21732

CONDITIONAL

Offaly - Offaly County Council

Proposed Development

INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Nov 2021

  2. Further information requested

    31 Jan 2022

  3. Further information received

    8 Apr 2022

  4. Decision due

    5 May 2022

  5. Decision: CONDITIONAL

    5 May 2022

  6. Grant issued

    10 Jun 2022

Application Details

Location
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.124 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
29 November 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 May 2022
Grant Date
10 June 2022
Permission Expires
9 June 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

165m
21733CONDITIONAL29 Nov 2021

INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY

165m
21694N/A8 Nov 2021

INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS

WOODFIELD OR TULLYNISK , BIRR , CO OFFALY

562m
2360140CONDITIONAL6 Oct 2023

A ten year Planning Permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii) Reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) All associated site development works, ancillary works and apparatus considered necessary to facilitate the proposed development. The development subject of this application will facilitate the connection of the proposed 7 no. wind turbine Carrig Renewables Wind Farm to the national electricity grid. A concurrent application for the Carrig Renewables Wind Farm development has been lodged to Tipperary County Council. The proposed development includes underground cabling works located within the public road corridor within the curtilage of a Protected Structure (Tipperary RPS Ref. TRPS519 Croghan Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted to the planning authority with the application

In the townlands of Townparks (Birr) Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly

636m
2360120N/A22 Sept 2023

a ten-year planning permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii)reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) all associated site development works, ancillary works and apparatus considered necessary to facilitate the proposed development. The development subject of this application will facilitate the connection of the proposed 7 no. wind turbine Carrig Renewables Wind Farm to the national electricity grid. A concurrent application for the Carrig Renewables Wind Farm development will also be lodged to Tipperary County Council. The proposed development includes underground cabling works located within the public road corridor within the curtilage of a Protected Structure (Tipperary RPS Ref. TRPS519 Croghan Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted to the planning authority with the application

in the townlands of Townparks Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly

1.3km
17497CONDITIONAL18 Dec 2017

(A) CHANGE OF USE OF PRE EXISTING OUTBUILDING TO COFFEE SHOP, RETENTION OF ADJOINING RESIDENTIAL UNIT AND PERMISSION FOR CHANGE OF USE FROM RESIDENTIAL UNIT TO STORE ANCILLARY TO COFFEE SHOP, RETENTION OF SEPTIC TANK AND PERCOLATION AREA SERVICING COFFEE SHOP, RETENTION OF POLYTUNNEL, RETENTION OF FREE STANDING TIMBER CLADDED SHOP UNIT, ALL AS CONSTRUCTED AND ANCILLARY TO EXISTING GARDEN CENTRE (B) PERMISSION FOR ADDITION AND ALTERATIONS TO EXISTING COFFEE SHOP, PERMISSION TO ERECT NEW POLYTUNNEL, PERMISSION FOR ALL ANCILLARY SIGNAGE, PERMISSION TO RELOCATE EXISTING VEHICULAR ENTRANCE ON NORTH EAST BOUNDARY WITH ON SITE CAR PARKING AND ALL ANCILLARY SITE WORKS

WOODFIELD , BIRR CO. OFFALY

1.3km
17475N/A30 Nov 2017

(A) CHANGE OF USE OF PRE EXISTING OUTBUILDING TO COFFEE SHOP, RETENTION OF ADJOINING RESIDENTIAL UNIT AND PERMISSION FOR CHANGE OF USE FROM RESIDENTIAL UNIT TO STORE ANCILLARY TO COFFEE SHOP, RETENTION OF SEPTIC TANK AND PERCOLATION AREA SERVICING COFFEE SHOP, RETENTION OF POLYTUNNEL, RETENTION OF FREE STANDING TIMBER CLADDED SHOP UNIT, ALL AS C0NSTRUCTED AND ANCILLARY TO EXISTING GARDEN CENTRE (B) PERMISSION FOR ADDITION AND ALTERATIONS TO EXISTING COFFEE SHOP, PERMISSION TO ERECT NEW POLYTUNNEL, PERMISSION FOR ALL ANCILLARY SIGNAGE, PERMISSION TO RELOCATE EXISTING VEHICULAR ENTRANCE ON NORTH EAST BOUNDARY WITH ON SITE CAR PARKING AND ALL ANCILLARY SITE WORKS

WOODFIELD , BIRR , CO. OFFALY

1.3km
23434CONDITIONAL21 Dec 2023

CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS

WOODFIELD , BIRR , CO. OFFALY

1.3km
22672CONDITIONAL22 Dec 2022

A NEW PRIMARY SCHOOL FOR GAELSCOIL NA LAOCHRA. THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCTION OF A NEW 4 CLASSROOM, 1 SEN BASE SCHOOL, GENERAL PURPOSE HALL, AND ALL ANCILLARY TEACHING SPACES AND SERVICES, SITE WORKS AND LANDSCAPING TO INCLUDE NEW ACCESS ROAD AND ENTRANCE OFF NEW DISTRIBUTOR ROAD, ATTENUATION TANKS, CAR PARKING AND SET DOWN, AND ALL ASSOCIATED SITE WORKS AND SERVICES

TOWNPARKS , BIRR , CO. OFFALY

1.3km
22274CONDITIONAL31 May 2022

THE FOLLOWING: ERECTION OF A FULLY SERVICED RESIDENTIAL HOUSING DEVELOPMENT OF 40 UNITS, CONSISTING OF 4.NO SINGLE STOREY SEMI-DETACHED 2 BEDROOM BUNGALOWS, 2 NO. SINGLE STOREY MID-TERRACE 1 BEDROOM BUNGALOWS, 20.NO. 3 BEDROOM 2 STOREY SEMI-DETACHED HOUSES, 6.NO. 3 BEDROOM 2 STOREY MID-TERRACE HOUSES AND 8. NO. 1 BEDROOM APARTMENTS IN 4 NO. 2 STOREY SEMI-DETACHED BLOCKS, WITH ALL ASSOCIATED SITE SERVICES, LANDSCAPING, SITE WORKS, BOUNDARY TREATMENTS, AND NEW ACCESS

LANDS TO THE EAST OF AND ACCESSED VIA THE EXISTING DEVELOPMENT AT FOREST VIEW , BANAGHER ROAD R439 TOWNPARKS BIRR , CO. OFFALY

1.3km
20356N/A7 Aug 2020

THE CONSTRUCTION OF A NEW AGRICULTURAL ROAD ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

TULLAMORE ROAD , WOODFIELD OR TULLYNISK , BIRR CO OFFALY