The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

221191

N/A

Meath - Meath County Council

Proposed Development

the construction of 3 no. detached dwellings (one with detached garage and 2 no. with attached car ports), new vehicular entrances, along with all associated services, service connections, landscaping and site development works

View the full application file on the council's planning portal →

Application Details

Location
Watery Lane (Lemare) , Stamullen , Co Meath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Meath County Council
Site Area
0.522 ha
Floor Area
761 sq m
Residential Units
1

Timeline

Registration Date
12 September 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

6m
221394REFUSED25 Oct 2022

the construction of 3 no. detached dwellings (one with detached garage and 2 no. with attached car ports), new vehicular entrances, along with all associated services, service connections, landscaping and site development works. Significant further information/revised plans submitted on this application

Watery Lane (Lemare) , Stamullen , Co. Meath

14m
AA201591CONDITIONAL30 Oct 2020

The development will consist of the construction of a detached dwelling and garage, new vehicular entrance, along with all associated services, service connections, landscaping and site development works.

Watery Lane (Lemare) , Stamullin , Co. Meath

14m
2561273CONDITIONAL24 Nov 2025

the development will consist of the installation of a new wastewater treatment plant and percolation area along with all associated site works

Watery Lane (Lemare) , Stamullen , Co. Meath

24m
AA180235CONDITIONAL12 Mar 2018

development will consist of outline permission for construction of a detached dwelling and garage, new vehicular entrance, along with all associated services, service connections, landscaping and site development works

Watery Lane (Lemare) , Stamullin , Co. Meath

40m
2497N/A7 Mar 2024

outline permission for the construction of a dwelling with attached garage, new vehicular entrance, connection to the mains water and four water system, landscaping and all associated site works

Lemare , Stamullen , Co Meath

40m
24157REFUSED11 Apr 2024

outline permission for the construction of a dwelling with attached garage, new vehicular entrance, connection to the mains water and foul water system, landscaping and all associated site works

Watery Lane , Lemare , Stamullen

90m
212304CONDITIONAL9 Dec 2021

the development consists of the following: (1) the retention of a single storey covered area to the front of Whytes Public House, (2) the retention of a smoking area to the rear of the property, (3) the retention of an external dining area to the rear of the property and (4) the retention of a store shed to the rear of the property

Whytes Public House , Main Street , Stamullen Co. Meath

100m
2460135CONDITIONAL26 Feb 2024

Change of use of partial ground floor unit from restaurant to bookmakers and all associated site works.

Main Street , Stamullen , Meath

100m
2560516CONDITIONAL21 May 2025

change of use of partial ground floor unit from restaurant to retail unit and all associated site works

Main Street , Stamullen , Co. Meath K32 F677

161m
221706CONDITIONAL21 Dec 2022

1. Single storey extension to rear of existing retail unit over existing basement carpark to consist of relocated Post Office, goods store, office and ancillary staff facilities 2. Internal alterations to existing reatil unit 3. New illuminated signage to front elevation (replacing existing) and new signage to side elevation, together with all associated site works

CENTRA Unit 1-4 , The Delvin Centre Main Street , Stamullen Co Meath K32 X431

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?