The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

21956

N/A

Kerry - Kerry County Council

Proposed Development

CONSTRUCT A WASTE RECOVERY FACILITY FOR THE IMPORTATION OF WASTE MATERIAL COMPRISING OF SOIL AND STONE (17 05 04) TO RAISE AN AGRICULTURAL FIELD IN ORDER TO IMPROVE THE AGRICULTURAL OUTPUT OF THE FIELD. A NATURA IMPACT STATEMENT (NIS) HAS BE PREPARED AND WILL BE SUBMITTED WITH THIS APPLICATION

View the full application file on the council's planning portal →

Application Details

Location
DERRA WEST , LISTOWEL , CO KERRY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
1.755 ha

Timeline

Registration Date
18 August 2021
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

139m
21412CONDITIONAL16 Apr 2021

RETAIN AN EXISTING ACCESS AND PLANNING PERMISSION TO UPGRADE THIS ACCESS

DERRA WEST , LISTOWEL , CO KERRY

161m
21780CONDITIONAL9 Jul 2021

RETAIN AND COMPLETE AGRICULTURAL SHED ON HIS LAND HOLDING

DERRA EAST , LISTOWEL , CO KERRY

182m
23581CONDITIONAL23 May 2023

RETAIN DOMESTIC GARAGE/UTILITY STORE WITH A LOFT AT FIRST FLOOR LEVEL ALSO TO RETAIN TURF SHED

DERRA WEST , LISTOWEL , CO KERRY

374m
171060CONDITIONAL24 Oct 2017

TO RETAIN DWELLING HOUSE AND ALL OUT BUILDINGS AND SHEDS AS CONSTRUCTED WITHIN REVISED SITE BOUNDARIES AND PERMISSION TO DECOMMISSION EXISTING WASTE WATER TREATMENT SYSTEM AND INSTALL NEW WASTE WATER TREATMENT SYSTEM ON SITE

DERRA WEST , LISTOWEL , CO KERRY

375m
2658CONDITIONAL25 Mar 2026

(a) Retain a stone area on his land holding (b) retain entrance and Planning Permission to erect an agricultural storage shed for storing fodder

Derra West , Listowel , Co. Kerry

429m
23475CONDITIONAL2 May 2023

RETAIN THEIR DOMESTIC GARAGE/UTILITY STORE AS CONSTRUCTED TO THE REAR OF THEIR SITE

DERRA WEST , LISTOWEL , CO KERRY

444m
2660506N/A5 Jun 2026

REDS III: The development will consist of a 10-year permission for a solar photovoltaic (PV) energy development on a site spanning approximately 138.9 hectares. It will consist of the construction of PV panels mounted on metal frames, 38 inverters, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, 4 temporary construction compounds, drainage infrastructure, landscaping and all ancillary electrical infrastructure and associated works. A separate application for the associated grid route and future 110kV substation will be submitted to An Coimisiún Pleanála (ACP) as these proposed elements fall within the Strategic Infrastructure Development consent process under Section 182A of the Planning and Development Act 2000 (as amended).The Application Site will be accessed from four new access points off the R553, L6029 and L6028 and one existing access point off the L6037. The development is designed to operate for 40 years from the date of commissioning. A Natura Impact Statement (NIS) will accompany the planning application.

situated on land within the townlands of Inch East Garryard Carhoonaknock West Shrone Middle Derra East and Derra West , Civil Parish of Galey , County Kerry

632m
201264CONDITIONAL22 Dec 2020

ERECT AN EASY FEED SYSTEM WITH AN UNDERGROUND SLURRY TANK ON HER FARMYARD

HERMITAGE FARM , DIRHA WEST , LISTOWEL

730m
17689CONDITIONAL18 Jul 2017

(A) BUILD A DWELLING HOUSE AND WASTE WATER TREATMENT UNIT AND SOIL POLISHING FILTER ALL ASSOCIATED SITE WORKS, (B) TO BUILD A DETACHED DOMESTIC GARAGE AND ASSOCIATED SITE WORKS ALL AT SITE 11 AND (C) TO COMPLETE EXISTING ESTATE ROAD, FOOTPATH AND SITE SERVICES

DERRA EAST , LISTOWEL , CO KERRY

1.1km
20612N/A10 Jul 2020

RETAIN EXISTING VIEWING STAND AND MACHINERY SHELTER, ALL ON THEIR LAND

DERRA EAST , LISTOWEL , CO KERRY

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?