22294

N/A

Carlow - Carlow County Council

Proposed Development

the erection of five wind turbines with turbine blade diameter of 117m and overall height to tip of 136.5m. One permanent meteorological mast, access road and internal tracks, electricity substation, temporary construction compound, turbine laydown area, control building, 1 borrow pit, crane hardstanding, underground cabling, up to approximately 18 hectares of forestry felling and all associated site works, with an operational lifetime of 30 years. The application is accompanied by a Planning Report, Environmental Impact Assessment and Natura Impact Statement

View the full application file on the council's planning portal →

Application Details

Location
Bilboa Wind Farm , Townland of Boolyvannanan & Coolnakisha , Bilboa
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council

Timeline

Registration Date
9 September 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

213m
2010N/A20 Jan 2020

for alterations to previously permitted wind farm development (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL01.240245). The proposed alteration will consist of increasing the maximum turbine blade diameter of the permitted turbines from 93m up to a maximum of 120m, while maintaining the overall tip height of the permitted development. The application is accompanied by a Planning Report, Environmental Impact Assessment Screening Report, Appropriate Assessment Screening Report and Environmental Considerations Report.

Bilboa Wind Farm , Boolyvannanan & Coolnakisha , Bilboa

213m
215N/A13 Jan 2021

Permission for development consisting of alterations to a previously permitted wind farm development (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245) The proposed alteration will consist of increasing the maximum turbine blade diameter of the permitted turbines from 93m up to a maximum of 120m, while maintaining the overall tip height of the permitted development; increasing the size of crane hardstanding area at 4 turbines to 30m x 62.5m; felling of up to an additional 6.3 hectares of onsite forestry to accommodate the proposed increased turbine blade diameter in addition to the permitted felling; and an extension of the operational lifetime of the permitted wind farm development from 25 years up to 30 years. The application is accompanied by a Planning Report, Environmental Impact Assessment and Natura Impact Statement.

Bilboa Wind Farm , Land at Boolyvannanan & Coolnakisha , Bilboa

213m
2036N/A10 Feb 2020

The development will consist of alterations to a previously permitted wind farm development (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL01.240245). The proposed alteration will consist of increasing the maximum turbine blade diameter of the permitted turbines from 93m up to a maximum of 120m, while maintaining the overall tip height of the permitted development. The application is accompanied by a Planning Report, Environmental Impact Assessment Screening Report, Appropriate Assessment Screening Report and Environmental Considerations Report.

Bilboa Wind Farm , Land at Boolyvannanan & Coolnakisha , Bilboa

213m
19496N/A20 Dec 2019

Permission for alterations to a previously permitted wind farm development (Planning Register References: Carlow County Council 11/154; an Bord Pleanala PL01.240245). The proposed alterations will consist of increasing the maximum turbine blade diameter of the permitted turbines from 93m up to a maximum of 120m, while maintaining the overall tip height of the permitted development.

Bilboa Wind Farm , Boolyvannanan & Coolnakisha , Bilboa

220m
2115CONDITIONAL26 Jan 2021

Permission for development consisting of alterations to a previously permitted wind farm development (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245) The proposed alteration will consist of increasing the maximum turbine blade diameter of the permitted turbines from 93m up to a maximum of 120m, while maintaining the overall tip height of the permitted development; increasing the size of crane hardstanding area at 4 turbines to 30m x 62.5m; felling of up to an additional 6.3 hectares of onsite forestry to accommodate the proposed increased turbine blade diameter in addition to the permitted felling; and an extension of the operational lifetime of the permitted wind farm development from 25 years to 30 years. The application is accompanied by a Planning Report, Environmental Impact Assessment Report and Natura Impact Statement.

Boolyvannanan , Coolnakisha , Bilboa

523m
22340CONDITIONAL7 Oct 2022

development will consist of the erection of five wind turbines with turbine blade diameter of 117m and overall height to tip of 136.5m. one permanent meteorlogical mast, access road and internal tracks, electricity sub-station, temporary construction compound, turbine laydown area, control building, 1 borrow pit, crane hardstanding, underground cabling, up to approximately 18 hectares of forestry felling and all associated site works, with an operation lifetime of 30 years. The application is accompanied by a Planning Report, Environmental Impact Assessment, and Natura Impact Statement.

Bilboa Wind Farm , Land at Boolyvannanan & Coolnakisha , Bilboa

809m
20180CONDITIONAL11 Jun 2020

for the installation of approximately 4.6 kilometres (km) of underground cables within the Carlow County Council (CCC) boundary and approximately 2.0 km within the Laois County Council (LCC) boundary with a voltage of up to 38 kilovolts and associated works, including a new substation within LCC, for the connection of the consented Bilboa Wind Farm (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245) to the national electricity grid; upgrading of an existing forestry track within CCC; construction of two new onsite access tracks within CCC; re-orientation and increasing in size of a crane hardstanding within CCC; and road strengthening and widening along an updated turbine delivery route, within LCC, pursuant to the consented Bilboa Wind Farm (Planning Register References; Carlow County Council 11/154; An Bord Pleanala PL 01.240245). The application is accompanied by a Planning Report, Environmental Impact Assessment Report and Natura Impact Statement.

Bilboa Wind Farm , Land in the townlands of Boolyvannan Coolnakisha Boolyrathornan , Ballinabranagh Tomard Upper Tomard Lower

1.2km
17280N/A26 Sept 2017

Retention permission for a single storey garage as built and planning permission is sought to construct a two-storey extension to the rear of their existing dwelling, to construct a single storey extension to the side of their existing dwelling, with elevational and internal modifications and all associated site developments works.

Upper Tomard , Bilboa , Co.Carlow

1.2km
17316CONDITIONAL8 Nov 2017

Retention Permission for a single storey garage as built and planning permission is sought to construct a two-storey extension to the rear of their existing dwelling, to construct a single storey extension to the side of their existing dwelling, with elevational and internal modifications and all associated site developments works

Upper Tomard , Bilboa , Co.Carlow

1.5km
22137N/A25 Apr 2022

the construction of a cattle shed underpass, slatted effluent tank and all associated site works

Tomard Lower , Bilboa , Co. Carlow

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?