22230

N/A

Kilkenny - Kilkenny County Council

Proposed Development

for development at this site. The development will consist of: 1) replacing concrete roof tiles with slate, 2) an additional ensuite added to the existing master bedroom and 3) a family flat extension and all other associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Apr 2022

  2. Further information requested

    31 May 2022

  3. Application withdrawn

    14 Dec 2022

Application Details

Location
Loon , Castlecomer , Co Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.202 ha

Timeline

Registration Date
11 April 2022
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
14 December 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

208m
2460299CONDITIONAL25 Jun 2024

permission for (a) domestic shed to rear of site as constructed, (b) Extension to rear of existing permitted shed (permitted under P08/647), (c) changed to elevations of permitted dwelling including conversion of attic space to domestic storage and roof lights to the rear elevation, (d) change of roof type to existing permitted domestic garage ( permitted under P05/833) and all associated site works

Loan , Castlecomer , County Kilkenny

269m
2560435N/A18 Jul 2025

to retain attic conversion, internal changes and external changes to front, rear and side elevations and all associated site development works

Loan , Castlecomer , Co. Kilkenny

418m
22612CONDITIONAL15 Sept 2022

to construct a storey and a half dwelling house, detached garage, wastewater treatment system and polishing filter, new vehicular entrance which will be shared with entrances approved under 16/276 and 20/511, landscaping and all associated site works

Loan , Castlecomer , Co. Kilkenny

481m
22611CONDITIONAL15 Sept 2022

of constructed dwelling, comprising the modification of approved planning reference 20/511, to include retention of as-built dwelling, detached garage and wastewater treatment system and polishing filter in revised location and all associated site works

Loan , Castlecomer , Co. Kilkenny

481m
20511CONDITIONAL7 Aug 2020

to construct a two storey dwelling house, detached garage, wastewater treatment system, percolation area, new vehicular entrance which will be shared with entrance approved under 16/276, landscaping and all associated siteworks.

Loan , Castlecomer , Co. Kilkenny

606m
2079N/A13 Feb 2020

for ten-year permission for development. The development will consist of the provision of a temporary prefabricated welfare unit on the site of Loon Water Treatment Plant, including associated site works

Loon Water Treatment Plant , Loan , Co Kilkenny

606m
20159CONDITIONAL13 Mar 2020

for ten-year permission for development. The development will consist of the provision of a temporary prefabricated welfare unit on the site of Loon Water Treatment Plant, including associated site works

Loon Water Treatment Plant , Loan , Co Kilkenny

768m
23135REFUSED30 May 2023

of Planning Permission Reference P17/865

Loon , Castlecomer , Co Kilkenny

768m
17865CONDITIONAL22 Dec 2017

to demolish existing dwelling house leaving the utility room portion intact and decommissioning existing septic tank and constructing a replacement two storey dwelling house incorporating the existing utility room, installing a proprietary wastewater treatment system and raised sand polishing filter and all necessary and associated site works

Loon , Castlecomer , Co. Kilkenny

856m
2660292N/A15 May 2026

for construction of a Single Wind Turbine development on a 5.98-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 150 metres, comprising a rotor diameter of 138m and a hub height 81m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrading and repositioning of existing farm entrance; V. Upgrading and widening of existing access track; VI. New access track; VII. An on-site 20kV electrical substation building; VIII. Electrical and communication cabling within private lands; IX. Underground 20kV grid connection within private lands and within the L5851 and the R426 public roads connecting to the existing ESB Castlecomer 38kV Substation; X. Hedge and tree removal, landscaping and reinstatement works; and XI. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. This Planning Application is accompanied by a Natura Impact Statement (NIS). This Planning Application is not subject to an Environmental Impact Assessment Report (EIAR). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Loan , Co. Kilkenny , Ireland

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?