Proposed Development
the proposed development will consist of: (A) Renovation of the existing two-storey farmhouse, (B) Construction of a single-storey extension of approx. 115 sq m to the rear of the existing farmhouse, (C) Improve existing site vehicular entrance, (D) Install new sewage treatment system unit and percolation area, together with all associated siteworks
View the full application file on the council's planning portal →Application Timeline
Application received
21 Sept 2022
Decision: CONDITIONAL
14 Nov 2022
Decision due
15 Nov 2022
Grant issued
6 Jan 2023
Application Details
- Location
- Leafin , Nobber , Kells Co. Meath
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Meath County Council
- Site Area
- 0.56 ha
Timeline
- Registration Date
- 21 September 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 November 2022
- Grant Date
- 6 January 2023
- Permission Expires
- 5 January 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the development consists of retention of existing shed for agricultural purposes and all associated site development works
Rathgillan , Nobber , Co. Meath
Side/Front extension to existing dwelling house , and all associated site works
Leafin , Nobber , County Meath
new entrance, permission to deposit clean subsoil and topsoil on site and all ancillary site works (previous planning application number KA/60008. Significant further information/revised plans submitted on this application
Muff , Nobber , Co. Meath
the importation and insertion of c.100,000 tonnes of excavation spoil, over a five-year period and not exceeding 25,000 tonnes in a single year. The excavation spoil comprises of natural materials of clay, silt, sand, gravel or stone beneficial for agricultural purposes. On site equipment includes: existing site wheel wash, exiting mobile portacabin welfare facilities, existing material inspection and quarantine area. There is no planned removal of hedge line vegetation on the perimeter of the site. Significant Further Information / Revised plans submitted on this application.
Muff , Nobber , Co Meath
The development will consist of the importation and insertion of c.143,826 tonnes of uncontaminated soil and stone as a non-waste by product over a six year period, not exceeding 25,000 tonnes/annum, to improve 7.34 hectares of agricultural lands where: •The further use of the soil and stone is certain and will be used to recontour and improve the agricultural lands; •The soil and stone can be used directly without further processing. •The soil and stone will be an integral part of a production process i.e. soil will be excavated, moved to facilitate site development in accordance with Article 27 by a material producer or with the expressed written consent of a material producer and will be notifiable to the EPA as a by - product prior to its use on lands. •The proposed further use of the soil and stone fulfils all relevant product, environmental and health protection requirements for the specific use and will not lead to overall adverse environmental or human health impacts. On site equipment includes: •Existing site wheel wash; •Existing mobile portacabin welfare facilities; •Existing material inspection and quarantine area; There is no planned removal of hedge line vegetation on the perimeter of the site.
Muff , Nobber , Co. Meath
1. Retention of single storey extension to rear of dwelling from previously granted under 73/1812. 2. Retention of revised boundaries from previously granted under 73/1812. 3. Retention of Domestic Garage and all ancillary site works
Woodview Muff , Nobber , Co. Meath
the construction of an agricultural underpass linkage area under existing public road (cul de sac) and all site works. Significant further information/revised plans submitted on this application
Muff , Nobber , Co Meath
The development will consist of a new proposed two storey dwelling, new detached single storey garage and associated carport, use of the existing agricultural entrance as a domestic entrance, new wastewater treatment system and soil polishing filter together with all associated site development works.
Muff , Nobber Kells , Co. Meath
the retention of 1. sunroom and small extension to rear of dwelling 2. steel shed along with all ancillarysite works
9 Muff Crescent , Nobber , Co Meath
construction of a biomass combined heat and power (CHP) plant and associated ash landfill facility adjacent to the existing meat rendering plant on the College Proteins site, located in the townlands of College and Rathgillen. The application site extends approximatley 19.25 Hectares. The Biomass CHP plant, when operating at full capacity, will be capable of processing 105,000 tonnes of biomass per annum. the proposed CHP plant has been designed to process a maximum of 52,500 tonnes per annum of meat and bone meal (MBM) and 52,500 tonnes per annum of waste organic liquids (derived from the agriculture, food and drink industries). The plant will generate some eight megawatts of electricity and will provide a net export of six megawatts for use outside the plant. The CHP plant will be housed in a single building (3130 Square metres) designed with concrete and steel structural framework and covered in metal profiled cladding. This building will house an unloading bay and fuel reception area, a fluidised bed combustion (FBC) system, a boiler system, a turbine/alternator set, a fabric filter system, a service building and an office building. There will be an induced draught (ID) fan and a flue stack for emissions to atmosphere, approximatley 40 metres in height, located outside. The proposed development also provides for two pipe connections within the existing rendering facility and the CHP plant. The new plant facility will be located to the rear (south/west) of the existing industrial plant buildings on site. The proposed process building will be approximatley 96 metres in length, 36 metres in width with a ridge height of 18.4 metres. A separate metal profiled clad enclosure (490 Square metres) will house an air cooled condenser immediately adajacent to the main process building. The condenser structure will be 35 metres in length, 14 metres in width and 15.2 metres in height. The proposed ash landfill will be located in the south- western part of the application site and will be connected to the proposed process buildings by an internal access road measuring approximatley 100 metres in length. The landfill will cater for non hazardous bed ash generated in the combustion process. It will also comprise the following elements: construction of engineered dry storage ash cells. These cells will be constructed and filled one at a time; a landfill runoff water lagoon;a temporary soil desposition area, a separate weighbridge and control office (57 square metres)
College Rd. , Nobber , Co. Meath
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?