The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

21733

CONDITIONAL

Offaly - Offaly County Council

Proposed Development

INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Nov 2021

  2. Decision: CONDITIONAL

    31 Jan 2022

  3. Decision due

    1 Feb 2022

  4. Grant issued

    25 Mar 2022

Application Details

Location
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.25 ha

Timeline

Registration Date
29 November 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
31 January 2022
Grant Date
25 March 2022
Permission Expires
24 March 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
21694N/A8 Nov 2021

INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS

WOODFIELD OR TULLYNISK , BIRR , CO OFFALY

165m
21732CONDITIONAL29 Nov 2021

INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY

515m
2360140CONDITIONAL6 Oct 2023

A ten year Planning Permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii) Reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) All associated site development works, ancillary works and apparatus considered necessary to facilitate the proposed development. The development subject of this application will facilitate the connection of the proposed 7 no. wind turbine Carrig Renewables Wind Farm to the national electricity grid. A concurrent application for the Carrig Renewables Wind Farm development has been lodged to Tipperary County Council. The proposed development includes underground cabling works located within the public road corridor within the curtilage of a Protected Structure (Tipperary RPS Ref. TRPS519 Croghan Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted to the planning authority with the application

In the townlands of Townparks (Birr) Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly

597m
2360120N/A22 Sept 2023

a ten-year planning permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii)reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) all associated site development works, ancillary works and apparatus considered necessary to facilitate the proposed development. The development subject of this application will facilitate the connection of the proposed 7 no. wind turbine Carrig Renewables Wind Farm to the national electricity grid. A concurrent application for the Carrig Renewables Wind Farm development will also be lodged to Tipperary County Council. The proposed development includes underground cabling works located within the public road corridor within the curtilage of a Protected Structure (Tipperary RPS Ref. TRPS519 Croghan Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted to the planning authority with the application

in the townlands of Townparks Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly

1.3km
2560367CONDITIONAL15 Aug 2025

100MW Battery Energy Storage Station with 53 battery containers and associated equipment, with a control room container, site entrance, and all associated works

Clondallow , Birr , Co. Offaly

1.3km
2560286N/A4 Jul 2025

100MW Battery Energy Storage Station with 53 battery containers and associated equipment, with a control room container, site entrance, and all associated works

Clondallow , Birr , Co. Offaly

1.3km
2460061N/A1 Mar 2024

100MW Battery Energy Storage Station with 53 battery containers and associated equipment, with a control room container, site entrance, and all associated works

Clondallow , Birr , Co. Offaly

1.3km
22672CONDITIONAL22 Dec 2022

A NEW PRIMARY SCHOOL FOR GAELSCOIL NA LAOCHRA. THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCTION OF A NEW 4 CLASSROOM, 1 SEN BASE SCHOOL, GENERAL PURPOSE HALL, AND ALL ANCILLARY TEACHING SPACES AND SERVICES, SITE WORKS AND LANDSCAPING TO INCLUDE NEW ACCESS ROAD AND ENTRANCE OFF NEW DISTRIBUTOR ROAD, ATTENUATION TANKS, CAR PARKING AND SET DOWN, AND ALL ASSOCIATED SITE WORKS AND SERVICES

TOWNPARKS , BIRR , CO. OFFALY

1.3km
22274CONDITIONAL31 May 2022

THE FOLLOWING: ERECTION OF A FULLY SERVICED RESIDENTIAL HOUSING DEVELOPMENT OF 40 UNITS, CONSISTING OF 4.NO SINGLE STOREY SEMI-DETACHED 2 BEDROOM BUNGALOWS, 2 NO. SINGLE STOREY MID-TERRACE 1 BEDROOM BUNGALOWS, 20.NO. 3 BEDROOM 2 STOREY SEMI-DETACHED HOUSES, 6.NO. 3 BEDROOM 2 STOREY MID-TERRACE HOUSES AND 8. NO. 1 BEDROOM APARTMENTS IN 4 NO. 2 STOREY SEMI-DETACHED BLOCKS, WITH ALL ASSOCIATED SITE SERVICES, LANDSCAPING, SITE WORKS, BOUNDARY TREATMENTS, AND NEW ACCESS

LANDS TO THE EAST OF AND ACCESSED VIA THE EXISTING DEVELOPMENT AT FOREST VIEW , BANAGHER ROAD R439 TOWNPARKS BIRR , CO. OFFALY

1.3km
2460221N/A12 Jun 2024

The development will consist of the Construction of a new single-storey extension to the southwest of the existing school building, which comprises six Classrooms and two Science Laboratories, including related accommodation and linking works to the existing school building. Refurbishment of existing Mainstream Classrooms to form a new two-classroom Special Needs Unit and the construction of a new single-storey extension to the northeast of the existing school building. Replacement of selected existing steel framed windows with new thermally broken powder-coated steel windows. Construction of a new Boiler House and Storage Shed on the South side of the existing school building. Associated site development works, including staff carpark realignment with new fencing with gates and a new replacement Ball Court to the east of the school buildings with all associated site development works.

St. Brendan’s Community School , Cappaneale Townparks Birr , Co. Offaly

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?