21859
N/AKildare - Kildare County Council
Proposed Development
constructing 1 No. creche unit 1 block containing 4 No. ground floor commercial units and 4 No. first floor apartment units, 1 No. detached bin store, and 33 No. dwellings. The dwellings consist of 4 No. 2 storey semi-detached houses and 29 No. 2 storey terraced houses in 7 No. blocks. The development also includes a new recessed vehicular entrance, provision of part road as defined in the KCC Development Plan 2017-2023, connection to existing foul sewer and all associated ancillary site-works
View the full application file on the council's planning portal →Application Timeline
Application received
14 Jun 2021
Further information requested
5 Aug 2021
Application withdrawn
17 Aug 2022
Application Details
- Location
- Ballitore , Co. Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 1.88 ha
- Floor Area
- 4314.800000000001 sq m
- Residential Units
- 37
Timeline
- Registration Date
- 14 June 2021
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 17 August 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for constructing 29 dwellings consisting of 8 no. apartments in 2 No. 2-storey blocks, 8 No. terraced houses in 2 No. 2-storey terrace blocks, 10 No. semi-detached 2-storey houses, and 3 No. detached houses. The development also consists of a new recessed vehicular entrance, provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment and mid-terrace units, connection to foul water sewer, new footpath connecting to existing footpath and all associated ancillary site-works
Ballitore , Athy , Co. Kildare
constructing a creche and 34 dwellings. The dwellings will consist of 8 no. apartments in 2 No. 2-storey blocks, 22 No. semi-detached 2-storey houses, and 4 No. detached 2-storey houses. The development also consists of a provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment unit, connection to foul water sewer, and all associated ancillary site-works
Ballitore , Co. Kildare
Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works
Fullers Court Road , Ballitore , Co. Kildare
Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works
Fullers Court Road , Ballitore , Co. Kildare
for constructing 8 No. semi-detached 2-storey houses. The development also consists of a new recessed vehicular entrance off Abby’s Row and a new recessed vehicular entrance off Cockpit Lane, new internal road network connecting Abby’s Row and Cockpit Lane, connection to foul water sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of: A revised site layout consisting of 2 no 4 bed Detached two-storey dwellings, 4 no 3-bed semi-detached two-storey dwellings, 2 no 2 bed semi-detached two-storey dwellings, revised landscaping plans, submission of an Architectural Heritage Impact Assessment, Ecological Impact Assessment, tree and hedge survey, revised Part V submission and a Road Safety Audit. The development also consists of a new recessed vehicular entrance off Abby's Row and a new recessed vehicular exit to Cockpit Lane, new internal road network connecting Abby's Row and Cockpit Lane, connection to foul water sewer, and all associated ancillary site-works
Ballitore , Co. Kildare
constructing 16 No. dwellings consisting of 4 No. 2 storey 4-bed semi-detached houses, 10 No. 2 storey 3-bed semi-detached houses, 2 No. 2 storey 2-bed semi detached houses, connection to foul sewer granted permission under Pl. Ref. 20/156 and all associated ancillary siteworks. A Natura Impact Statement (NIS) accompanies this application . Revised by Significant Further Information which consists of 1) alterations to site layout and 2) alterations to housing mix to now consist of 2 No.2 storey 4-bed detached houses and 1 No.2 storey 4- bed semi-detached house. 9 No. 2 storey 3-bed semi detached houses and 4 No.2 storey 2-bed semi-detached houses. Revised by significant further information which consists of alterations to housing mix now consist of 1 No. 2 storey 4-bed detached house. 1 No. 2 storey 4-bed detached house, 1 No. 2 storey 3-bed detached house, 10 No. 2 storey 3-bed semi-detached houses and 4 No.2 storey 2 bed semi detached houses. The significant further information is due to the unit mix been different from previous notices.
Fuller's Court Road , Ballitore , Co. Kildare
development consists of constructing 16 No. dwellings consisting of 4 No. 2 storey 4-bed semi-detached houses, 10 No. 2 storey 3-bed semi-detached houses, 2 No. 2 storey 2-bed semi detached houses, connection to foul sewer granted permission under Pl. Ref. 20/156 and all associated ancillary siteworks. A Natura Impact Statement (NIS) accompanies and will be available for inspection at the office of the Planning Authority. Development
Fuller's Court Road , Ballitore , Co. Kildare.
for the construction of 2 no. single storey semi-detached dwellings, connection to existing foul water sewer, and all associated ancillary site-works
Cockpit Lane , Ballitore , Co. Kildare
for constructing 8 No. dwellings consisting of 2 No. detached 2-storey houses and 2 No. 2-storey terrace blocks consisting of 3 No. houses each. The development also consists of individual domestic vehicular entrances off Abbeyfield and Mill Lane, new shared cycle / footpath along Mill Lane, connection to foul water sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of: The principal amendments to the original scheme entail 1) revised site layout including revised access arrangements; 2) revised building designs; 3) revised landscaping and boundary treatments; and 4) revised location of cycle path
Ballitore , Athy , Co. Kildare
to construct 4 No. two storey semi detached dwellings, form connections to public services including foul water sewer, surface water sewer and water mains, including new boundary treatments, construct new vehicular entrances with all ancillary services and associated site works at
Cockpit Lane , Ballitore , Co. Kildare
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?