The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

22156

N/A

Sligo - Sligo County Council

Proposed Development

development consisting of (1) Construct a single story extension to the rear, (2) addition of a second story to the midsection of the dwelling, (3) changes to the front and rear elevations and to (4) retain a chimney and conservatory. Previous Planning Reference Number PL 18972 refers.

View the full application file on the council's planning portal →

Application Details

Location
Lisheen , Aclare , Co. Sligo
Applicant
N/A
Application Type
RETENTION
Planning Authority
Sligo County Council
Site Area
1.047 ha
Floor Area
116 sq m
Residential Units
2

Timeline

Registration Date
6 May 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22182CONDITIONAL23 May 2022

development consisting of (1) construct a single storey extension to the rear, (2) addition of a second story to the midsection of the dwelling, (3) changes to the front and rear elevations and to (4) retain a chimney and conservatory. Previous planning reference number PL 18972 refers.

Kilmacteige , Aclare , Co. Sligo

759m
2560373CONDITIONAL8 Sept 2025

to extend and refurbish the existing McGuinness Townhouse No. 1, by adding an 8 sq.m extension to the rear and incorporating the existing side alley into the development, together with all associated site works

Aclare , Co. Sligo

1.0km
23106N/A15 Dec 2023

development consisting of the following: change of use to a residential dwelling, to include a small extension to the rear of the property with a floor area of 2.48 sq.m.

Garda Station , Lislea , Aclare

1.3km
21121CONDITIONAL8 Apr 2021

development consisting of the removal of an existing telecommunications pole and replacement with a new 30 metres monopole carrying antennas, a relocated dish, associated equipment, ground based equipment cabinets and all associated site development works

Eir Exchange The High Road , Carns , Aclare

1.3km
2430CONDITIONAL24 Jul 2024

change of house design from that previously granted planning permission under planning reference PL22/205 with all associated site works

Carns , Aclare , Co. Sligo

1.3km
2265N/A21 Feb 2022

Development consisting of the construction of a new dwelling house complete with access onto public road, domestic garage, on-site sewage treatment system, associated percolation area, hard and soft landscaping all other associated site works

Carns , Aclare , Co Sligo

1.3km
22205CONDITIONAL13 Jun 2022

development consisting of the construction of a new dwelling house complete with access onto public road, domestic garage, on-site sewage treatment system associated percolation area, hard and soft landscaping and all other associated site works

Carns , Aclare , Co. Sligo

1.4km
19196CONDITIONAL23 May 2019

for development consisting of the construction of a roundhouse cattle shed, effluent storage tank and silage slab with walls together with all ancilalry site works and services

Lislea , Aclare , Co. Sligo

1.4km
21387N/A24 Sept 2021

Development consisting of the proposed erection of an On-Farm Horticulture Building (consisting of Production Area, Cold Storage Area, Storage and Preparation Area, Laboratory, Kitchen Servery and farm office/meeting room), 2. No. Water Storage tanks and Underground Drainage System, Ancillary Site Works, Additional Landscaping and New Boundary Fencing

Lislea , Aclare , Ballymote

1.4km
2211CONDITIONAL14 Jan 2022

Development consisting of the proposed erection of an On-Farm Horticulture Building (consisting of Production Area, Cold Storage Area, Storage and Preparation Area, Laboratory, Kitchen Servery and farm Office/meeting room), 2 No. Water Storage tanks and Underground drainage system, ancillary site works, additional Landscaping and new boundary fencing. This planning application is accompanied by a Natura Impact Statement (NIS).

Lislea , Aclare , Ballymote

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?