The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

22/4379

INCOMPLETED APPLICATION

Cork - Cork County Council

Proposed Development

The development will consist of a soil recovery facility for greenfield soil and stones with smaller quantities of concrete, bricks, tiles, and ceramics (the concrete, bricks, tiles, and ceramics will be used for internal road building). The proposed development will involve the remediation by infilling of existing agricultural land which was historically excavated in the past. The site comprises 1.58 hectares, of which 1.09ha will be fill area. The proposed development incorporates improving the existing site entrance, and all ancillary works associated with the development.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Feb 2022

  2. Decision due

    19 Apr 2022

Application Details

Location
Doirin Alainn Derreenaling Baile Mhuirne Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
23 February 2022
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
19 April 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
22/4724CONDITIONAL4 Apr 2022

The development will consist of a soil recovery facility for greenfield soil and stones with smaller quantities of concrete, bricks, tiles, and ceramics (the concrete, bricks, tiles, and ceramics will be used for internal road building). The proposed development will involve the remediation by infilling of existing agricultural land which was historically excavated in the past. The site comprises 1.58 hectares, of which 1.09ha will be fill area. The proposed development incorporates improving the existing site entrance, and all ancillary works associated with the development

Doirin Alainn Baile Mhuirne Derreenaling, Ballyvourney Co.Cork

498m
23646REFUSED6 Jun 2023

THE DEVELOPMENT IN COUNTY KERRY FORMS PART OF A RENEWABLE ENERGY DEVELOPMENT COMPRISING A FIVE-TURBINE WIND FARM AND ALL ASSOCIATED WORKS ON LANDS IN BOTH COUNTIES CORK AND KERRY. THE DEVELOPMENT IN COUNTY KERRY WILL CONSIST OF UPGRADE OF EXISTING FOREST ACCESS ROADS TO INCLUDE PASSING BAYS AND ALL ASSOCIATED DRAINAGE INFRASTRUCTURE, WORKS AT THE ENTRANCE TO AN EXISTING FOREST ROAD ACCESSED OFF THE N22 TO INCLUDE LOCALISED WIDENING OF THE FOREST ROAD AND CREATION OF A SPLAYED ENTRANCE, REMOVAL OF EXISTING VEGETATION FOR VISIBILITY SPLAYS AND REMOVAL OF STREET FURNITURE. ADVISORY NOTE: A PLANNING APPLICATION IS BEING LODGED WITH CORK COUNTY COUNICL IN RELATION TO THE ELEMENTS IN THE PROJECT THAT ARE WITHIN THE TOWNLANDS OF INCHAMORE, MILLEENY AND DERREENALING COUNTY CORK. THIS DEVELOPMENT INCLUDES FIVE WIND TURBINES, UNDERGROUND CABLING, SITE ACCESS ROADS, A BORROW PIT, A TEMPORARY SITE COMPOUND, A 38KV SUBSTATION AND ALL ASSOCIATED WORKS FOR WHICH A TEN-YEAR PLANNING PERMISSION IS BEING SOUGHT. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS)

DERRYREAG (NDOIRE AIMHRÉIDH) , CO KERRY

722m
21/7318CONDITIONAL13 Dec 2021

Erecting a 30m high latticework telecommunications structure together with antennas, dishes and associated telecommunications equipment enclosed by security fencing and all associated site works with an extension to the existing access track.

