22228
N/ACavan - Cavan County Council
Proposed Development
to convert & extend existing garage to separate dwelling unit and RETENTION of site boundaries & location of entrance and all associated site works
View the full application file on the council's planning portal →Application Details
- Location
- Lear , Bailieborough , Co Cavan
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cavan County Council
- Site Area
- 0.35 ha
- Floor Area
- 80 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 7 June 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to retain site boundaries, location of entrance and garage as constructed and PERMISSION to extend & convert garage into granny/family flat and all associated site works
Lear , Bailieborough , Co Cavan
for retention of 1) revised location on site, 2) revised site boundaries and entrance details, 3) Conversion of attached garage to living accommodation, 4) revised first floor layout including additional floor area, 5) external elevational changes including minor internal alterations, 6) retention of timber storage shed, and 7) all ancillary site development works
No 1 Lear , Bailieborough , Co Cavan
to retain alterations to existing domestic garage previously granted under Planning Reference 05/1386, and all ancillary site development works
Lear , Bailieborough , Co. Cavan
for development consisting of 1) RETENTION of the partial construction of a single storey dwelling house and 2) PERMISSION for proposed completion of the construction of the dwelling house, provision of a wastewater treatment system and percolation area, use of existing entrance from public road and provision of access lane together with all ancillary site development works Significant further information and revised plans have been submitted.
Lear , Bailieborough , Co. Cavan
for new domestic garage, RETENTION of the existing domestic store and all ancillary site development works
Lear , Bailieborough , Co. Cavan
for a single storey dwelling house, wastewater treatment system and percolation area, vehicular entrance and driveway, entrance piers together with all ancillary site development works
Lisaball , Bailieborough , Co. Cavan
to retain timber clad single story dwelling, site development works and connect to existing services
Lisball , Bailieborough , Co Cavan
of timber clad single storey dwelling, site development works and connect to existing services
Lisball , Bailieborough , Co Cavan
to construct 1 no. Poultry house (to include meal storage bin(s) and soiled water tank(s)) and all associated site works (to include new/upgraded site entrance) arising from the above proposed development
Lisgar and Corglass , Bailieboro , Co Cavan
for (1) New milk intake extension, clean in process station, pipe bridge, installation of 5 No additional milk silos, and 1 No. silo for water reuse (2) the construction of a new internal road, (3) works to the public road involving widening of the Knockbride Road (L3515), (4) relocation of contractor containers and storage units on site, (5) relocation of existing site entrance to include traffic control entrance barriers & gates, (6) new staff, tanker and contractor parking areas including EV Charging points (7) new weighbridge, (8) boundary, landscape treatments and all ancillary works, (9) demolition of part of existing milk intake building, (10) new pedestrian crossing on the Knockbride Road (L3515), (11) new drainage and construction of underground attenuation drainage system (12) new upgraded Class 1 oil water separator (13) Rainwater Harvesting tank (14) new electrical switch room and admin office. The site currently operates under EPA License (Reg no. P0406-05.).
Lear , Bailieborough , Co Cavan
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?