21783
CONDITIONALCavan - Cavan County Council
Proposed Development
to retain and complete part single storey/ part two storey dwelling under construction whis is a change of house type from that previously approved under planning reference 19/464 which included removal of an existing dwelling and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
22 Dec 2021
Decision: CONDITIONAL
15 Feb 2022
Decision due
24 Feb 2022
Grant issued
28 Mar 2022
Application Details
- Location
- Drumcartagh , Killeshandra , Co. Cavan
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cavan County Council
- Site Area
- 0.47 ha
- Floor Area
- 194 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 22 December 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 February 2022
- Grant Date
- 28 March 2022
- Permission Expires
- 27 March 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to demolish existing bungalow dwelling and construct replacement part single storey/part dormer dwelling, use and upgrade existing entrance, decommission existing septic tank and provide new effluent treatment system, percolation area and associated site works
Drumcartagh , Killeshandra , Co Cavan
to retain garage substructure and complete domestic storage portal frame garage and associated site works
Drumcartagh , Killeshandra , Co.Cavan
to construct 1 no. Bell-mouth type entrance and associated site development works to service existing forestry plantation
Drumbagh , Killeshandra , Co. Cavan
for a ten-year planning permission for a solar energy development comprising photovoltaic solar panels on mounting frames; electrical control building and MV power station; underground electrical and communications cabling; access tracks; security fencing; pole-mounted security cameras; and all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. An Appropriate Assessment Screening Report will be submitted to the Planning Authority with the application.
Bocade Glebe , Killashandra , Co. Cavan
for 1) to RETENTION of the existing 30m high telecommunications support structure carrying antenna and dishes, communications cabins and associated site works including solar PV panels contained within a chain link fenced compound previously granted permission under reference 10/351 AND, 2) PERMISSION to install additional antenna, dish equipment to the support structure including ground equipment cabinets and associated site works
Mullaghmullan , Killashandra , Co. Cavan
for the construction of a single storey sunroom extension to existing dormer style bungalow dwelling, internal and external alterations to existing dwelling and all ancillary site works
Killygowan , Killashandra , Co Cavan
to construct a shed which will consist of a milking parlour, motor room and all associated site works
Drumbo , Killeshandra , Co Cavan
to construct a four bay shed which will consist of slatted area with slurry holding tank underneath, cubicles and all associated site works
Drumbo , Killeshandra , Co. Cavan
to retain alterations to existing development previously approved and commenced under planning reference no. 02/1417 which includes (a) alterations to site boundaries (b) conversion of first floor attic to habitable space (c) alterations to floorplans/elevations including increased ridge height and rooflights to rear elevation of existing dormer dwelling
Killygowan , Killeshandra , Co Cavan
to retain (a) two storey residential extension to northeast side (rear) of existing dwelling with alterations to floor plans and elevations including front porch of previously approved permission, Planning Ref No. 08/50 together with (b) PERMISSION for two storey residential extension to west side an associated site works
Drumbinnis , Killeshandra , Co Cavan
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?