The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

221117

N/A

Mayo - Mayo County Council

Proposed Development

SECTION 5 DECLARATION: ERECTION OF ROOF MOUNTED SOLAR PV PANELS TO THE ROOF OF THE FACTORY

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Dec 2022

  2. Decision due

    24 Jan 2023

Application Details

Location
Erriff , Ballyhaunis
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Mayo County Council

Timeline

Registration Date
19 December 2022
Status
APPLICATION FINALISED
Decision
N/A
Decision Due
24 January 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
24530N/A18 Dec 2024

construction of a pedestrian underpass tunnel to run under the Knock Road (R323) and for the construction of two enclosed access stairways to the underpass, together with all ancillary site works and services

Erriff , Bekan , Claremorris

1m
22733CONDITIONAL29 Aug 2022

THE INSTALLATION OF ROOF MOUNTED SOLAR PHOTOVOLTAIC (PV) PANEL ARRAYS WITH A COMBINED AREA OF UP TO 5320 SQM PROVIDING UP TO 970kW. THE PV PANELS TO BE MOUNTED ON AND PARALLEL TO THE PITCH OF THE EXISTING ROOFS OF THE FACTORY BUILDING AND THE COLDSTORE BUILDING. THE DEVELOPMENT TO INCLUDE ALL ANCILLARY SITE WORKS AND SERVICES. THE DEVELOPMENT RELATES TO A CURRENT INDUSTRIAL EMISSIONS LICENCE (REF: P0831-02)

WESTERN BRAND CHICKEN LTD. , ERRIFF , BALLYHAUNIS

39m
18208CONDITIONAL27 Mar 2018

CONSTRUCT STORAGE SHED (ANCILLARY TO EXISTING PRODUCTION FACILITY) TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES

ERRIFF , BEKAN , CO. MAYO

44m
20544CONDITIONAL6 Aug 2020

CHANGE OF USE OF STORAGE SHED GRANTED UNDER P18/208 TO BREADING FACILITY TOGETHER WITH EXTENSION TO SAME, TOGETHER WITH ALL ANCILLARY STIE WORKS AND SERVICES.

ERRIFF , BEKAN

190m
2412N/A24 Jan 2024

construction of a pedestrian underpass tunnel to run under the Knock road (R323) and for the construction of two enclosed access stairways to the underpass, together with all ancillary site works and services

Erriff , Bekan , Claremorris

205m
21869CONDITIONAL12 Aug 2021

INSTALLATION OF A 750 CUBIC METER ABOVE GROUND TANK TO STORE FULLY TREATED EFFLUENT PRIOR TO FINAL DISPOSAL, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES. THE DEVELOPMENT RELATES TO A CURRENT INDUSTRIAL EMISSIONS LICENCE (REF: P0831-02)

KNOCKAUNACAT , BALLYHAUNIS , CO. MAYO

546m
17433CONDITIONAL7 Jun 2017

CONSTRUCT NEW GARAGE/STORE INCLUDING ALL ANCILLARY SITE DEVELOPMENT WORKS TO SIDE OF EXISTING HOUSE

TURLOUGH , BALLYHAUNIS

598m
18232CONDITIONAL6 Apr 2018

CONSTRUCT A NEW SLATTED SHED AND MANURE PIT TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES

DERRYMORE , BALLYHAUNIS , CO. MAYO

605m
25280N/A17 Jul 2025

Section 5 Declaration: permenent relocation of the treated effluent discharge point approved under P21/859. the discharge point to be relocated 350m upstream from its current location

Drumbaun , Ballyhaunis

821m
2660554N/A8 Jul 2026

The development will consist of the demolition of elements of the existing dwelling, the construction of a new storey and a half extension to the east of the existing dwelling, internal and external alterations and refurbishment works to the existing dwelling including the building up of the hipped roof into a gable roof and the provision of a new septic tank and percolation area together with all associated site development works.

Greenwood , Ballyhaunis , Co. Mayo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?