22151

CONDITIONAL

Sligo - Sligo County Council

Proposed Development

development consisting of a proposed two storey office building (gross floor area of 1774.4 m2), adjacent bike shelter (10.5 m2) and a car park comprising 224 parking spaces and all other associated site ancillary and infrastructure works including carpark lighting

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 May 2022

  2. Further information requested

    24 Jun 2022

  3. Further information received

    16 Nov 2022

  4. Decision: CONDITIONAL

    12 Dec 2022

  5. Decision due

    13 Dec 2022

  6. Grant issued

    24 Jan 2023

Application Details

Location
Finisklin Business Park , Finisklin , Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
1.52 ha

Timeline

Registration Date
4 May 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 December 2022
Grant Date
24 January 2023
Permission Expires
23 January 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

107m
2360155CONDITIONAL27 Jun 2023

alterations and extensions to the existing an post Sligo Delivery Service Unit building to include for a new single storey temporary structure (10m x 30m x 5.5m tall) and temporary connecting link corridor (5m x 5m. x 5.5m tall) both located to the rear (northern) elevation of the existing building. The proposed temporary building would be in place for a period of between 7 to 10 years and consists of a hard shell marquee type structure with a double skinned pvc material, fully tensioned roof and all associated site development works

An Post Sligo Delivery Service Unit , Finisklin Business Park Finisklin Sligo , County Sligo

148m
2182CONDITIONAL12 Mar 2021

development consisting of the demolition of an existing external waste water compound with an area of 43.35m2, a proposed waste compound with an area of 45.92m2, and a bicycle shelter with an area of 49.68m2, to construct a new 1-storey extension on the North elevation of the main building, consisting of gross ground floor manufacturing area of 208.00m2

Finisklin Business Park , Finisklin , Sligo

177m
21364CONDITIONAL10 Sept 2021

development consisting of the proposed building extension comprising of an additional 267.08m2 of manufacturing space, the demolition of an existing substation and construction of a new relocated substation with an area of 22.49m2 including all other associated site ancillary works

Finisklin , Business Park , Sligo

198m
2460293CONDITIONAL10 Sept 2024

development, located to the northeast of the existing facility, will consist of a new ESB substation and switch room to serve the existing facility. The substation measures 45.7m2 in plan area and 3.5m in height. The switchroom and a back up generator will be located on a raised gantry that will measure 121m2 and 7m in height and be situated 3.5m above ground level

Finisklin Business Park , , Co Sligo.

199m
21495CONDITIONAL15 Dec 2021

development consisting of an extension and alterations to existing factory to provide a warehouse and store. Floor area of proposed extensions: 466sqm. Permission is sought for associated site works at Good4U factory premises

Finisklin Business Park , Finisklin , Sligo

225m
17221CONDITIONAL8 Jun 2017

(1) revision of existing site boundary with an overall increase in site area of 0.48HA to that granted under PL 15/267 (2) construction of an extension to the existing production area (to provide warehouse storage to ground floor only) & office areas on ground and first floor (3) construction of a ground floor canteen to include storage, prep & wash areas with an external waste storage area (single storey) to proposed western gable (4) construction of a fire sprinkler storage tank & intergrated pump house, electrical switch room, electrical meter room to serve the existing & proposed facility (5) construction of an additional car park area adjacent to the northern boundary (6) provision of external mechanical & electrical plant equipment to the northern & western elevations of the proposed extension to facilitate site services (7) provision of a second site entrance to loading docks/warehouse area with access from the western site boundary (8) carrying out of all associated site development works deemed necessary as part of the works

Finisklin Business & Technology Park , Finisklin , Sligo

227m
18100CONDITIONAL3 Apr 2018

Development consisting of 1. Revision of the western site boundary to that previously granted under PL17/221 with an overall increase in site area of 0.53HA 2. Erection of a prefabricated solvent storage shed adjacent to the northern site boundary 3. construction of 2Nr concrete bases and 2Nr waste compactor units to the western elevation of the new extension under construction 4. Carrying out all associated site development works deemed necessary as part of these works

Finisklin Business & Technology Park , Finisklin , Sligo

227m
2560153CONDITIONAL16 Apr 2025

To construct a 119.4sqm single storey extension to the northern elevation of existing structure to accommodate a new tool-room. To retain the construction of a pallet storage building which consists of a single storey steel shed type structure sited along the northern site boundary. All associated site development works deemed necessary.

Carbury Point , Finisklin Industrial Estate , Finisklin Sligo

246m
21473CONDITIONAL2 Dec 2021

PP - development consisting of change of use from warehouse to offices and clean room, floor area 1,080 sq.m. in existing factory. The development will include alterations to the north elevation to provide glazing

Finisklin Business Park , Finisklin , Sligo

248m
17271CONDITIONAL17 Jul 2017

development consisting of (a) provision of new ground floor offices, meeting rooms, clean rooms, washroom facilities, laboratory and warehouse accommodation. (b) Making of alterations to existing elevations, including change of external panel design to all elevations, new glazing design to East and North elevations, addition of two additional dock levelers, loading bay doors and pedestrian entrance doors to West elevation (c) Demolition of existing internal office space which includes ground and first floor accommodation to provide new accommodation. (d) Erection of a new site boundary fence to perimeter of site. (e) Provision of additional car parking spaces to existing car parking area, together with all ancillary site works and services

Finisklin Business and Technology Park , Finisklin , Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?