22255

CONDITIONAL

Roscommon - Roscommon County Council

Proposed Development

Permission for construction of a dwelling house, connections to services, access onto the public road and associated site development works at

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 May 2022

  2. Further information requested

    21 Jul 2022

  3. Further information received

    21 Oct 2022

  4. Decision due

    17 Nov 2022

  5. Decision: CONDITIONAL

    17 Nov 2022

  6. Grant issued

    3 Jan 2023

Application Details

Location
Deerpark Td. , Boyle , Co. Roscommon
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Roscommon County Council
Site Area
0.405 ha
Floor Area
217.95 sq m
Residential Units
1

Timeline

Registration Date
27 May 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 November 2022
Grant Date
3 January 2023
Permission Expires
2 January 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560252CONDITIONAL27 May 2025

Permission for Change of House Design from that previously permitted under Grant of Planning PD/22/255 with associated site development works at

Deerpark Td. , Boyle , Co. Roscommon.

1m
2560489CONDITIONAL17 Oct 2025

Permission for change of house design from that previously permitted under Grant of Planning PD/22/255 with associated site development works at

Deerpark Td. , Boyle , Co. Roscommon.

3m
21305N/A4 Jun 2021

permission for construction of a dwelling house, connection to services, access onto the public road and associated site development works at

Deerpark Townland , Boyle , Co Roscommon

204m
21459CONDITIONAL12 Aug 2021

Permission to: 1. Construct an extension to side of existing dwelling house; Retention Permission to: 2. Retain changes to elevations of existing dwelling house and all ancillary site development at

Deerpark , Boyle , Co. Roscommon

235m
17167CONDITIONAL19 Apr 2017

the development will consist of 1) the proposed construction of new single storey extensions to the south east & south west facades of the existing single storey detached dwelling house & associated remodelling of facades 2) change of use of existing attached Garage to use as part of the house 3) connection to the existing public sewer and 4) associated site works & services at

Deerpark , Boyle , Co. Roscommon

275m
20569CONDITIONAL21 Dec 2020

for the construction of a dwelling-house with septic tank and percolation area, together with all ancillary site works and services at

Tawnytaskin Td. , Boyle , Co. Roscommon

1.1km
17484CONDITIONAL1 Dec 2017

Planning permission to demolish the existing dwelling house, decommission the existing septic tank and construct a replacement two storey, four bedroom dwelling house with new wastewater treatment system, upgraded site entrance and associated site development works at

Doon Townland , Rock of Doon , Boyle

1.1km
21304CONDITIONAL4 Jun 2021

Retention Permission for: (a) as constructed dwelling house which is at variance to the dwelling house permitted under grant of planning PD/17/484, (b) amended site boundary and (c) domestic shed with associated site development works at

Doon Townland , Rock of Doon , Boyle

1.2km
22125CONDITIONAL7 Mar 2022

Permission for the construction of a storey and a half extension to the south side of the existing storey and a half dwelling, alteration of the existing door opening on the rear (west) elevation of the dwelling and ancillary site works at

1 Cois Cuan , Boyle , Co. Roscommon

1.2km
2560115REFUSED21 Mar 2025

Permission for development which will consist of decommission existing septic tank and percolation area serving existing dwelling house and replace with a new wastewater treatment system and tertiary polishing filter and all ancillary site works at

Deerpark Td. , Boyle , Co. Roscommon.