2212

CONDITIONAL

Galway - Galway City Council

Proposed Development

Permission for development which will consist of change of use of a industrial unit to a industrial unit with ancillary offices and a 2 storey side extension to include 1) Industrial unit with internal carpark for electric car charging facilities for medical personal and medical storage on the ground floor 2) New 1st floor to consist of ancillary offices and storage of medical equipment 3) Alterations to elevations 4) Signage and all ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Feb 2022

  2. Decision: CONDITIONAL

    22 Mar 2022

  3. Decision due

    28 Mar 2022

  4. Grant issued

    26 Apr 2022

Application Details

Location
Ballybane Industrial Estate , Tuam Road , Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway City Council
Site Area
0.04 ha

Timeline

Registration Date
1 February 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
22 March 2022
Grant Date
26 April 2022
Permission Expires
25 April 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

75m
2660020CONDITIONAL29 Jan 2026

Permission for development which consists of: Planning Permission for the retention of alterations and changes to Unit 18, Glenrock Business Park for use as warehousing /storage, distribution, retail of a type and scale appropriate to the area, offices /specialist offices, light industry and all other uses compatible with CI Zoned lands The Alterations and Changes to be retained are as follows: 1) Glazed Front Entrance Porch on South-West Elevation of Unit 18 2) Ground Floor Single Story Extension (Ancillary Office Space) to North-West Elevation of Unit 18 3) Roller Shutter Door and Canopy Roof over loading area to North-East Elevation of Unit 18 4) Signage to South-West Elevation of Unit 18 5) Minor elevational changes to those approved under Pl. Ref: 05/715 6) All ancillary Site Works and Site Services

Unit 18 Glenrock Business Park , Bothar na Mine , Galway

76m
2560191CONDITIONAL30 Jun 2025

Permission for development which consists of: to retain a building as constructed. The works to be retained include the following: • The change of use of part of the ground floor from warehouse to office use, • The provision of a mezzanine floor for office use, • To change the use of the first floor from storage to office use. • Provision of a ventilation grill to the front elevation

Glenrock House , Unit 9 Glenrock Business Park , Bothar na Minne Galway

128m
19217REFUSED25 Jul 2019

Permission for the development which will consists of the amalgamation of unit 3 and 4, change of use from bulky retail/storage use to bulky retail with ancillary comparison / convenience retail use and associated siteworks

North point Business Centre , Tuam Road , Ballybaan Beg

131m
19210CONDITIONAL18 Jul 2019

Planning Permission for the development will consist of the following and all associated site works and services: Basement level: Re- arrangement of existing car parking to include Electric Car Charging Points. Inclusion of Motor bike parking and bicycle parking bays. Ground level: 4 No. Bin stores at ground level. 1 No. Bicycle lift shaft from Ground to Basement and 1 No. Goods/Bicycle lift from Ground to Basement, Level 01 & Level 02. Extension to Existing Office Entrance. Relocation of existing double door to Retail Unit 'A'. RE- arrangement of existing car parking to include Electric Car Charging Points. Erection of flag poles within the landscaped area adjacent the Tuam Road. Level 01: Change of Use from Industrial to Medical Clinic Use (998m2). Change of Use from Wholesale Retail to Specialist Offices (3368.7m2). Additional carparking at the Ballybane estate road side of the building to include Electric Car Charging Points and landscaping. Level 02: Construction of a new floor for Specialist Offices (4378.7m2) Roof Plans: Construction of PV/Solar Panels to the roof plan area. Elevations: Modifications to the glazing on the Northeast, Southeast,Southwest Elevations. Signage to the Southwest & Southeast Elevations. New Fire Escape doors off Stairwells to Southwest & Northeast elevations

Northpoint , Tuam Road , Ballybaan Beg

143m
2117REFUSED29 Jan 2021

Permission for development which will consist of (i) 1 Nr. Monument Type Sign 0.9m wide x 4.5m high to the west of the existing entrance. (ii) 1 Nr. Directional Monument Type Sign 0.76m wide x 1.2m high to the east of the existing entrance

Ballybaan Beg Townland , Ballybane Industrial Estate , Tuam Road Galway

144m
18419CONDITIONAL19 Dec 2018

Permission for (i) The demolition of parts of the existing warehouse building 'Building No. 38' Ballybane Industrial Estate (located between the North Point Development and the junction of the Tuam Road and Bóthar Na Mine) (ii) And the associated changes caused by the above alterations to the new elevational treatment previously granted under PD16/126 consisting of the provision of new cladding and glazing arrangements roller doors and signage (iii) The construction of a single storey commercial unit consisting of office space, kitchen, toilets, storage & circulation spaces to the South West of the retained building with connections to services and all other associated site works and services. (iv) The construction of 2Nr.Wash pads with associated canopies with connections to services. (v) The installation of building signage and totems, together with all connections to services and all other ancillary site works

Ballybaan Beg Townland , Ballybane Industrial Estate , Tuam Road

147m
19161CONDITIONAL10 Jun 2019

Planning permission for: (i) The demolition of parts of the existing warehouse building "Building No. 38" ( located between the North Point Development and the junction of the Tuam road and Bothar Na Mine) in addition to demolition granted under PD18/419, (ii) and the associated changes caused by above alterations to the new elevational treatment previously granted under PD18/419, consisting of, the provision of new cladding and glazing arrangements, roller doors and signage and additional cladding and elevational changes to parts of southeast and southwest elevations (iii) The construction of a single storey commercial unit consisting of office space, kitchen, toilets, storage and circulation spaces to the south west of the retained building with connections to services and all other associated site works and services

Ballabaan Beg Townland , Ballybane Industrial Estate , Tuam Road

158m
19288CONDITIONAL22 Oct 2019

Permission for Development which will consist of a change of use of the property to a warehouse with ancillary trade counters (for the sale of building related products principally to trade): external changes including the conversion of the current staff entrance to a goods in entrance and construction of a service ramp: conversion of the current, roller shuttered, delivery entrance to an access servicing the trade counters, marking out parking and delivery area and any other ancillary works to facilitate the development

Ballybane Industrial Estate , Bothar na Mine , Galway

166m
18347CONDITIONAL2 Nov 2018

Permission for the erection of a warehouse building and the erection of a link structure between the proposed warehouse building and an existing retail building. The proposed development also includes for the erection of a link structure between 2 no. existing warehouse buildings all

Bóthar na Mine , Ballybaan Beg , Galway

186m
18338CONDITIONAL26 Oct 2018

Permission for a 10 year planning permission for development. The proposed development comprises 3 no, office blocks and a café (c. 17,433sq. m GFA including basement and plant rooms) as follows: Block 1 (c. 10,225 sq. m) is an 8-storey office building providing offices, stair and lift cores and plant rooms. Block 2 (c. 4,081 sq. m) is a 6-storey office building over basement comprising stair and lift cores and plant rooms. Block 3 (c. 2,995 sq. m) is a 5-storey office building over basement comprising stair and lift cores and plant rooms. The Café (c. 77sq. m) is a single storey building which incorporates a seating area, storage area and toilets. The development includes a surface car parking accommodating 421 no car spaces and 120 no. cycle spaces. Vehicular access is provided from Bóthar Na Mine and the city East Ballybrit Business Park Road incorporating anew internal access road. The proposed development includes for the provision of 2 no. ESB substations and also includes for the full and partial demolition of existing buildings and structures on the site (c.2,614 sq.m), as well as all associated site development works, boundary treatments, landscaping and connection to existing services

City East , Ballybrit Business Park Road , Ballybaan Beg