21742
CONDITIONALCavan - Cavan County Council
Proposed Development
to form new agricultural entrance, pipe drain and erect bridge to gain access
View the full application file on the council's planning portal →Application Timeline
Application received
8 Dec 2021
Decision: CONDITIONAL
2 Feb 2022
Decision due
10 Feb 2022
Grant issued
16 Mar 2022
Application Details
- Location
- Kilcogy , Co. Cavan
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cavan County Council
- Site Area
- 0.002 ha
Timeline
- Registration Date
- 8 December 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 2 February 2022
- Grant Date
- 16 March 2022
- Permission Expires
- 15 March 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to construct a two storey dwelling with detached domestic garage, form new entrance from public roadway, install waste water treatment system and percolation area, together with all associated site works
Kilcogy , Co. Cavan
to retain alterations & extension to existing dwelling house to include extension to kitchen, sitting room, bedroom & all existing works & PERMISSION to install septic tank & percolation area
Annagh , Clanmahon By Kilcogy , Co. Cavan
to erect fully serviced two storey dwelling & detached domestic garage, form entrance walls and piers, connect to public sewer and watermain, and all ancillary siteworks
Kilcogy , Co Cavan
the erection of a two storey dwelling house, detached domestic garage, entrance gates and piers, waste water treatment system with percolation area and all associated site works
Annagh , Kilcogy , Co Cavan
for development consisting of (1) to demolish existing agricultural storage shed (2) to construct agricultural shed to incorporate slatted areas, bedded areas and underground slurry storage tanks (3) to construct agricultural storage shed with adjacent manure storage pit (4) complete all ancillary site works and associated structures
Kilcogy , Co. Cavan
to (a) refurbish, carry out alterations to plans and elevations, install first floor and change the use of existing building to use as a dwelling house (b) connect to mains sewage and watermain (c) together with all associated site works
Kilcogy Lower , , Co. Cavan
to (a) refurbish, carry out alterations to plans and elevations, install first floor and change the use of existing building to use as a dwelling house (b) connect to mains sewage and watermain (c) together with all associated site works
Kilcogy , Lower , Co. Cavan
to (a) refurbish, carry out alterations to plans and elevations, install first floor and change the use of existing building to use as a dwelling house (b) connect to mains sewage and watermain (c) together with all associated site works
Kilcogy , Lower , Co. Cavan
for Retention of first floor extension to rear of existing dwelling (2) demolition of existing sunroom and erection of a single storey extension to side of existing dwelling (3) alterations to existing internal layout and external elevations (4) connection to existing services and all ancillary works
Kilcogy , Cavan , Co Cavan
for (1) retention of first floor extension to the rear of existing dwelling, (2) demolition of existing sunroom and erection of a single storey extension to side of existing dwelling (3) alterations to existing internal layout and external elevations (4) connection to existing services and all ancillary site works
Kilcogy , Co.Cavan
Planning a project of your own?
Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.
Do I Need Permission?