The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

221403

N/A

Meath - Meath County Council

Proposed Development

the indefinite retention of a waste water treatment system and percolation area and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Rowallen , Portmanna Clonee , Co Meath D15 F5KN
Applicant
N/A
Application Type
RETENTION
Planning Authority
Meath County Council
Site Area
0.228 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
28 October 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

27m
RA190688CONDITIONAL31 May 2019

of the indefinite retention of a single storey, double-pitched roof garage and single storey, mono-pitched roof shed and all associated site works

Rowallen Portmanna , Clonee Co Meath , D15F5KN

75m
RA191651CONDITIONAL5 Dec 2019

the retention permission sought relates to a Proprietary Effluent Treatment System, Designed Percolation Area, part converted garage to accommodate a home office/music room

Portmanna (Part Of) , Clonee , Co. Meath

212m
221606CONDITIONAL8 Dec 2022

a two storey dwelling, detached domestic garage, entrance and driveway. The development also includes installation of proprietary waste water treatment system and polishing filter together with all associated site works

Normans Grove , Clonee , Co Meath

285m
RA171082CONDITIONAL15 Sept 2017

two storey dwelling, domestic garage, internal entrance off existing entrance and driveway previously granted permission under planning reference no DA/110798. The development also includes the installation of a proprietary waste water treatment system and polishing filter, internal access to agricultural lands and all associated site works. Significant further information/revised plans submitted on this application

Stokestown , Clonee , Co meath

301m
RA190958REFUSED19 Jul 2019

to construct proposed single storey private residence and detached domestic garage, install proposed wastewater treatment system and percolation area, construct new entrance onto main road, including all ancillary site works

Stokestown , Clonee , Co. Meath

321m
2561235N/A17 Nov 2025

the development will consist of recessing and reconstructing the existing timber vehicular entrance in stone with metal gates to the front of the property along with all site works

The Paddocks , Stokestown , Clonee

334m
2561296CONDITIONAL1 Dec 2025

the development will consist of recessing and reconstructing the existing timber vehicular entrance in stone with metal gates to the front of the property along with all site works

The Paddocks , Stokestown , Clonee

396m
RA202078REFUSED23 Dec 2020

development will consist of a two storey dwelling, detached domestic garage, entrance and driveway. The development also includes installation of proprietary Waste Water treatment system and polishing filter together with all associated site works

Normansgrove , Clonee , Co. Meath

439m
23699CONDITIONAL11 Jul 2023

to construct a part storey and a half, part single storey dwelling house, detached garage, new wastewater treatment system and percolation area and all associated site development works. Significant further information/revised plans submitted on this application

Stokestown , Dunboyne , Co Meath

506m
RA190341CONDITIONAL27 Mar 2019

the demolition of existing single storey dwelling and out houses, the construction of a storey and a half style replacement dwelling, a detached domestic garage, the decommissioning of existing septic tank and the relocation and upgrade to a proposed proprietary domestic effluent treatment system, upgrade of existing site entrance and all associated site works

Kinoristown , Clonee , Co. Meath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?