The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

21794

N/A

Kilkenny - Kilkenny County Council

Proposed Development

to retain as follows: 1. extension to the side and rear of existing dwelling house, 2. domestic shed and carport, 3. domestic home office and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Sept 2021

  2. Further information requested

    11 Nov 2021

  3. Application withdrawn

    11 Oct 2022

Application Details

Location
Baunreagh , Clonmoran , Co Kilkenny
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kilkenny County Council
Site Area
0.924 ha

Timeline

Registration Date
22 September 2021
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
11 October 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
2360342CONDITIONAL25 Jul 2023

to retain as follows: 1. extension to the side and rear of existing dwelling house, 2. domestic shed and carport, 3. domestic home office, 4. Planning Permission to install a secondary treatment system and polishing filter and all associated site works

Baunreagh , Clonmoran , Co. KIlkenny

86m
243N/A16 Jan 2024

For extension of Duration on Planning Permission on P18/718 and 23/152

Baunreagh , Co. Kilkenny

86m
23152CONDITIONAL14 Jun 2023

for a) change of house design from two storey dwelling to single storey dwelling with attached car port & domestic garage & b) modification of the house position on the site to Planning Ref No. 18.718 with all previously permitted associated site works

Baunreagh , Co Kilkenny

86m
18718CONDITIONAL26 Oct 2018

to construct/install a new dwelling, domestic garage, on-site wastewater treatment and disposal system, new entrance, private well and all associated site works on our site

Baunreagh , Co. Kilkenny

86m
2460358N/A26 Jul 2024

PERMISSION TO RETAIN, FOUNDATIONS, BASE TO FLOOR LEVEL AND RISING BLOCK WORK TO VARIOUS LEVELS AS CURRENTLY CONSTRUCTED. (THE PREVIOUS CONSENTS PERTAINING TO THIS DEVELOPMENT; 18/718 – INITIAL CONSENT FOR TWO STOREY DWELLING HOUSE, ENTRANCE AND ASSOCIATED SITE WORKS, & 23/152 – CONSENT FOR CHANGE OF HOUSE TYPE FROM TWO STOREY TO SINGLE STOREY DESIGN) B) PLANNING PERMISSION TO CONSTRUCT A SINGLE STOREY DESIGN DWELLING, THE PROVISION OF AN ANCILLARY GARAGE, PROVISION OF ETU WITH PERCOLATION AREA, SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS

Baunreagh , Co. Kilkenny

86m
2460359CONDITIONAL26 Jul 2024

TO RETAIN, FOUNDATIONS, BASE TO FLOOR LEVEL AND RISING BLOCK WORK TO VARIOUS LEVELS AS CURRENTLY CONSTRUCTED. (THE PREVIOUS CONSENTS PERTAINING TO THIS DEVELOPMENT; 18/718 – INITIAL CONSENT FOR TWO STOREY DWELLING HOUSE, ENTRANCE AND ASSOCIATED SITE WORKS, & 23/152 – CONSENT FOR CHANGE OF HOUSE TYPE FROM TWO STOREY TO SINGLE STOREY DESIGN) B) PLANNING PERMISSION TO CONSTRUCT A SINGLE STOREY DESIGN DWELLING, THE PROVISION OF AN ANCILLARY GARAGE, PROVISION OF ETU WITH PERCOLATION AREA, SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS

Baunreagh , Co. Kilkenny

86m
2441REFUSED8 Apr 2024

of Planning Permission Ref P23/152 and P18/718

Baunreagh , Co Kilkenny

86m
2460314N/A3 Jul 2024

for Development. THE DEVELOPMENT CONSISTS OF:- PERMISSION TO RETAIN & COMPLETE ALL WORKS TO THE FOLLOWING PLANNING FILES; PLANNING REF NO. 23/152 & 18/718 WITH ALL ASSOCIATED SITE WORKS

BAUNREAGH , KILKENNY

153m
20466CONDITIONAL21 Jul 2020

to demolish existing stone shed and construct a new agricultural shed and all associated site development works

Baunreagh , Co. Kilkenny

156m
18122CONDITIONAL22 Feb 2018

for development consisting of a two storey dwelling house, detached garage, waste water treatment system and associated site works at

Shellumsrath , Co. Kilkenny

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?