricultural use under planning references 20/712 and 21/347
Ballycasey Beg , Culleen , Newmarket-on-Fergus Co. Clare
the development consists of the construction of a slatted unit and associated site works
Culleen , Drumline , Co Clare
for an extension to dwelling house and carrying out of ancillary works
Killulla Stud , Killulla , Newmarket-on-Fergus Co Clare
for the construction of a detached single storey garage with single storey granny flat appended, connection to existing wastewater treatment system and percolation area, and all ancillary site and landscaping works
The Orchard , Drumline , Newmarket-on-Fergus Co Clare
for the development this site at the townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare. Planning Permission is sought for a duration of 10 years, with an operational life of 35 years from the date of commissioning. The proposed development comprises the construction and operation of a solar photovoltaic (PV) farm on a site of approximately 95 hectares. The project includes: (i) Ground-mounted solar arrays supported by steel frames, with an internal network cable facilitating connection to the Drumline 110kV substation. An internal network cable will be installed to enable an under-the-fence connection from the onsite transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18-metre-high lightning monopole mast. (ii) Underground electrical cabling and ducting, security fencing, CCTV stands. (iii) New internal access tracks and site entrance. (iv) Site drainage. (v) All ancillary site development works and apparatus. A Natura Impact Statement will also be submitted to the Planning Authority with this application
Mogullaan Crossagh , Rathlaheen South Culleen , Drumline and Ballycasey Beg Co. Clare
for the development at this site at the townlands of Ballycar, lislea, Kilulla, Mogullaan and Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare The development will consist of an application for a 10-year development phase followed by a 40-year operational lifespan for a solar farm on a site encompassing approximately 109 hectares. The proposed development includes the installation of ground-mounted solar photovoltaic (PV) panels on steel frames accross the site. The project will incorporate 256 inverters arranged in a series string configuration, supported by 24 electrical skid hardstands that will house transformer units and a ring main unit facility. The development also entails the construction of a transformer compound to facilitate a connection to the existing 110kV Drumline Substation. An internal network cable will be installed to enable an under-the-fence connection from the on-site transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18 metre-high lightning monopole mast. Approximately 8.6 Kilometres of new and upgraded internal access tracks will be developed to provide connectivity within the site. Six new site entrances are proposed, including modification to existing junctions to accommodate construction access and the delivery of abnormal loads. These access points will connnect to Local Roads (L3166, Ballycar Road L3174 and L3136) and the Regional Road R458. All new entrances will link directly to the public road network. This application seeks approval for all associated site development and ancillary works necessary to support the successful delivery and operation of the proposed solar farm. A Natura Impact Statement will also be submitted to the Planning Authority with this application
Ballycar Lislea Killulla , Mogullaan & Crossagh Rathlaheen South , Culleen Drumline & Ballycasey Beg Co Clare
to erect signage to logistics (warehouse and distribution) building
Shannon Free Zone , Ballycasey Beg , Smithstown Shannon
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?