22149

CONDITIONAL

Carlow - Carlow County Council

Proposed Development

for proposed works to include a solar and storage park on an area of approximately 68.8 hectares, comprising linear arrays of solar photovoltaic panels mounted on steel supported structures with associated cabling and ducting (including cable connection to the proposed onsite 110 kV tail fed substation), 50 inverter substations, a storage park (including 30 no. containers with battery cells, transformers and power conversion units), perimeter fencing, 8 no. palisade double security gates, 3 no. temporary construction compound/material storage areas, 6 no. steel storage containers, 17 no. turning bays, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed development to have planning permission that is effective for 10 years (and an operational period of 40 years). A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning Authority with the Planning Application.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 May 2022

  2. Further information requested

    29 Jun 2022

  3. Further information received

    22 Mar 2023

  4. Decision due

    18 Apr 2023

  5. Decision: CONDITIONAL

    18 Apr 2023

  6. Grant issued

    19 May 2023

Application Details

Location
Townlands of Ardenhue & Friarstown , Co. Carlow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council

Timeline

Registration Date
6 May 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 April 2023
Grant Date
19 May 2023
Permission Expires
18 May 2033

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
22131N/A14 Apr 2022

for proposed works to include a solar and storate park on a an area of approximately 68.8 hectares, comprising linear arrays of solar photovoltaic panels mounted on steel supported sturctures with associated cabling and ducting (including cable connection to the proposed onsite 110 kV tail fed substation), 50 inverter substations, storage park (including 30 no. containers with battery cells, transformers and power conversion units), perimeter fencing, 8 no. palisade double security gates, 3 no. temporary construction compound/ material storage areas, 6 no. steel storage containers, 17 no. turning bays, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed development to have planning permission that is effective for 10 years (and an operational period of 40 years). A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the planning application.

Ardnehue and Friarstown , Co. Carlow

332m
1946CONDITIONAL12 Feb 2019

for proposed works which will include a solar farm on an area of approximately 27.0 hectares, comprising photovoltaic panels on ground mounted frames, 1 No., onsite 38kV substation, an energy storage system (4 No. units), 10 No. single storey inverter/transformer stations, security fencing, a palisade double security gate, 2 No. storage containers, CCTV, a temporary construction stage wheelwash system and all ancillary development works. Elgin Energy Services Ltd are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operational period of 35 years). The planning application incudes a Natura Impact Statement

Friarstown , Killerig , Co. Carlow

427m
2116N/A26 Jan 2021

Permission for a development to include a solar farm on an area of approximately 17.6 hectares, comprising photovoltaic panels on ground mounted frames, 1 no. onsite 38kV substation, 10. no single storey inverter/transformer stations, security fencing, a palisade double security gate, 2 no. storage containers, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operational period of 40 years). The planning application is accompanied with a Natura Impact Statement.

Ardnehue and Friarstown ,

427m
2138CONDITIONAL12 Feb 2021

Permission for a development to include a solar farm on an area of approximately 17.6 hectares, comprising photovoltaic panels on ground mounted frames, 1 no. onsite 38kV substation, 10 no. single storey inverter/transformer stations, security fencing, a palisade double security gate, 2 no. storage containers, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed solar farm to have planning permission that is effective for 10 years (an an operational period of 40 years). A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the planning application

Ardnehue , and Friarstown , County Carlow

733m
23134REFUSED10 Aug 2023

to construct a part single storey, part two storey dwelling, detached single storey double garage, new entrance off existing laneway, bored well, waste water treatment system, percolation area and all associated site works

Friarstown , Co. Carlow

794m
18206N/A22 May 2018

the construction of a Pig Finishing Unit, Two Meal Bins, Two Water Tanks, Roof Mounted Solar Panels and all associated works

Grangeford , Tullow , Co. Carlow

794m
18164N/A30 Apr 2018

Construction of a Pig Finishing Unit, two meal bins, two water tanks, roof mounted solar panels and all associated site works

Grangeford , Tullow , Co. Carlow

832m
2123REFUSED29 Jan 2021

10 Year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area will be ca. 65.6 ha, the construction of a 38kV substation (ca 114.4m2 x 4.75 tall) a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2), along with ancillary development including; 24 no. Power Hubs (ca. 15.25m2 x 2.4m) which incorporate an inverter and a transformer, 1 no. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9m), 1 no. single storey equipment storage building (7.5m2 x 2.7m), 10 no. CCTV cameras mounted on 4m high poles, perimeter security fencing, site access, site egress and all ancillary works. Permission currently exists for a PV development on part of the site (Planning Permission Ref No. 16325). An Natura Impact Statement will accompany the planning application.

Grangeford Old , and Friarstown , Co. Carlow

868m
20360CONDITIONAL15 Oct 2020

permission to retain conservatory as constructed to the side of existing dwelling house, all ancillary site works and services.

Friarstown , Bennekerry , Carlow

919m
2460191REFUSED5 Jul 2024

to construct a two storey dwelling, detached single storey double garage, upgrading of existing entrance, bored well, waste water treatment system, percolation area and all associated site works

Friarstown , Co. Carlow