Derreenaling (Td) Ballyvourney Co. Cork

924m
05/9367CONDITIONAL16 Dec 2005

Dwelling

Derreenaling Ballyvourney

924m
11/4063UNCONDITIONAL18 Jan 2011

Completion of dwellinghouse permitted under Pl. Reg. No. 05/9367

Derreenaling Ballyvourney

1.7km
23/5145Refused7 Jun 2023

We, Inchamore Wind Designated Activity Company, intend to apply for permission for a ten-year planning permission for a renewable energy development. The entirety of the renewable energy development constitutes the provision of a five-turbine wind farm and all associated works on land in both Counties Cork and Kerry. The development for will consist of : 1) a wind farm with an operational lifespan of 35 years (from date of commissioning of the development), 2) the construction of five turbines with an overall ground to blade tip height ranging from 177m to 185m inclusive; a rotor diameter ranging of 149m to 155m inclusive; and a hub height ranging from 102.5m to 110.5m inclusive, 3)construction of permanent turbine hardstands and turbine foundations, 4) Construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing. 5) installation of a (35-year life cycle) meteorological mast with a height of 110m and a 4m lightning pole on top, such that the overall structure will be 114m, 6) development of an on-site borrow pit, 7) construction of a new permanent internal site access roads to include passing bays and all associated drainage infrastructure. 8) development of a permanent internal site drainage network and sediment control systems. 9) construction of a permanent 38 kV electrical substation including a control building with welfare facilities, all associated electrical plant and equipment, parking security fencing and gates, all associated underground cabling, wastewater holding tank, and all ancillary structures and works, 10) all associated underground electrical and communications cabling connecting the wind turbines to the on-site wind farm substation, 11) ancillary forestry felling to facilitate construction of the development, 12) all associated site development works including berms, landscaping, and soil excavation. Advisory note: A planning application is being lodged with Kerry County Council in relation to the elements of the project that are within the townland of Derryreag (Dhoire Aimhréidh) Co.Kerry, including the upgrade of the site entrance off the N22 and permanent forest track upgrade works. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS). Tá sé beartaithe againne, inchamore Wind Cuideachta Ghníomhaíochta Ainmnithe, iarratas adhéanamh ar Chead maidir le cead pleanála deich mbliana d’fhorbairt fuinnimh in-athnuaite. Is ionann an fhorbairt fuinnimh in-athnuaite ina hiomláine agus feirm ghaoithe cúig thuirbín a sholáthar ahus ne hoibreacha gaolmhara go léir ar thailte I gContaetha Chorcaí agus Chiarraí. Beigh an fhorbairt comhdhéanta de: 1) Feirm ghaoithe le saolré oibriúcháin 35 bliain (ó dháta coimisiúnaithe na forbartha), 2) Tógáil cúig thuirbín le aired iomlán ó thalamh go barr an lann le ó 177m go 185 san áireamh; trastomhas rótar ó 149m go 155m san áireamh; agus aired moil ó 102.5m go 110.5m san áireamh, 3) Tógáil cruasheatán tuirbíní, 4) Tógáil príomhshuíomh tógála sealadach amháin le hoifigí suímh shealadacha ghailmhara, limistéir pháirceála agus fálú slándála, 5) Suiteáil crann meisteareolaíochta (saolré 35 bliana) a bheidh 110 méadar ar aired agus cuaillle tintrí 4m ar a bharr, sa tslí is go mbeidh aired foriomlán se 114 méadar ag an struchtúr, 6) Forbairt sloc iasachtaí amháin ar an láthair, 7) Tógáil buanbhóithre rochtana inmheáncha nua don láithreán agus uasghrádú ar bhóithre rochtana inmheánacha láithreacha chun cúinsí pasála agus an bonneagar draenála gaolmhar go léir a áireamh. 8) Forbairt líonra inmheánach draenála suímh buan agus córais rialathe dríodair, 9) fostáisiún buan leictreach 38kV a thógáil lena n-áirítear foirgneamh rialaithe le háiseanna leasa, gach gléasra agus trealamh leictreach gaolmhar, páirceáil, fálú slándála agus geataí, gach cábla faoi thalamh a bhaineann leis, umar coinneála fuíolluisce, agus gach struchtúr agus oibreacha coi

Inchnamore / na hInse Móire Milleeny / na Millíní Derreenaling / an Doirín Álainn Co.Cork /Co.Chorcaí

1.8km
08/6360CONDITIONAL28 Apr 2008

Dormer bungalow with garage, septic tank and ancillary works

Commeen Bridge Derrynasaggart

1.8km
06/8016CONDITIONAL13 Jun 2006

Installation of septic tank to serve existing dwelling

Derreenaling Ballyvourney Macroom

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?