21732
CONDITIONALOffaly - Offaly County Council
Proposed Development
INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
29 Nov 2021
Further information requested
31 Jan 2022
Further information received
8 Apr 2022
Decision due
5 May 2022
Decision: CONDITIONAL
5 May 2022
Grant issued
10 Jun 2022
Application Details
- Location
- WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
- Site Area
- 0.124 ha
- Floor Area
- 1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 29 November 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 May 2022
- Grant Date
- 10 June 2022
- Permission Expires
- 9 June 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY
INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS
WOODFIELD OR TULLYNISK , BIRR , CO OFFALY
A ten year Planning Permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii) Reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) All associated site development works, ancillary works and apparatus considered necessary to facilitate the proposed development. The development subject of this application will facilitate the connection of the proposed 7 no. wind turbine Carrig Renewables Wind Farm to the national electricity grid. A concurrent application for the Carrig Renewables Wind Farm development has been lodged to Tipperary County Council. The proposed development includes underground cabling works located within the public road corridor within the curtilage of a Protected Structure (Tipperary RPS Ref. TRPS519 Croghan Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted to the planning authority with the application
In the townlands of Townparks (Birr) Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly
a ten-year planning permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii)reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) all associated site development works, ancillary works and apparatus considered necessary to facilitate the proposed development. The development subject of this application will facilitate the connection of the proposed 7 no. wind turbine Carrig Renewables Wind Farm to the national electricity grid. A concurrent application for the Carrig Renewables Wind Farm development will also be lodged to Tipperary County Council. The proposed development includes underground cabling works located within the public road corridor within the curtilage of a Protected Structure (Tipperary RPS Ref. TRPS519 Croghan Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted to the planning authority with the application
in the townlands of Townparks Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly
(A) CHANGE OF USE OF PRE EXISTING OUTBUILDING TO COFFEE SHOP, RETENTION OF ADJOINING RESIDENTIAL UNIT AND PERMISSION FOR CHANGE OF USE FROM RESIDENTIAL UNIT TO STORE ANCILLARY TO COFFEE SHOP, RETENTION OF SEPTIC TANK AND PERCOLATION AREA SERVICING COFFEE SHOP, RETENTION OF POLYTUNNEL, RETENTION OF FREE STANDING TIMBER CLADDED SHOP UNIT, ALL AS CONSTRUCTED AND ANCILLARY TO EXISTING GARDEN CENTRE (B) PERMISSION FOR ADDITION AND ALTERATIONS TO EXISTING COFFEE SHOP, PERMISSION TO ERECT NEW POLYTUNNEL, PERMISSION FOR ALL ANCILLARY SIGNAGE, PERMISSION TO RELOCATE EXISTING VEHICULAR ENTRANCE ON NORTH EAST BOUNDARY WITH ON SITE CAR PARKING AND ALL ANCILLARY SITE WORKS
WOODFIELD , BIRR CO. OFFALY
(A) CHANGE OF USE OF PRE EXISTING OUTBUILDING TO COFFEE SHOP, RETENTION OF ADJOINING RESIDENTIAL UNIT AND PERMISSION FOR CHANGE OF USE FROM RESIDENTIAL UNIT TO STORE ANCILLARY TO COFFEE SHOP, RETENTION OF SEPTIC TANK AND PERCOLATION AREA SERVICING COFFEE SHOP, RETENTION OF POLYTUNNEL, RETENTION OF FREE STANDING TIMBER CLADDED SHOP UNIT, ALL AS C0NSTRUCTED AND ANCILLARY TO EXISTING GARDEN CENTRE (B) PERMISSION FOR ADDITION AND ALTERATIONS TO EXISTING COFFEE SHOP, PERMISSION TO ERECT NEW POLYTUNNEL, PERMISSION FOR ALL ANCILLARY SIGNAGE, PERMISSION TO RELOCATE EXISTING VEHICULAR ENTRANCE ON NORTH EAST BOUNDARY WITH ON SITE CAR PARKING AND ALL ANCILLARY SITE WORKS
WOODFIELD , BIRR , CO. OFFALY
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS
WOODFIELD , BIRR , CO. OFFALY
A NEW PRIMARY SCHOOL FOR GAELSCOIL NA LAOCHRA. THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCTION OF A NEW 4 CLASSROOM, 1 SEN BASE SCHOOL, GENERAL PURPOSE HALL, AND ALL ANCILLARY TEACHING SPACES AND SERVICES, SITE WORKS AND LANDSCAPING TO INCLUDE NEW ACCESS ROAD AND ENTRANCE OFF NEW DISTRIBUTOR ROAD, ATTENUATION TANKS, CAR PARKING AND SET DOWN, AND ALL ASSOCIATED SITE WORKS AND SERVICES
TOWNPARKS , BIRR , CO. OFFALY
THE FOLLOWING: ERECTION OF A FULLY SERVICED RESIDENTIAL HOUSING DEVELOPMENT OF 40 UNITS, CONSISTING OF 4.NO SINGLE STOREY SEMI-DETACHED 2 BEDROOM BUNGALOWS, 2 NO. SINGLE STOREY MID-TERRACE 1 BEDROOM BUNGALOWS, 20.NO. 3 BEDROOM 2 STOREY SEMI-DETACHED HOUSES, 6.NO. 3 BEDROOM 2 STOREY MID-TERRACE HOUSES AND 8. NO. 1 BEDROOM APARTMENTS IN 4 NO. 2 STOREY SEMI-DETACHED BLOCKS, WITH ALL ASSOCIATED SITE SERVICES, LANDSCAPING, SITE WORKS, BOUNDARY TREATMENTS, AND NEW ACCESS
LANDS TO THE EAST OF AND ACCESSED VIA THE EXISTING DEVELOPMENT AT FOREST VIEW , BANAGHER ROAD R439 TOWNPARKS BIRR , CO. OFFALY
THE CONSTRUCTION OF A NEW AGRICULTURAL ROAD ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
TULLAMORE ROAD , WOODFIELD OR TULLYNISK , BIRR CO OFFALY
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?