The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

22224

N/A

Kilkenny - Kilkenny County Council

Proposed Development

is sought for the indefinite retention of material change of use of an outbuilding to an extension to existing dwelling along with all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Kilmanahin , Piltown , Co Kilkenny
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kilkenny County Council

Timeline

Registration Date
8 April 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22252N/A19 Apr 2022

for the indefinite retention of material change of use of an outbuilding to an extension to existing dwelling along with all associated site works

Kilmanahin , Piltown , Co Kilkenny

0m
2560047CONDITIONAL6 Feb 2025

1. Retention Planning permission for the material change of use of an outbuilding to an extension to existing dwelling 2. Full Planning permission to upgrade existing wastewater system to current EPA guidelines and all other associated works

KILMANAHIN , PILTOWN , CO. KILKENNY

340m
19125CONDITIONAL5 Mar 2019

for single storey dwelling and garage, wastewater treatment system, new entrance and associated site works

Kilmanahin , Piltown , Co. Kilkenny

602m
18246CONDITIONAL18 Apr 2018

to retain indefinitely the existing link corridor between my house and garage and all associated works at

Kilmanahin , Piltown , Co Kilkenny.

775m
19867CONDITIONAL21 Nov 2019

to retain indefinitely, design changes to existing agricultural buildings, changes to site layout including position of buildings, and all associated site works

Kilmanahin , Piltown , Co Kilkenny

850m
20778REFUSED13 Nov 2020

to construct a storey and a half dormer dwelling with on-site sewerage treatment and all associated works

Kilmanahin , Piltown , Co. Kilkenny

879m
19936CONDITIONAL17 Dec 2019

for development. The development will consist of (i) a new treated water storage tank, (ii) extension of the existing vehicle access track, (iii) ancillary development works and (iv) associated temporary development works, including a temporary compound area for the construction period

Jamestown , Templeorum , Piltown

891m
2560594CONDITIONAL15 Sept 2025

for (i) A new above-ground, treated water service tank with a usable storage capacity of 722 M3 with an overall height of 6.4m (5.3m without safety railings) including: a) Concrete tank; b) Duel compartment; c) Connection pipework; d) Scour and overflow pipework; e) Dechlorination chamber; f) Handrailing and access staircase; (ii) Ancillary works, including: (a) Associated ground works; (b) Vehicle access track, security gate, footpaths, and vehicle turning Below-ground dechlorination chamber; (c) Mechanical and electrical service connections; (d) Modifications to the existing electrical control system to support new works; (e) Extension to the existing high fence around the existing storage site, to incorporate the expanded site; (iii) Solar PV panels to area; to be mounted on the new service reservoir roof slab (static and south-west facing); (iv) Associated temporary works including temporary compound area for the construction period; (v) Associated works including landscaping and biodiversity net gain. There are no demolition works proposed as part of this Project. In addition, a Landscaping and Biodiversity Net Gain (BNG) Plan has been prepared as part of the proposed development. Refer to Volume 2, Drawing No. 20788-NOD-04-XX-DR-C08015 for a copy of the Landscape Plan. Planting shall commence in the first planting season following commencement of development on the site

Jamestown Treated Water Storage , Oldcourt and Jamestown , Co. Kilkenny

1.0km
2560735CONDITIONAL18 Nov 2025

to construct a dormer dwelling with on-site sewerage treatment, new entrance onto the public road and all associated works

Brenar , Piltown , Co.Kilkenny

1.1km
21877CONDITIONAL26 Oct 2021

to construct a 1 and 1/2 storey dwelling, garage, entrance, wastewater system, connection to mains water, soakpits and all other associated site works at

Brenor , Piltown , Co. Kilkenny

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?