The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

221270

CONDITIONAL

Kerry - Kerry County Council

Proposed Development

RETAIN DWELLING HOUSE AS CONSTRUCTED WITHIN REVISED SITE BOUNDARIES

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Dec 2022

  2. Further information requested

    2 Feb 2023

  3. Further information received

    31 Mar 2023

  4. Decision: CONDITIONAL

    26 Apr 2023

  5. Decision due

    27 Apr 2023

  6. Grant issued

    30 May 2023

Application Details

Location
TOMIES EAST , BEAUFORT , KILLARNEY
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kerry County Council
Site Area
0.253 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
5 December 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 April 2023
Grant Date
30 May 2023
Permission Expires
29 May 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

413m
17454CONDITIONAL18 May 2017

RETAIN EXISTING DWELLING HOUSE, GARAGE / GARDEN SHED, SEPTIC TANK, PERCOLATION AREA, ACCESS ROAD AND ALL ASSOCIATED SITE WORKS AS CONSTRUCTED WITHIN REVISED SITE BOUNDARIES

BALLINLOUGH , BEAUFORT , KILLARNEY

413m
201069CONDITIONAL6 Nov 2020

(A) CONSTRUCT SIDE AND REAR EXTENSION TO EXISTING DWELLING HOUSE (B) ELEVATION CHANGES TO EXISTING DWELLING HOUSE (C) CONSTRUCT A DOMESTIC GARAGE (D) DEMOLISH EXISTING FUEL STORAGE SHED AND ALL ASSOCIATED SITE WORKS

BALLINLOUGH , BEAUFORT , KILLARNEY

659m
21711CONDITIONAL28 Jun 2021

DEMOLISH EXISTING SINGLE STOREY DWELLING HOUSE AND DETACHED SINGLE STOREY GARAGE, TO CONSTRUCT A NEW SINGLE STOREY REPLACEMENT DWELLING, NEW PROPOSED WASTEWATER TREATMENT SYSTEM TO REPLACE EXISTING SEPTIC TANK - ASSOCIATED SITE WORKS

TOMIES EAST , BEAUFORT , KILLARNEY

674m
2469CONDITIONAL19 Feb 2024

(A) TO CONSTRUCT A FAMILY FLAT EXTENSION ON TO THE EXISTING DWELLING HOUSE, (B) PLANNING PERMISSION TO CHANGE USE OF THE EXISTING GARAGE TO LIVING ACCOMMODATION AS PART OF THE FAMILY FLAT EXTENSION AND ALL SITE DEVELOPMENT WORKS

TOMIES WEST , BEAUFORT , KILLARNEY

1.2km
21999CONDITIONAL31 Aug 2021

CONSTRUCT (A) NEW DWELLING HOUSE WITH GARAGE (B) CONSTRUCT A NEW WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE SERVICES

DUNLOE UPPER , BEAUFORT , CO KERRY

1.4km
22879REFUSED23 Aug 2022

CONSTRUCT A GLAMPING SITE TO COMPRISE OF 4 NO GLAMPING PODS, RECEPTION BUILDING AND LAUNDRY FACILITIES, ON-SITE EFFLUENT TREATMENT SYSTM WITH PERCOLATION AREA, ACCESS ROAD, AND ALL ANCILLARY SITE SERVICES

DUNLOE UPPER , BEAUFORT , KILLARNEY CO KERRY

1.6km
191140CONDITIONAL8 Nov 2019

INSTALL 23.80 SQ. M. OF SOLAR PV PANELS ONTO ROOF OF EXISTING DOMESTIC SHED INCLUDING ALL ASSOCIATED WORKS

GORTREAGH , FOSSA , KILLARNEY

1.6km
2460988CONDITIONAL17 Dec 2024

The development will consist of a) demolition of the existing bedroom wing of the hotel (comprising of two blocks), the spa / leisure and banqueting wing and connecting circulation space all at the main hotel building and demolition of an existing stable block, b) construction of new hotel accommodation comprising of a five-storey over part basement bedroom wing containing 97 no. guest rooms; a new two-storey (basement/lower ground floor and ground floor) over part undercroft spa / leisure and banqueting wing (including internal and external swimming pools); a single storey over basement link connecting new spa / leisure and banqueting wing to existing reception building; a two-storey over basement circulation / leisure / services area at the rear of the existing reception building, connecting to the new bedroom wing; a new first floor restaurant and kitchen on an existing first floor terrace area of the existing reception building; and local alterations to the existing reception building to facilitate the interface of the new built elements, c) the provision of photovoltaic solar panels on the roof of the existing reception building, d) the placement of communications antennae on the proposed new bedroom wing, e) revisions to an existing fire tender access route, f) landscaping works including localised ground reprofiling, hard and soft landscaping and amenity lighting, g) localised connections and new works to site surface water, wastewater and water supply infrastructure, and h) all associated site development works. All on a site of approx. 5.076ha.

Dunloe Hotel and Gardens , Dunloe Lower Beaufort Killarney , Co. Kerry

1.6km
2660604N/A1 Jul 2026

Retention Permission to retain existing temporary works already carried out, consisting of the removal of a timber fence, removal of flagpoles, erection of a mobile site cabin and installation of a localised hardcore surface and Permission to construct a temporary site entrance on the L4040 Road in the same location consisting of the removal of existing Heras fencing, laying of a new temporary tarmacadam surface locally, and erection of new temporary site hoarding and entrance gate. The combined retained existing works and proposed new works will constitute a temporary entrance to facilitate development previously granted permission under a separate application (Ref. 2460988). The hotel entrance configuration will be reinstated to its original condition upon completion of the permitted hotel development

The Dunloe Hotel & Gardens , Dunloe lower Beaufort , Killarney Co. Kerry

1.6km
17762CONDITIONAL4 Aug 2017

CONSTRUCT A DWELLING HOUSE AND DOMESTIC GARAGE COMPLETE WITH SEPTIC TANK AND PERCOLATION AREA

GORTREAGH , FOSSA , KILLARNEY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?